1 12/02/2010 PHENIX WEEKLY PLANNING 12/02/2010 Don Lynch.

Slides:



Advertisements
Similar presentations
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
Advertisements

1 12/3/2009 PHENIX WEEKLY PLANNING 12/3/2009 Don Lynch.
1 2/11/2010 PHENIX WEEKLY PLANNING 2/11/2010 Don Lynch.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
2/2/20121 PHENIX WEEKLY PLANNING 2/2/2012 Don Lynch.
1 4/7/2011 PHENIX WEEKLY PLANNING 4/7/2011 Don Lynch.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.
12/22/20111 PHENIX WEEKLY PLANNING 12/22/2011 Don Lynch.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
5/5/11 1 PHENIX WEEKLY PLANNING 5/5/2011 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 12/09/2010 PHENIX WEEKLY PLANNING 12/09/2010 Don Lynch.
1 11/12/2009 PHENIX WEEKLY PLANNING 11/12/2009 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
1 3/24/2011 PHENIX WEEKLY PLANNING 3/24/2011 Don Lynch.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
1 10/28/2010 PHENIX WEEKLY PLANNING 10/28/2010 Don Lynch.
2/14/20131 PHENIX WEEKLY PLANNING 2/14/2013 Don Lynch.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
4/24/ PHENIX WEEKLY PLANNING April 24, 2014 Don Lynch.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
3/20/ PHENIX WEEKLY PLANNING March 20, 2014 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
1/26/20121 PHENIX WEEKLY PLANNING 1/26/2012 Don Lynch.
11/10/20111 PHENIX WEEKLY PLANNING 11/10/2011 Don Lynch.
5/12/11 1 PHENIX WEEKLY PLANNING 5/12/2011 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
1 11/04/2010 PHENIX WEEKLY PLANNING 11/04/2010 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
1 1/20/2011 PHENIX WEEKLY PLANNING 1/20/2011 Don Lynch.
1 3/31/2011 PHENIX WEEKLY PLANNING 3/31/2011 Don Lynch.
10/20/20111 PHENIX WEEKLY PLANNING 10/20/2011 Don Lynch.
1 6/23/2011 PHENIX WEEKLY PLANNING 6/30/2011 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/31/2009 Don Lynch.
8/11/20111 PHENIX WEEKLY PLANNING 8/11/2011 Don Lynch.
1 1/14/2010 PHENIX WEEKLY PLANNING 1/14/2010 Don Lynch.
1 12/17/2009 PHENIX WEEKLY PLANNING 12/17/2009 Don Lynch.
12/15/20111 PHENIX WEEKLY PLANNING 12/15/2011 Don Lynch.
1 5/19/2011 PHENIX WEEKLY PLANNING 5/19/2011 Don Lynch.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
11/17/20111 PHENIX WEEKLY PLANNING 11/17/2011 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
1 2/4/2010 PHENIX WEEKLY PLANNING 2/4/2010 Don Lynch.
Presentation transcript:

1 12/02/2010 PHENIX WEEKLY PLANNING 12/02/2010 Don Lynch

2 12/02/2010 Design, Eng’g, fabrication, procurement and site preparation tasks in support of shutdown tasksDone Shutdown Startup TasksDone Gas system maintenance, repair and upgradeIn progress12/24 PHENIX Infrastructure maintenance, repair and upgradeIn Progress12/24 Remove RPC PrototypesDone Remove HBDDone Remove RXNPDone Remove/Reinstall BBCDone Remove Re-install MPCIn Progress12/3 RPC3N & MuTrigger unfinished businessDone Remove current BP, install new BPDone DC/PC maintenance and repair (mid summer)Done Install RPC3S (including Absorbers)Done MuTr maintenance, repair and upgradeIn Progress12/24 Install VTXIn Progress12/ Shutdown (Overview) Start Date End Date

3 12/02/2010 This Week: Survey MMS, CM and beampipe Re-install BBC’s and MPC’s Survey of VTX West Continue VTX Cabling and Piping Complete RPC3S services Install VTX East Install VTX Services Continue restoring services to CM and MMS Future upgrades support

4 12/02/2010 Next Week Complete VTX Installation Begin End of shutdown tasks Complete restoring services to CM and MMS Final VTX Survey Install RPC1 Prototype and Prototype PE & Pb Absorbers Roll –in EC Future upgrades support

5 12/02/2010

6

7

8

9

10 12/02/2010

11 12/02/2010

12 12/02/2010

13 12/02/2010

14 12/02/2010

15 12/02/2010 Borated Poly Absorbers, (Lead Absorbers are below, not seen in picture)

12/02/ Prototype Absorbers go here RPC1 Prototype Goes Here

12/02/ Installation scheme for Borated Poly and lead prototypes: Installation support structure attached to CM Prototype absorbers lifted with crane, attached to installation support structure by trolley and slid into position Shelf support to help align and position absorber prototypes.

12/02/ Installed Borated Poly & Lead Absorber Prototypes Installed Stainless Absorbers RPC1 Prototype Support Structure RPC1 Prototype

19 12/02/2010 ProjectTask Completion Date Task DurationPersonnel reqmtsNotes PHENIXChiller cooling waterDone VTXAssemble west 1/2 detector Done VTX Design survey theodolite support brackets for CM lead shield Done VTXRoute fibers rack room to CME RackDone PHENIXBakeout/activate NEG for new BPDone PHENIXLeak check new BPDone VTXTest west 1/2 detectorDone VTXSurvey east barrels 1-4Done PHENIX Re-run MuTriggger fiber from MMS to rack room Done VTXFabricate survey support bracketsDone VTX Bring Support structure to Chem Lab - Done Done VTXInstall survey support bracketsDone Remaining Shutdown Tasks

20 12/02/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes RPC3SBuild TVB wallDone VTXSurvey west 1/2 detectorDone VTX Re-install bridge water manifold and cable trays Done VTXChiller platform 480V powerDone VTXAssemble east 1/2 detectorDone PHENIX Re-install MuTr station 2 channel air distribution Done VTXPrepare thermocouple mapDone VTXTest east 1/2 detectorDone VTX Install NOVEC piping from chiller platform area to VTX area Done VTX Receive extension rails/design/modify for installation Done VTXSurvey east 1/2 detectorDone PHENIXInstall access to inside MMSDone

21 12/02/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes VTXMate east and west 1/2 detectorsDone VTXSurvey/align east and west detectorDone VTXModify strongbacks for basket liftDone VTXInstall extension railsDone PHENIXVeterans Day HolidayDone RPC3SNRTL cable traysDone VTXTransport west 1/2 detector to IRDone VTXInstall west 1/2 detectorDone VTX Assemble and install NOVEC distribution manifolds near VTX Done RPC3SRe-install shieldingDone VTXInstall humidity sensorsDone PHENIXRemove bakeout equipmentDone PHENIX Survey and align MMS, CM and new BP Done

22 12/02/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes PHENIXAnnual PHENIX Safety ReviewDone PHENIXInstall power upgrade to bridgeDone RPC3SFinalize cable tray/Cable installationDone RPC3SFinal pipingDone VTX Install west 1/2 detector Bias, LV and signal cables Done VTX Install one Chiller for QA testing (on ground) Done VTX Connect west 1/2 detector to NOVEC cooling Done VTXSurvey/align west 1/2 detectorDone VTXTransport east 1/2 detector to IRDone RPC1&Abs Proto Installation planDone RPC1&Abs Proto WPDone PHENIXRe-install BBCs cabling/cooling pipesDone PHENIXRe-install BBCsDone PHENIX AH South exit chiller platform installation Done VTXInstall 3 chillers on chiller platformDone

23 12/02/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes VTXInstall east 1/2 detectorDone VTX Route 100 LV cables from bridge rack to near VTX Done VTX Route 260 duplex/simplex fibers from CME rack to near VTX Done VTX Route 7 Belden 16 pair cable trunks from CME rack to near the VTX Done PHENIX Install East Vertical Lampshade on MMS Done VTXSurvey/align east 1/2 detector12/2/20101 day PHENIX tech, designer, 2 surveyors after installation RPC3SThermostats12/3/20101 day1 electricianAs convenient RPC1&Abs Proto Installation fixtures design and fabrication 12/3/20103 days PHENIX ME, Designer In Progress VTXInstall interlock PLC on bridge12/3/20102 weeks PHENIX EE, electrician, 1 PHENIX Tech As soon as PLC is ready VTX Route 100+ thermocouple extensions from PLC box to near VTX 12/3/20101 day3 PHENIX techs In Progress RPC3S Re-install FCAL and any other disrupted subsystems 12/3/20102 days 2 PHENIX techs, 1 PHENIX EE As convenient VTX Install east 1/2 detector Bias, LV and signal cables 12/3/20101 week2 PHENIX techsafter survey PHENIXWP for DC repairs12/3/20102 daysMEAs convenient

24 12/02/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes PHENIXRe-install MPCs12/3/20101 week2 PHENIX techsIn Progress VTX Connect east 1/2 detector to NOVEC cooling 12/3/20102 days2 PHENIX techs Immediately after survey VTX In situ QA electronics test on east 1/2 detector 12/3/20102 days PHENIX scientists A/R As services are installed VTXFinal VTX survey12/3/20101 day 1 PHENIX tech, designer, 2 surveyors After east QA VTXFinal BP survey12/3/20101 day 1 PHENIX tech, designer, 2 surveyors After east QA PHENIXInstall MuID collars12/6/20101 day3 PHENIX techsAfter EC in IR PHENIX Re-attach cables, gas piping, water piping and fibers to CM and MMS 12/7/20102 weeks3 PHENIX techsIn Progress PHENIX MuTr and MuTrigger remaining subsystem tasks and tests 12/7/20102 weeks 1 PHENIX techs MuTr/Trig Groups As convenient PHENIX Remove manlifts, decking and 12 ton crane from IR to run storage 12/8/20101 day3 PHENIX techs After BBCs & MPCs & VTX installed PHENIXMove MuID collars to IR12/8/20101 day3 PHENIX techsAfter BBCsMPCs PHENIXPrep EC for move to IR12/8/20101 day3 PHENIX techs After BBCs & MPCs & VTX PHENIXMove EC to IR12/9/20101 day3 PHENIX techsAfter Prep

25 12/02/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes PHENIXDesign CM alignment stops12/10/20101 weekME, designerAs time permits PHENIXFabricate CM alignment stops12/10/20101 weekCSAfter design PHENIXClose access to MMN12/10/20101 day1 PHENIX tech > MuTr/ Trig < flam gas RPC3S RPC gas controllers final installation and RPC subsystem commissioning 12/10/20101 week 1 PHENIX tech, RPC Group As soon as convenient PHENIXWire dumb waiter12/10/20101 dayElectrician After dumb waiter installed PHENIX Fold down EC platforms and install dumb waiter 12/10/20101 day 2 carpenters, 2 riggers After EC in IR PHENIX Re-install EC cables, fibers, water and gas piping 12/10/20104 days 3 PHENIX techs, 2 scientists, 1 electrican After EC in IR PHENIXDC repairs12/15/20103 days 1 PHENIX tech, PHENIX scientists A/R After EC cables, etc. installed PHENIX Gas mixing house R-134A shed addition R134A bottle warmers 12/15/20101 day1 PHENIX Tech Get CAD approval then order. Install when convenient PHENIX Pink sheets, blue sheets, white sheets 12/24/20102 weeks 2 PHENIX techs, PHENIX scientists A/R After DC Repairs PHENIX Chiller platform fire detection and suppression 12/24/20101 week 1 CAD plumbers, 1electrican ASAP after platform is installed

26 12/02/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes PHENIXAssemble shield wall12/24/20104 days1 rigging crew After EC rolled in PHENIXStart flammable gas12/24/20101 day1 PHENIX tech After shield wall in place FoCal ProtoDesign plan12/30/20102 weeksPHENIX MEIn Progress FoCal ProtoInstallation plan12/30/20102 weeksPHENIX MEIn Progress PHENIXInstall plug door12/30/20101 day1 rigging crew After shield wall built PHENIXClose shield wall12/30/20101 day3 PHENIX techs After pink/blue/white sheets PHENIXInstall safety interlocks12/30/20101 dayCAD safety After shield wall closed PHENIXClose out all 2010 shutdown WP's12/31/20101 day1 PHENIX ME After shutdown completed RPC1&Abs Proto Electronics & Gas Support Installation 12/31/20113 days3 PHENIX techsIf Time Permits PHENIXEnd of shutdown party1/7/20111 dayAll of PHENIX After shutdown completed

27 12/02/2010 Remaining Shutdown Tasks, Continued ProjectTask Completion Date Task DurationPersonnel reqmtsNotes RPC1&Abs Proto Installation12/8/20103 days3 PHENIX techsIf Time Permits FoCal ProtoESRC review>1/1/2011???2 weeksPHENIX MENot Scheduled FoCal ProtoSupport structure design>1/1/2011???3 days PHENIX ME, Designer Not Scheduled FoCal ProtoSupport structure fabrication>1/1/2011???2 weeks 2 PHENIX techs, CS Not Scheduled FoCal Proto Electronics, cooling, gas support design >1/1/2011???3 days PHENIX ME, Designer Not Scheduled FoCal Proto Electronics, cooling, gas support fabrication >1/1/2011???1 week2 phenix TECHSNot Scheduled FoCal Proto Electronics, cooling, gas support installation >1/1/2011???3 DAYS3 phenix TECHSNot Scheduled FoCal ProtoSupport structure installation>1/1/2011???2 DAYS3 phenix TECHSNot Scheduled

28 12/02/2010 Roof leaks in utility bathroom at northwest corner behind tech offices, over door between rack room and assembly hall and over door between control room and elect. ass’y room. General maintenance for Trailer Offices (in progress) Roof leaks in laser room and IR (southeast corner) Flooding in AH/ Driveway heaving [Lake PHENIX] New HVAC in Control Room and Conference Room 2010 Building Maintenance Issues

29 12/02/2010 PHENIX Procedure Review Current Status: 148 Procedures Identified 85 Made Inactive (not currently in use, will require revision to re- activate if and when necessary, available for reference purposes) 9 CAD procedures relevant to PHENIX, all are up to date and available on the CAD web site 42 PHENIX approved procedures. all are current and up-to-date (1 of these soon needs updating) 11 Proposed/Draft Procedures (never previously formalized) (3 are ready for review) Web retrieval of latest procedures now available from PHENIX Internal:

30 12/02/2010 Safety, Security, Etc. 1.Annual PHENIX Safety review: no significant problems, waiting for minutes/action items 2.RPC1 Prototype & Borated Poly/Lead Absorber Review Detector and absorber info and installation plan sent to Y Makdisi & CAD Safety. 3.Focal Prototype Review: Not enough info yet. Meeting w/ Ed K. on Monday 4.BNL Standards for Ethics – Required Training Due by 12/31 5.From Ray Karol : Do Not Park Near Fire Hydrants 6.In preparation for the next run: get ODH training up to date: ODH- 1 web course, ODH-1 practical training up-to-date, current physical. - check POM calibrations, documented monthly escape pack inspections per C-A-OPM 13.26, rev 01.

31 12/02/2010 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, archives of past meeting slides,long term planning, pictures, videos and other technical info can be found on the PHENIX Engineering web site: We’re coming down the home stretch for the 2010 Shutdown. Jets vs Patriots On Monday Night!