Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.

Slides:



Advertisements
Similar presentations
Kitakami IR Access Discussions T. Markiewicz/SLAC 13 May 2014 SiD Meeting / AWLC Fermilab.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Skyscraper Construction
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Lecture 4 Excavating and Lifting
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
A. Hervé - 13 august 2007 ILC-IRENG Meeting of Working Group A: 13 Aug 07 Proposal for an Experimental Area With only One Large Shaft A. Hervé/CERN.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Construction and Installation of the CLIC Experimental Area
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
1 GLD Surface Assembly Y. Sugimoto KEK
ILC A SIAN D RAFT S CHEDULE K Foraz, M Gastal & J Osborne Many thanks to all contributors.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
M EGATON M ODULAR M ULTI -P URPOSE N EUTRINO D ETECTOR Ventilation Cooling Mark A. LaurentiMarch 2002 Modular Configuration.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 1 What is included in the Cost Estimates for the ILC Detectors? Peter.
Construction Beam Tunnel
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Access Hall Study for Cryogenics High Energy Accelerator Research Organization KEK- LC Project Office Masanobu Miyahara 2 Nov
Excavation and lifting Excavator: Power driven digging machine Types 1. Hydraulic excavator 2. Cable operated excavator 3. Shovel 4. Draglines 5. Hoes.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC Utility Design Study for Kitakami-site
Civil Design for Tunnel Case Studies
Experimental Hall in Mountain Regions
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Handling Engineering Update
Updated Design of Detector Hall
Introduction and Meeting Objectives
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
$150K Chicago/ANL seed funding for Braidwood site investigation
Update of experimental hall in Japanese mountain site
Detector Service Cavern for ILC
Hybrid Access Optional Study
Detector hall in mountain regions
Status of Cryogenics Facilities Design
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
A. Datum Corporation Bid package overview
Cost & Schedule between Shaft and Adit for Access of Detector Hall
A. Datum Corp. Bid package overview.
Minuteman Vocational Technical Regional High School Progress
Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.
Detector hall in mountain regions
RDR Baseline Layouts for Interaction Region
Kitakami IR Access Discussions
8-10 April 2014 CFS-ADI Joint Meeting
Presentation transcript:

Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN

The Configuration of the Baseline and the Hybrid A’ Outline of the Construction Schedule ‒ The Baseline ‒ The Hybrid A’ ‒ Assumption of the schedule Issues 2 Contents MDI-CFS Meeting - Ichinoseki City, JAPAN

Baseline 3MDI-CFS Meeting - Ichinoseki City, JAPAN

4 Hybrid – A’

Ex. Tunnels around D/H 5 Outline of the Detector Hall (D/H) construction procedure - Baseline Design - Time-line (const. period: months) Lower A/T Upper A/T Upper A/T Cavern Ex. by bench cut Cavern Ex. by bench cut Concreting Utilities (Pipes, Ducts etc.) Utilities (Pipes, Ducts etc.) Pacman, Platform Pacman, Platform ILD, SiD Assembling ILD, SiD Assembling Assembly Hall A/T portal) Access Tunnel (A/T) Access Tunnel (A/T) MDI-CFS Meeting - Ichinoseki City, JAPAN Crane Tunnels Detector Hall(D/H) Assembly Utilities & Test Equip DR A/T

6 Outline of the Detector Hall (D/H) construction procedure - Hybrid A’ Design - Time-line (const. period: months) Utility Shaft Utility Shaft Concreting Utilities (Pipes, Ducts etc.) Utilities (Pipes, Ducts etc.) Pacman, Platform Pacman, Platform SiD Assembly Assembly Hall (above the D/H) Assembly Hall (above the D/H) DR A/T MDI-CFS Meeting - Ichinoseki City, JAPAN Crane Tunnels Detector Hall(D/H) Utilities & Test Equip Assembly Main Shaft Main Shaft Cavern Ex. by bench cut Cavern Ex. by bench cut ILD Assembly 97.0 Platform 37.0 Platform Ex. Tunnels around D/H 29.4 Underground assembly Underground assembly 91.0 Lowering

MDI-CFS Meeting - Ichinoseki City, JAPAN7 Const. Schedule for the Baseline Design

8MDI-CFS Meeting - Ichinoseki City, JAPAN Const. Schedule for the Hybrid A’ Design

- Backhoe - Wheel Loader - Jumbo - Shotcrete Machine - Crawler Drill - Dump Truck - Lifting Equipment 87.6m 108.0m 42.0m Excavation Method for the Baseline Excavation Method for the Hybrid-A’ 144.0m 42.0m 9MDI-CFS Meeting - Ichinoseki City, JAPAN

Preparation work : Land forming - 6 months + temporary work - 2 months Access tunnel gradient (only for Baseline) : max. 10% D/H excavation commencement Baseline: After completion of upper A/T Hybrid A’: After completion of the main shaft (by using the main shaft) Construction speed of tunnel and D/H: same as the TDR Construction speed of shafts (only for Hybrid A’) : newly estimated Utility shaft (only for Hybrid A’): After completion of the utility cavern Detector platform installation After completion of the D/H floor concreting and utilities installation 10 Assumption for the schedule MDI-CFS Meeting - Ichinoseki City, JAPAN

Detector assembly Baseline: to be assembled in the underground Detector Hall Hybrid A’: to be assembled on the ground surface ‒ ILD: to be assembled on the floor of the assembly hall (5 pieces) ‒ SiD: to be assembled on the platform basically (only 1 piece will be assembled on the floor) Platform for the detector installation is to be made in the beginning of the assembly in parallel ‒ Parallel work might be carried out in the assembly hall ‒ For SiD, platform might be constructed during the detector assembling which will be assembled on the floor (not on the platform) MDI-CFS Meeting - Ichinoseki City, JAPAN11 Assumption for the schedule

When are the surface platforms located in assembly hall installed? Parallel work is possible or not. It’s assumed that they will be made in the beginning of the detector assembly. ‒ The detector assembly and platform construction is to be carried out in parallel. ‒ 6 months was considered. It will not affect the detector assembling schedule because of the parallel work. ‒ Otherwise, the platform installation period (6 months) might be affect the detector assembling schedule, or surface assembly yard might be increase in size for the platform assembly yard securing. Whether or not the environment affect the detector assembly, is not clear. ‒ Therefore, we would like to consider the possibility of the steel construction applicability for the platforms (not reinforced concrete). 12 Issues MDI-CFS Meeting - Ichinoseki City, JAPAN