Regional Haze Rule SIP Template Clean Air Corridors Section 51.309(d)(3) Brian Finneran - Oregon DEQ WESTAR 2002 Fall Technical Conference.

Slides:



Advertisements
Similar presentations
Regional Haze Update & Current Results Michele Notarianni Brenda Johnson EPA Region 4.
Advertisements

WRAP Stationary Source (SS) NOx and PM Report Lee Alter Western Governors’ Association WRAP IOC NOx Issues Meeting Denver, CO July 28, 2003.
Clean Air Corridor Section 309 Requirements Presentation to WRAP Board July 24, 2002.
Issues on Ozone Planning in the Western United States Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31, 2011.
Update on Multi-pollutant Legislation Richard Long, Region 8 Wrap Meeting Nov. 14, 2001.
IOWA Department of Natural Resources Air Quality Program Development Jim McGraw Environmental Program Supervisor  8 hr Ozone and PM2.5 NAAQS Implementation.
WRAP Status Report EPA/RPO Meeting Durham, NC February 6, 2002.
Fall Technical Conference Regional Haze SIP Development Snowbird, Utah September , 2002.
1 WRAP Fire Tracking Systems Draft Intent of WRAP FTS Policy – Assist states/tribes to address emissions inventory and tracking associated with fire in.
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
Developing a Workplan for Implementing the Strategic Plan for the WRAP Board October 1, 2008.
The Western Regional Air Partnership (WRAP) WRAP formed in 1997 as the successor organization to Grand Canyon Visibility Transport Commission (GCVTC) –
Oil and Gas Workgroup Summary October 21-23, 2009 Denver.
An Update on the Colorado Regional Haze SIP Process and Outcomes Presented at: WRAP – Implementation Work Group San Francisco, CA March 2005.
ALTERNATIVES TO BART -TRADING- Lily Wong USEPA – Region 9 September 1, 2005.
1 Update on the STIP-II Project & Draft Model SIP Brian Finneran Oregon Department of Environmental Quality WRAP Meeting Portland, OR April 3, 2003.
Next Steps in Regional Haze Planning in the Western U.S. Prepared by the WESTAR Planning Committee for the Fall Business Meeting, Tempe, AZ October 31,
Regional Haze SIP Development Overview AQCC Presentation July 2005.
1 Fire Emissions Joint Forum: Section 309 Requirements Continued… -Enhanced Smoke Management Programs -Annual Emission Goals for Fire -Fire Tracking Systems.
§309 Technical Support Document “Table of Contents” First Draft Tom Moore WESTAR Fall Technical Conference September 19, 2002.
Final Clean Air Fine Particle Implementation Rule Briefing for NTAA EPA Office of Air Quality Planning and Standards April 17, 2007.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Santa Fe December 2006 Update on Regional Haze 308 SIP Template.
Fugitive Dust Project Phase One The WRAP Emissions Forum contracted with a team of contractors lead by ENVIRON to produce regional PM 10 and PM 2.5 emissions.
Update on the STIP-II Project: Draft Model SIP Brian Finneran Oregon Department of Environmental Quality WRAP Air Manager’s Committee Santa Fe, NM March.
2005 WRAP Work Plan WRAP Board Meeting Salt Lake City, UT November 10, 2004.
Technical Projects Update WRAP Board Meeting Salt Lake City, UT November 10, 2004.
WESTAR Planning Committee Committee Update before the WESTAR Council Ray Mohr, Colorado San Diego, CA, September 23, 2005.
1 Brian Finneran, Oregon DEQ WRAP IWG Meeting, Portland August 2006 Suggested Changes to IWG Section 308 SIP Template.
Recommendations from Regional Haze Workgroup Core Issue 1: 5- Year Progress Reports The RHR requires Comprehensive SIP revision every 10 years (first in.
Modeling Forum Status Report WRAP Planning Team Meeting February 22-23, 2006 John Vimont, Mary Uhl, & Kevin Briggs, Forum Co-Chairs.
1 Incorporating Smoke Management Plans into SIPs: THE OREGON 309 SIP Brian Finneran Oregon Department of Environmental Quality Smoke Management Planning.
VISIBILITY SIPS The Regional Haze Rule Requirements for Fire The Role of the RPOs Opportunities for Participation US FISH AND WILDLIFE SERVICE Dennis Haddow.
The West is different August 14, 2013 OAQPS. Aerosols causing Worst Visibility Days – East vs. West 2.
1 Spring Business Meeting Regional Haze SIP Development Survey San Francisco, California April 9, 2003.
2005 Progress on Emissions Inventories Attribution of Haze Workgroup Meeting January 24, 2006.
1 RPO Data Analysis/Monitoring Grant Guidance Review Extracted from the EPA’s 3/5/02 RPO 4 th Year Policy, Organizational & Technical Guidance.
Funding of Regional Planning Organizations May, 2006.
Summary of WRAP Stationary Source (SS) NOx and PM Report Lee Alter Western Governors’ Association WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Strategic Plan Development Status Technical Analysis Forum meeting October 11, 2007.
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
Summary of STIP Project Workplan Development of A Model SIP/TIP for Section Brian Finneran, Oregon DEQ WESTAR Fall Technical Conference September.
Work Items for §309 SIPs WESTAR Fall Technical Conference September 19, 2002 Tom Moore & Brian Finneran.
308 Outline (a) Purpose (b) When are 1st plans due (c) Options for regional planning (d) Core requirements (e) BART requirements (f) Comprehensive periodic.
Update on the WRAP STIP-2 Project Brian Finneran Oregon Department of Environmental Quality WRAP Board Meeting, Tempe AZ November 13, 2002.
WRAP WORK PLAN UPDATE NOVEMBER 2001 Submitted to WRAP Board for Approval Andy Ginsburg ODEQ, Co-Chair IOC Forum Mike George ADEQ, Co-Chair TOC Forum.
Regional Haze SIP Template: Mobile Sources Edie Chang California Air Resources Board WESTAR Fall Technical Conference September 2002.
State Regional Haze SIP Development Critical Path for Western States.
Significance of Mobile Source Emissions for the Purposes of Section 309 of the Regional Haze Rule Patrick Cummins Western Governors’ Association WRAP Board.
Incorporating Smoke Management Plans into Regional Haze SIPs (Arizona Perspective) Smoke Management Planning Workshop WRAP 308 Planning Committee & Fire.
WESTAR Staff Reports Technical Coordinator Regional Haze Planning Training.
Regional Haze SIP Development Working Group
WESTAR Planning Committee
Arizona Regional Haze State Implementation Plan
WESTAR Planning Committee
Visibility Coordinator’s Report
WESTAR Planning Committee
WESTAR Planning Committee Report
Air Update, Georgia EPD Karen Hays Chief, Air Protection Branch
Market Trading Forum Update
WESTAR Planning Committee Report
308 VS. 309 DECISION PROCESS November 2001 WRAP Meeting
Status Report: “Significant Impact” from Mobile Sources and Road Dust
WESTAR Planning Committee Report
A Test Application of the WRAP Economic Analysis Framework Lee Alter
Workshop Technical and Policy Studies to Support the Annex
Summary of RH-LTS Requirements (d)(3)
Defining “Significant Impact” from Mobile Sources and Road Dust
Market Trading Forum Update
Status of Preliminary Reasonable Progress Analysis
EPA’s Roadmap for the Second Planning Period
Presentation transcript:

Regional Haze Rule SIP Template Clean Air Corridors Section (d)(3) Brian Finneran - Oregon DEQ WESTAR 2002 Fall Technical Conference

2 What’s the Clean Air Corridor? Region that contributes clean air… …to the 16 Class I Areas of the Colorado Plateau N S WE clean air 16 Class I Areas

WESTAR 2002 Fall Technical Conference States in the Clean Air Corridor OR ID NV UT

WESTAR 2002 Fall Technical Conference 4 How were the CAC’s identified? 1995 Report of the GCVTC Meteorological Subcommittee identified “clean air influence areas” (eastern OR, southwest ID, most of NV, and southern UT) that supplied 20% best visibility to 16 Class I areas. Met Subcommittee studied 6 different CACs & the level of visibility protection provided by each BBC Report picked 1 “intermediate” size CAC that protected 30% best days and refined the boundary.

WESTAR 2002 Fall Technical Conference 5 GCVTC Recommendations on CACs CAC emissions growth not expected to have perceptible effect on visibility in 16 Class I areas thru No regulatory programs needed for CACs - just regional emissions tracking to ensure frequency of clear days does not decline. Identify patterns of emissions growth inside & outside the CAC that could have a negative impact on visibility.

WESTAR 2002 Fall Technical Conference 6 Clean Air Corridor Requirement Section 309(d)(3): “ T he plan must describe and provide for implementation of comprehensive emission tracking strategies for clean-air corridors to ensure that the visibility does not degrade on the least-impaired days at any of the 16 Class I areas.”

WESTAR 2002 Fall Technical Conference 7 The 5 CAC requirements in Sec Adopt a Comprehensive Emissions Tracking program. 2. Identify the boundary of the CAC in your state. 3. Identify patterns of growth that could cause significant emissions increases resulting in visibility impairment in 16 Class I areas. 4. Identify any significant emissions growth outside the CAC that could impair the CAC and lead to visibility impairment in 16 Class I areas. 5. Determine if any other CAC’s exist.

WESTAR 2002 Fall Technical Conference 8 Related CAC requirements If impairment is found (#3 and #4): – analyze effects of increased emissions; – determine need for any additional emission reduction measures; – Implement these measures if needed. If “other CAC” are found (#5), identify if measures are needed to protect them.

WESTAR 2002 Fall Technical Conference 9 Issues identified in CAC Template 1) How do States identify boundaries of CAC? 2) What constitutes “significant emissions growth” inside the CAC? 3) How do States identify significant emissions increase outside the CAC & how much impairment in the CAC would trigger some action by the State? 4) What criteria does the State use for adopting additional measures if impairment is found? 5) How to determine if “other CACs” exist?

WESTAR 2002 Fall Technical Conference 10 Dec 2001 IOC Work Group formed to address CAC issues for 309 SIP submittal. Preliminary recommendations are: 1) Use the CAC boundary in the BBC Report 2) Use 25% emissions increase as “significant”, based on GCVTC findings. 3) Emission projections (2018) of SO2, NOx, VOC & PM expected less than significant. 4) Track emissions every 5-yrs w/SIP updates. 5) No other CACs found. How Template Issues were resolved

WESTAR 2002 Fall Technical Conference 11 Some CAC tasks that remain… Is >25% significance level needed for CAC area closer to the Colorado Plateau? WRAP still needs to complete Comprehensive Emissions Tracking Program for CAC States. Figure out how to track “spillover” emissions from outside” the CAC. How to address emissions from Tribal lands inside and outside CACs. Still need to develop criteria for how States identify add’l measures if impairment is found.