GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

LAPD Run 2 Results and Notes Terry Tope
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Cryogenics at CERN (LHC)&Helium Inventory Brief review with emphasis given on cryogen management Americas Workshop on Linear Colliders 2014 Fermilab,
Cryogenic discussion and update 30 October 2014Neutrino platform.
ICEoxford Limited. Development of ICE Beam line equipment Copyright © 2011 ICEoxford Ltd Starting Point A simple Continuous Flow (CF) system.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Current status Arkadiy Klebaner November 21, 2012
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
CRYOGENICS AND POWERING
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
N.Delruelle (CERN)31-May-2007 Cryogenics for ATLAS and CMS Experimets N. Delruelle on behalf of AT-ECR group.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
N.Delruelle, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Design choices.
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Experience from large helium inventory management at CERN ILC Cryogenics and Helium inventory meeting CERN, Wed. 18 th of June 2014 D. Delikaris Technology.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
a magnetic refrigeration stage
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
TS-CV-Detector Cooling 22-Jan-04P. Tropea - JCOV1 Design, construction and installation of a double loop fluorocarbon 150 kW cooling plant for the CMS.
Performance analysis of cryogenic system and cryomodules for the complete superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Installation of the T600 at Fermilab CSN2, September 22,
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
Final Design Cryogenic and mechanical configurations
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Installation of the T600 at Fermilab
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
IT-4189 Supply and installation of a cryogenic distribution system
Proximity Cryogenics P&IDs Meeting
Cryogenic behavior of the cryogenic system
Marco Statera NA62 - GTK working group meeting
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
CRYOGENICS OPERATIONS 2008 Organized by CERN
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
ILC Experimental Hall Cryogenics An Overview
as a prototype for Super c-tau factory
Cryogenic behavior of the magnet
Cryogenics – The Basics
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration

GLA Content Cryogenic system for the ATLAS magnets Cryogenic system for the CMS magnet Cryogenic system for the ATLAS Liquid argon calorimeter

GLA Large Hadron Collider

GLA ATLAS

GLA ATLAS Central Solenoid Cold mass: 5.5 tons Current: 7.7 kA Field:2 T Stored energy 39 MJ

Johan Bremer GLA ATLAS Barrel Toroid Cold mass370 tons Current20.5 kA Field 1 T (peak 4 T) Stored energy1.6 GJ

GLA ATLAS End-Cap Toroid Cold160 tons each Current 20.5 kA Field 1 T (peak 4 T) Stored energy0.25 GJ each

GLA Basic flow scheme of the refrigerating system K20 60K

GLA PCS of ATLAS Toroids Centrifugal pump: 1.2 kg/s / 300 mbar Buffer volume covering slow-dump 0.7

GLA PCS of ATLAS Solenoid

GLA Design & measured heat loads Thermal loads at 4.5 K designmeasured static Barrel toroid660 W510 W Both End-Cap toroid360 W290 W Central solenoid50 W17 W Pump650 W670 W infrastructure450 W215 W Total 2170 W 1702 W dynamic Barrel toroid (2 hr) 350 W 360 W Both End-Cap toroid (2 hr) 220 W 140 W Central solenoid (20 min) 20 W 25 W Total 590 W 525 W Liquefaction load (1.6 x ) g/s = 10.8 g/s (design) (1.85 x ) g/s = 12.3 g/s (measured)

Full system fast dump GLA2011

Consolidation/Conclusion Consolidations foreseen for: Winterstop 2011: installation of two compressor stations in the MR compressor chain; Long shutdown 2013: installation of extra helium storage volume in experimental underground area: Solenoid can (for some time) be driven independently from toroid system; Conclusions: ATLAS magnet system operational since 2008: Fast dumps only triggered by equipment failure (current lead valve, communication with PLC, not by failing pump) Slow dump caused by non-availability of refrigerator system works correctly Recuperation time after fast-dump now about 3 days; GLA2011

CMS GLA2011 TRACKER CALORIMETRE HCAL CALORIMETRE ECAL CHAMBRES à MUONS (End Caps) CHAMBRES A MUONS (Barrel) Solenoid: Inner diameter:6 meter Length:12.5 meter

CMS solenoid GLA2011 Cold mass234 tons Current 18.1 kA Field 3.8 T Stored energy2.7 GJ

CMS basic flow scheme GLA2011 Thermal load going into 4.2 K system800 W Thermal load on thermal screen system (60K - 80 K) 4500 W Liquefaction load 2x2 g/s

CMS basic flow scheme GLA2011

Fast Dump recovery GLA2011 Magnet nominal current: A Magnet maximum Temperature after FD: 69K Recovery time for physics: 95:40 (hh:mn) Cryo Recovery time : 83:11 (hh:mn) (CB ok+ 60% in the Intermediate Cryostat

Consolidation/Conclusion Consolidation The two compressor stations (low and high pressure) will be backed-up by a complete redundant system. Conclusion: Fast dumps only triggered by equipment failure (for example current lead valve); Slow dump caused by non availability of refrigerator system works correctly; Recuperation time after fast-dump about 3.5 days; GLA2011

Argon calorimeters 3 heat exchangers 7 heat exchangers GLA2011

Argon calorimeters Electromagnetic barrel half-wheel Cryostat diameter 4.3 meter length6.5 meter Argon volume40 m 3 Detectorweight120 t Heat load1.9 kW Equipped End-Cap cryostat Cryostat diameter 4.3 meter length3 meter Argon volume19 m 3 Detectorweight219 t Heat load2.5 kW GLA2011

Functional requirements (1) Maximum temperature gradients during cool down (< 6K..45K) No argon gas bubble formation in liquid bath Temperature distribution in argon bath < 0.6K Temperature stability not well defined in TDR Argon purity < 1000 ppb O 2 equivalent (volume)

Functional requirements (2) S afe continuous operation of the ATLAS LAr cryogenic system: Foresee that calorimeters shall not be emptied over their lifetime Foresee an emergency evacuation of the argon (in case emptying is needed) Foresee that End-Cap calorimeters can be displaced longitudinally over 12 meters to give access to the inner part of the ATLAS detector Foresee that no condensing (of water) will find place on the signal feed-throughs GLA2011

End-Cap cool down 88.3 Average cooling rate 0.13 K/h heat extracted during cool-down: 15.7 GJ He contact gas in cold volume to about 100 K Gas/liquid N2 passed through heat exchangers in cold volume Below 120K: LN 2 cooling Cryostat filling Argon condensing PurgesFrom 295K to 120K : GN 2 cooling Do not pass temperature gradients during cool down (< 6..45K) OK GLA2011

Nitrogen circulation Nitrogen is circulated through heat exchanges via a nitrogen pump; The 2-phase nitrogen flow is regulated to the same pressure in all 12 heat exchangers placed in the baths; Nitrogen re-liquefied by refrigerator; System backed up by 100 m 3 N 2 storage at the surface; GLA2011 End-cap LAr Tanks LN 2 tanks LN 2 pump Expansion vessel 1.25 bar Barrel End-Caps LN 2 PSD Refri- gerato r 2x 50 m 3 15 m 3

Normal operation Each of the cryostats equipped with expansion vessel: Liquid level in expansion vessel; Expansion vessel placed above level of cryostat; Expansion vessel distanced from cryostat Argon in expansion vessel is regulated to saturated conditions at 1.25 bar (89.3K). The bath temperature is regulated to 88.3 K, creating a liquid which is sub- cooled between 3 K and 7 K in the sensitive volume GLA2011

Cooling principle Ar triple point T = 83.8 K P = 0.69 bar 89.3 Pmin N 2 = 2.1 bar 2.9 Steady state 87.5 Ar and N 2 saturation curves 3.5 K 7 K Sub-cooled liquid: No boiling (no gas production, no noise) Time to recuperate from cooling failure GLA2011

Calorimeter cooling stop Created a 7 hour stop of the nitrogen flow for one of the End Caps. The temperature in the argon bath was over this time period rising with 800 mK maximum, not creating a risk to form argon bubbles. No argon gas bubble formation OK GLA2011

Result 2010 data taking period Homogeneity in space C-side end-cap A-side end-capBarrel Stability in time Barrel probes : Due to the 50 mK step in august (~5 mK without this 2 weeks) Endcaps probes → Very good stability ! (~3.5 mK) Temperature distribution in argon bath < 0.6K; OK GLA2011 mK

Result 2010 data taking period Stop of refrigerator Start of refrigerator Effect of refrigerator stop on temperature stability of argon baths Effect cold- electronics stop GLA2011

Result purity measurements Results over more than 2 years (Systematic error approx. 100 ppb) Argon purity < 1000 ppb O 2 equivalent (volume) OK GLA2011

Precautions taken against failures of services Pre-cautions taken not having to empty the calorimeters OK GLA2011 If stop of refrigerator, nitrogen supplied via surface. Spare buffer of liter in experimental cavern Electrical power: EDF/EOS/Diesel 1/ Diesel 2/ UPS Compressed air backed-up by nitrogen buffer and by batteries Cooling water supply switched to tap water in case of problems with standard cooling water system One nitrogen pump is running, two are in stand-by. When supplied via surface, system can even run without pumps Warm back-up for each of the PLCs (not really redundant) Very slow rise in evacuation vacuum once diffusion pumps are stopped (more than 6 hours till mbar)

Emergency evacuation of liquid argon Two 50 m3 permanently cooled argon storage tanks have been placed in the experimental cavern Top of tank is situated at a lower level than bottom of calorimeters In case of emergency calorimeters can be emptied by gravity into these tanks Foresee an emergency evacuation of the argon OK GLA2011 First collision in cavern: Emptying system successfully operated

End Cap displacements 12 m displacem ent End-Cap displacement OK GLA2011

Feed-through anti-condense Cryostat warm vessel Cryostat cold vessel Independent vacuum Cold FT flange Warm FT flange Total of 114 signal feed-throughs Feed-through: pass signal cable from liquid argon bath to room temperature Each warm flange independently regulated at 20 ˚C Heat load per feed-through into liquid argon bath ~ 15 W After heating failure about 30 minutes down-to dew point no condensing on the signal feed-throughs OK GLA2011

Conclusions Argon calorimeters: The three ATLAS liquid argon cryostats are operational since beginning 2006 Temperature gradient and stability are well within the foreseen limits Emergency system to empty the cryostats is operational System to displace full End-Cap cryostats is operational Signal feed-through system is functioning well within the foreseen limits General: Cryogenic systems for the experiments function well, data-taking with 3,5 TeV beams and luminosity of > cm -2 s -1 ongoing. GLA2011