Project Planning Update 13th Technical Board Meeting Luisella Lari Head planner for Accelerator & Senior Scientist www.europeanspallationsource.se May.

Slides:



Advertisements
Similar presentations
Organizational Succession Planning Board Discussion Framework.
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Conference Title L. Stringhetti, IASF Milano, ASTRI Meeting #9, Bologna 24 Feb Status of the ASTRI/CTA project and organization/management issues.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Microsoft Office Project Portfolio Server
Role of Management and Technical Coordination
Lali Tchelidze Safety work package leader
OSF/ISD Project Portfolio Management Framework January 17, 2011.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
General Assembly 2 - JERICO - 1 Patrick Farcy I Ifremer I Financial Management WP11 Jerico GA I Oslo I Norway.
Improving Results Reporting Regional DRR Meeting Istanbul, December 2008 Bratislava Regional Center Management Practice.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
Establishing the Education and Skills Authority: A Strategy for Taking Forward the Change.
Ocean Observatories Initiative OOI CI Release 3 (Scope To Complete) Kick-Off Tim Ampe: System Development Manager Release 3 Kick-off La Jolla, CA October.
Management Report Annette Freibauer Management Report Annette Freibauer Max-Planck-Institute for Biogeochemistry, Jena.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Managing Accelerator Quality Matthew Conlon 13 April 2015.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
16 Ways To Take To Work. How Would You Use PBwiki At Work? Over 1,000 non-business users were surveyed How would you use PBwiki at work? All responses.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
X Project Highlight Report – (Date) Achievements  Key high level outputs delivered by the project this month. Communications Key high level communications.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
1 PROJECT MONITORING & CONTROL. 2 Project Monitoring and Control Why do we monitor? What do we monitor? When to we monitor? How do we monitor?
Update to NLAG board 22 nd December Sep Jan MCE Workforce and OD Oct Nov Dec IM&T Estates Finance In hospital Model Out of hospital Model Progress.
Project Management Overview U08784Software Project Management Rosemary Phillimore.
Accelerator/program Mats Lindroos Head of accelerator April 21, 2015.
WP7 Plan – Pilot TSS Cost – Risks Linda R. Coney Group Leader – Target Safety and Controls 15 – 16 February 2016.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
PIP-II Resource Loaded Schedule (RLS) ---- Step Luisella Lari 13 May, 2016.
MS Office Project Portfolio Server Overview of Project Server Gateway.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Conference of Young Scientists and Specialists "Alushta 2016" Morozov V.
Agenda ESS Schedule Objectives and Current status Overview/Introduction Tools and Process ESS integrated master schedule Milestones.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Status of Primavera (P6) Accelerator Plan & an Introduction to the Accelerator Installation Plan Luisella Lari Head planner for Accelerator & Senior Scientist.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
ESS Program Plan and Schedule Update
Project Management PTM721S
Oct 22 Group Leaders Planning meeting
Organizational Succession Planning
Managerial Accountability
ENGINEERING MANAGEMENT (GE 404)
CMAST Update March 25, 2014.
What would improve the RAG status when red or amber
EVLA Advisory Committee Meeting
How to keep your Enterprise GIS Project on Track
ENGINEERING MANAGEMENT (GE 404)
AMICI WP1 – Management, coordination and dissemination
Welcome & Charge for the Meeting
TOP6 – WP4 Coordination and Management JPICH Coordination Office
What would improve the RAG status when amber or red
Status of Control Services ICS WP10 (accelerator integration work package) Tuesday 20th November
What would improve the RAG status when amber or red
Krzysztof Czuba ESS LLRF Quarterly Meeting
High Level Readiness Reviews
Feedback from IKON 14 Spectroscopy.
Accelerator NCFE Liaison Officer
Status of the ESS High Power RF Systems
TOP6 – WP4 Coordination and Management JPICH Coordination Office
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
East Hall under construction
MAORY Status of the project
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

Project Planning Update 13th Technical Board Meeting Luisella Lari Head planner for Accelerator & Senior Scientist May 21st, 2015

Outline Annual review top ten actions  for planning. Other short term improvements in P6. Few words about the P6 WP standardization. Next steps/Conclusions. 2

Main annual review outcomes for planning 1.Schedule: identify milestones with better visibility: i.e. Module-0, Production Readiness Review, anchor them clearer to the installation. 2.In due time review the schedule for operation from Dec 2019, with the goal of optimising scientific success from the start of user operation in

Annual review outcomes  about the 1st 1.identify milestones with better visibility 2.Production Readiness Review 3. anchor them clearer to the installation. present in P6: 53 PDR, 58 CDR, 13 TRR Some actions on-going in collaboration with the Integration team

Annual review outcomes  about the 2nd Schedule for operation  interface with Initial operation plan 5 Presented by M. Annual review 2015 To be reviewed in details with the integration and commissioning teams

Short term improvements in P6 1.Review the Procurements plan  introducing the procurement template (and Procurement ID) in all WP (> 200 kEUR) 2.Review/Introduce installation WUs - where necessary - and link them to the installation plan in P6 3.Review rack and cable plan 4.Review some In-Kind plans (in particular need to review lags, and some detailed delivery dates) 5.Review some links (vacuum/magnets/beam instrumentation) 6.Staff plan  link HR role with names 6

Short term improvements in P6 7 Since the annual review the P6 schedule is in-line with the In-kind plan from Hakan  P6 used as reference.

P6 standardization My goal is to standardize the different WPs activities/tasks, in order that everyone can find the info needed from different WPs. 8 Done for MS

P6 standardization  why? To follow better the progress! 9 SV=EV-PV=-1.1 MEUR CV=EV-AC=+2.3 MEUR SV=EV-PV=-1.1 MEUR CV=EV-AC=+2.3 MEUR 31/12/201331/12/201431/01/201528/02/201531/03/201530/04/2015 Earned14,709,40131,902,07234,081,19536,218,38139,725,51941,555,714 Actuals14,709,40132,562,93034,878,61235,533,40837,955,48939,250,707 Scheduled14,709,40132,457,79034,162,00637,255,02640,061,04942,620,253

Next steps/Conclusions 1.Moving into a stable baseline schedule  “big” replanning open actions are related to installation WU and standardization (quality of the schedule). 2.  Moving into a more formal change control for AD (John and I are working on a formal doc soon in CHESS) 3.Every end of the month a pdf copy of the schedule will be put in ESSShare/Machines Directorate/Accelerator division/Division Specific/Planning/ACCSYS Schedule Apr 2015/ 10

Installation Plan in P6 4.Focus on Project 11I (installation plan), in collaboration with the system engineer/integration group and WP leaders. 5.Budget 2016 (end of June first draft) 6.IPAC15 paper on planning 11

Thanks for your attention! In particular I would like to thank L. Gunnarson