Resource Development Council 22nd Annual Conference November 29, 2001 Anchorage, Alaska Pipeliners Adding Value Wayne Sartore Vice President Northern Pipeline.

Slides:



Advertisements
Similar presentations
A Northern Gas Pipeline: The Big Picture Patrick D. Daniel President & CEO Enbridge Inc. : Far North Oil & Gas Conference September 20, 2001.
Advertisements

Kraft Fuels & Enbridge NGV Division July 2006 Kraft Fuels/Alternate Fuels Technology Enbridge Gas Distribution Toronto, Canada.
Demonstration Grant PARTNERS FOR PIPELINE SAFETY WEB PAGES Develop interactive and informative webpage for residents, property owners, contractors and.
113 East College Avenue, Suite 200 Tallahassee, Florida
0 Addison Natural Gas Project Hinesburg Selectboard May 21, 2012.
Edmonton, Alberta June 19, 2008 Canadian Energy Update Chuck Szmurlo Vice President, Alternative & Emerging Technology Enbridge Inc.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Asset Optimization using PI and AF Regional Seminar Series Cincinnati.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Economic Analysis of Future Offshore Oil & Gas Development: Beaufort Sea, Chukchi Sea, and North Aleutian Basin A study to describe and quantify potential.
FAA Strategic Planning Flight Plan Update James Ballough Director, Flight Standards Service November 2004 Flight Standards Service.
You Don’t Always Have To Be Told What To Do Christina Sames Vice President Operations and Engineering November 2011.
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
Trans-Alaskan Pipeline Private Industry’s Most Expensive Undertaking.
The Market Outlook for Natural Gas: The Wyoming Natural Gas Pipeline Authority’s Perspective Wyoming Geological Association Conference Prepared: July 26,
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
Ocean Renewable Power Company Chris Sauer, President & CEO 2013 Arctic Energy Summit Akureyri, Iceland October 9, 2013.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
Using Total Cost of Ownership To Make Decisions League of Innovation Conference March 13, 2013 Greg Nelson Vice President of Administrative Services.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
Alaska Natural Gas Transportation System A North American Energy Solution Alaska Natural Gas Transportation System A North American Energy Solution November.
1 Toronto, Ontario - October 31 and November 1, 2002 October 31, 2002 David Dern Technology Roadmap for Intelligent Buildings Marketing Director Continental.
ALASKA NATURAL GAS SYMPOSIUM Regulatory Update J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission December 2, 2004.
Alaska Producer Pipeline Update May, May Outline of Information Overview and Conclusions Project Design and Technology Updated Project Feasibility.
Title Of Presentation CONNECTING THE NORTH Arctic Gas Symposium November 2001 Houston, TX.
1 Northern Pipelining & Practical Experience Presentation to:APEGGA April 21, 2005 Calgary.
Demonstrating Sustainable Energy Technologies Michael J. Kelleher Executive Director Energy and Sustainability SUNY College Of Environmental Science and.
September 5,  Mission - To provide Excellent Service to Our Distribution Members by creating opportunities, cultivating cooperation, and navigating.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
A View to The North Canadian International Petroleum Conference June 12, 2001 A View to The North Canadian International Petroleum Conference June 12,
Alaska Municipal League 59th Annual Local Government Conference The Programs of the Alaska Energy Authority Energy and Empowerment for Your Communities.
Arctic Resources Company Northern Gas Pipeline Project Forrest E. Hoglund Chairman & Chief Executive Officer.
Informed Planning Near Pipelines Brought to you by a Community Technical Assistance Grant from the U.S. Dept of Transportation.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
ALASKA STATE LEGISLATURE Joint Committee on Natural Gas Pipelines November 8, 2001 Natural Gas Company.
Natural Gas What future do you see for natural gas consumption? What do you make of Judge Cudahy’s warnings about our ability to make predictions like.
The Great Northern Pipeline Debate Stephen J. Wuori Group Vice President Planning and Development Arctic Gas Symposium November 30, 2001 Houston, Texas.
A Northern Pipeline Not if, but When? A Northern Pipeline Not if, but When? 4th Annual Far North Oil & Gas Conference September 30, 2002 Presented by:
What’s Wrong with Integrity Management? How Do We Improve Integrity Management? Terry Boss Senior Vice President Safety Environment and Operations PST.
XP06432_7 Mackenzie Gas Project Next Steps Toward a Mackenzie Valley Natural Gas Pipeline.
Improve Operations with Data-Driven Decision Making.
Blunting the peak – oil sands supply and peak oil Mike Ashar Executive Vice President Suncor Energy Association for the Study of Peak Oil and Gas Denver.
Wood Group – an overview A global market leader in: - services for the oil & gas and power generation markets - deepwater engineering - enhancement.
Copyright: Shell Exploration & Production Ltd. Creating Business Value Through Strong Product Stewardship Sam Smolik Vice President HSSE/SD Shell Downstream.
2003 Natural Gas Market Needs Ziff Conference October 29, 2002 Steve Becker Vice President, Gas Strategy.
Overview & Status for: International Association of Energy Economists Alaska Chapter October 25, 2001 Anchorage, Alaska.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
North East Gas Interconnector Project Community and Business Roadshow July 2015.
Southeast LDC Gas Forum Infrastructure Updates… Expanding Your Distribution Network Beyond the Pipeline April 12, 2016 Atlanta, Georgia David Lavoie Vice.
Public Participation in Sustainability Planning and Socio-Economic Impact Assessment in Canada.
Alaska Legislature Senate/House Resources & Energy Committees February 2010.
Development in the Tundra A Case Study of the Trans-Alaskan Pipeline.
Feasibility of a LNG Pipeline in Alaska ENGL 212: Technical Writing William Columbus.
ALASKA GASLINE DEVELOPMENT CORP. | Tel: | Toll-Free: | Fax: | Website: 1 ASAP Project Update Presented.
Freight Rail in Georgia Creating Jobs Moving Georgia Forward GRA Website.
. com Page 1 ENRON.COM Sketches for New Services Area May 18, 2000 *This presentation includes sample content from the Energy Transportation Services area.
Expanding Your Distribution Network Beyond the Transmission Pipeline
Wind Development in an Evolving Power Market
Enbridge Presentation to the NEB Modernization Expert Panel Edmonton, AB – Mar 7, 2017.
Expanding Your Distribution Network Beyond the Transmission Pipeline
Pierre Alvarez, President Canadian Association of Petroleum Producers
Northern Pipelining & Practical Experience
Modernization of the National Energy Board
Presentation at Arctic Security of Government Research Workshop
Financial and IT Services
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
The Technical Opportunities and Economic Implications of Permafrost Decay on Public Infrastructure in the Northwest Territories Ed Hoeve, P. Eng., TetraTech.
Presentation transcript:

Resource Development Council 22nd Annual Conference November 29, 2001 Anchorage, Alaska Pipeliners Adding Value Wayne Sartore Vice President Northern Pipeline Development Enbridge Inc.

Enbridge: North & South America

Energy Value Chain Exploration & Production Gas Treatment Pipeline Transportation End User Enbridge

Customer Service Customer requirements – Safety Excellence – Environmental Stewardship – Cost Effective – Reliability of Operation – Stakeholder Relations – Creative and Innovative – “World Class” Service

Prudhoe Bay Inuvik Norman Wells Anchorage Whitehorse Yellowknife Edmonton “Northern” Pipeline Challenges Unique “Northern” P/L Issues n Capital Cost n Geography, Remote Access n Permafrost Enbridge Northern Expertise n Norman Wells Pipeline n Inuvik Gas Experience Applied to the Future n Sub-surface construction in permafrost n Pipeline integrity monitoring n Innovative cost reduction opportunities Enbridge is route neutral

Northern Expertise n Built 1985  only major pipeline in NWT Right-of-Way =869 km(540 mi) Pump stations = 3 Pumps = 6 Employees = payroll = $1.5M 2000 capital costs = $568, property taxes = $1.4M 2000 power costs = $760,000 Alaska Inuvik Norman Wells Zama Norman Wells Pipeline

Northern Expertise Cdn $44 million project: Two wells Production facility 50 kilometre pipeline 25 km distribution system 500th customer Aug Owners Inuvialuit Petroleum Corp. AltaGas Services Enbridge n Involved in production, processing, transmission and distribution of northern natural gas to town of Inuvik. Alaska Inuvik Norman Wells Zama Inuvik Gas

n Integrity Management in permafrost –Geo-pig Northern Pipelines - Operations % Strain vs. Time for Slope Year Strain

Northern Pipelines - Operations n Geo-pig n scheduled pipeline repair

Northern Pipelines - Maintenance n access equipment n pipeline repair techniques

The “Measured Approach” Build two smaller lines “consecutively” in the same right-of-way

The “Measured Approach” BENEFITS –Cost estimates 48-inch vs. 2x36-inch within 7% –Reduced project risks –Socio-economic benefits –Improved schedule for first gas to market –Pipeline capacity better matched to market needs Build two smaller lines “consecutively” in the same right-of-way

Success requires: n Continental decision-making n Robust project economics n A Producer decision to proceed n Common understanding n Cooperation of all stakeholders

Resource Development Council 22nd Annual Conference November 29, 2001 Anchorage, Alaska Pipeliners Adding Value Wayne Sartore Vice President Northern Pipeline Development Enbridge Inc.