1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.

Slides:



Advertisements
Similar presentations
JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
Advertisements

1 Nuclotron-based Ion Collider fAcility I.N.Meshkov for NICA Working Group Scientific Workshop Dedicated to The Centenary of V. I. Veksler's Birth and.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Ion Accelerator Complex for MEIC January 28, 2010.
Application of cooling methods at NICA project G.Trubnikov JINR, Dubna.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
ALPHA Storage Ring Indiana University Xiaoying Pang.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Issues.
COULOMB ’05 Experiments with Cooled Beams at COSY A.Lehrach, H.J.Stein, J. Dietrich, H.Stockhorst, R.Maier, D.Prasuhn, V.Kamerdjiev, COSY, Juelich, I.Meshkov,
The Project NICA/MPD at JINR (Dubna) Search for the Mixed Phase of Strongly Interacting Matter at Nuclotron-based Ion Collider FAcility (1  1.5)·10 27.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
MEIC Electron Cooling Simulation He Zhang 03/18/2014, EIC 14 Newport News, VA.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
1 Machine Advisory Committee Video-Conference JINR, Dubna May 20, 2009 Concept and Status of The NICA Project Nuclotron-based Ion Collider fAcility I.Meshkov.
MEIC Electron Cooler Design Concept. EC potential impact to colliders Reaching a high start luminosity Very short i-bunches achieved by longitudinal cooling.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Polarized deuterons and protons at NICA А.Коваленко NICA-SPIN_PRAGUE 2013 Charles University, Prague, July 7-12, 2013.
Proton Polarimetry at the U-70 Facility Sandibek Nurushev Institute for High Energy Physics, Protvino, Russia International Seminar on High Energy Spin.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
FLAIR meeting, GSI March Positron Ring for Antihydrogen Production A.Sidorin for LEPTA collaboration JINR, Dubna.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
NICA start-up scenario + questions of instabilities A.Sidorin For NiCA team NICA Machine Advisory Committee at JINR (Dubna) October 19-20, 2015.
Machine Advisory Committee for NICA October 2015 MPD SPD Transfer channels Options of HV Electron Cooling System for NICA Collider I.Meshkov for.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
September 13, 2007 J. Alessi EBIS Project and EBIS as an ionizer for polarized He-3 ? Jim Alessi Work of E. Beebe, A. Pikin, A. Zelenski, A. Kponou, …
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
1 NICA Project at JINR Nuclotron-based Ion Collider fAcility I.Meshkov for NICA team September , 2011, Alushta, Ukraine hosted by JINR, Dubna IX.
O.I.Brovko, A.V.Eliseev, I.N.Meshkov, E.M.Syresin (JINR)
NICA injection complex status
Heavy ion physics perspectives, Bad Liebenzell, September 2007
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Status of HESR 18th March Gießen Dieter Prasuhn.
A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017
A. Martynov on behalf of accelerator division.
HIAF Electron Cooling System &
Injector Cyclotron for a Medical FFAG
Status and prospects of VEPP-5 Injection Complex
Linac possibilities for a Super-B
ПОЛНОЕ НАЗВАНИЕ ПРОЕКТА
Status of the VEPP-2000 Collider Project at Novosibirsk
LHC (SSC) Byung Yunn CASA.
Pulsed Ion Linac for EIC
Project "Nuclotron M" / NICA
Advanced Research Electron Accelerator Laboratory
JLEIC 200 GeV Ion Injector Chain and Bunch Formation
MEIC New Baseline: Luminosity Performance and Upgrade Path
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Multi-Ion Injector Linac Design – Progress Summary
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
Plans for future electron cooling needs PS BD/AC
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table Discussion 6-7 October JINR, Dubna

2 NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Contents 1. Introduction: “the basic conditions” 2. Scheme of the NICA 3. Operation Scenario 4. Layout of the accelerator facility 5. The collider ring magnetic system parameters 6. Luminosity 7. Main elements of the Facility 8. Nuclotron: tune shift at injection, electron cooling, upgrade program 9. Estimated Cost, Manpower, Resources 10. Further development 11. Resources & schedule Conclusion

3 NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna 1. Introduction: “The Boundary Conditions” 1. Minimum of R & D 2. Application of existing experience 3. Co-operation with experienced research centers 4. Cost – as low as possible 5. Realization time – 4 – 5 years

4 2. Scheme of The NICA Nuclotron Collider Stripper 238 U MeV/u Detector ECOOL 180 keV 238 U MeV/u 238 U GeV/u Injector for particles of 238 U 30+ at energy 5 MeV/u NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna

5 3. Acceleration from 5 to 500 MeV/u with electron cooling on plateau at 300 MeV/u; NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna 3. Operation Scenario 1.The beam of 238 U 30+ formation in the Injector and injection into Nuclotron. 2.A few injection cycles and RF stacking of ions in the Nuclotron up to the level of ions; cooling time ~ 10 s. 4. Extraction from the Nuclotron and injection into the 1st collider ring, circulation during magnetic field decrease in the Nuclotron. 5. Extraction from the collider ring, stripping on the Stripper Target into 238 U 92+ stage, injection into the Nuclotron. 6. Acceleration up to 2.5 GeV/u. 7. Extraction, injection into the 2d collider ring.

6 3. Operation Scenario (Contnd) 8. Repetition of the steps 1  Extraction, injection into the 1st collider ring. 10. Bunching of both beams and junction. Beginning of detection interaction events. NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna

7 3. Operation Scenario (Contnd) NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Working Cycle of The Facility 1st e-cooling 2d e-cooling 2d injection1st injection acceleration t, sec Circulation in the 2d ring Collision regime E, MeV/u acceleration Collision regime

8 3. Operation Scenario (Contnd) NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Ion Beam Lifetime in Nuclotron At 5 MeV/u in “Helium vacuum”  = (5 ÷ 30)  cm 2  ~ 0.3 ÷ 2 sec at P = Torr

9 4. Layout of the accelerator facility NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna

10 5. The collider ring magnetic system parameters Magnetic rigidity minimum/maximumTm12/48 Circumferencem183 Number of superperiods2 Number of periods in regular sections7 Long straight sections, number x lengthm2x30m Middle straight sections, number x lengthm4x4m NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Number of dipoles / eff. length of dipole24 / 3.0m Number of quadrupoles in regular sections / length of quads 28 / 0.5m Maximum dipole fieldT4  5 Maximum quadrupole gradientT/m+49/-45 Beam crossing angle in IPmrad  15  20

11 Lattice functions in the regular section NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna 5. The collider ring magnetic system parameters (Contnd)

12 6. Luminosity Peak Luminosity - 5  cm -2 s -1 Average Luminosity - 2  cm -2 s -1 NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Main Collider Parameters N 1 = N 2 =1  n b = 20 l interaction  l IP  l bunch = 50 cm  x  y = 0.7  mm  mrad Beam-beam effect   = 0.004

13 NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna 6. Luminosity (Contnd) Luminosity vs Crossing Angle 

14 NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna 6. Luminosity (Contnd) Emittance growth time related to IBS Transverse emittance:   41 sec Long. emittance:   41 sec Luminosity and beam-beam parameter evolution during experiment L(t)  (t)

15 7. Main Elements of the Facility KRION PCC Alvarez 238 U ions/pulse 3.78 keV/u 400 keV/u 5 MeV/u L= 5.5 m, d = 1.2 mL = 25 m, d = 1.6 m Structure of the injector Injector The KRION – key issue of the project NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Parameters: 238 U  10 9 ions/pulse, emittance 1  mm  mrad Pulse duration 8  s at 50 Hz rep. freq. Solenoid of 6 T magn. field SC solenoid of 6 T magn. field is required!

16 7. Main elements of the facility (Contnd) Injector The injector parameters PCCAlvarez Initial energy, keV/u Final energy, keV/u RF frequency Total length, m5.525 Cavity diameter, m NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna

17 7. Main elements of the facility (Contnd) Injector - Polycylindrical Cavity Accelerator (PCC) NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna RF feed- throughs To vacuum pump Gap number123 Length, cm310 Voltage amplitude, MV0.622 The gap efficiency0.811 Capacity, pF RF power, kW Parameters of the PCC Schematics of the PCC accelerator: 1, 2, 3 - /4 cavities, 4 – buncher gap, 5 – current monitors. Experimental results: Protons, 1.5 MeV I beam = 10 mA F = 148 MHz

18 8. Nuclotron: Life Time & Tune Shift at Injection NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna “Lasslett tune shift” at injection For 238 U 30+ at 5 MeV/u and  y /  x = 40/100  mm  mrad, k bunch = 2 The tune shift  Q x /  Q y = 0.2/0.3 Ion Beam Lifetime in Nuclotron At 5 MeV/u in “Helium vacuum”  = (5 ÷ 30)  cm 2  life ~ 0.3 ÷ 2 sec at P = Torr Fast acceleration

19 NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna 8. Nuclotron (Contnd) Electron cooling Electron energy 180 keV Electron beam current 0.5 A Electron beam diameter 1.4 cm Solenoid magnetic field 2.0 kG Cooling section length 2.0 m Electron temperature, T  200 meV T  1.0 Cooling time ~ 10 s

20 NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna 8. Nuclotron: electron cooling (Contnd) Recombination with cooling electrons Effect of ion structure LEAR experience: Phys. Lett. B361 (1995)184 Ion  r [10 -8 cm -3  s -1 ] Pb Pb Pb U Au For the cooler parameters listed above  recomb = 25 s

21 NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna 8. Nuclotron: electron cooling (Contnd) Electron cooler for IMP, Lanzhou – designed, constructed and delivered by Budker INP to IMP, Lanzhou V.Parkhomchuk, the team leader

22 1.Vacuum. 6. Geodesy 5. Power supplies 4. Diagnostics 3. Injection and extraction 2. RF system NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna To routine operation ! Upgrade program 8. Nuclotron (Contnd)

23 Co-operation with Budker INP: 1) magnets – mass production 48 magnets ! Common design and manufacturing at BINP and JINR It will speed up project realization Test at Kurchatov Institute & JINR (lack of LHe!) Schedule: 1 magnet/month = 4 years ! Estimate of theSC magnets production based on the manufacturing rate of the Workshop at Budker INP shows NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna SC dipoles for NICA: 4T (2.5 GeV/u)  7T (5 GeV/u) BINP Experience of SC dipoles for BESSY II  up to 10T Co-operation & Manufacturing 9. Estimated cost, manpower, resources (Contnd) Thus, we will need to organize the parallel process of manufacturing! and

24 Co-operation with Budker INP: 2) injection/extraction systems 3) Alvarez (CERN linac) 4) First harmonics RF for Nuclotron 5) E-cooling system for Nuclotron (high precision solenoid) NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Co-operation & Manufacturing 9. Estimated cost, manpower, resources (Contnd)

Further development: a) Booster b) Energy increase c) Polarized beams NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna c) High energy electron cooling   collaboration with FZ Juelich & GSI

Resources & schedule NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Element, workCost, M$ Ion source0.75 Nuclotron upgrade0.75 Electron cooling system1.3 Linear accelerator5.5 Collider rings20.0 Transfer lines1.7 Civil constructions and assembly of the equipment 1.0 Total31.0 Cost

Resources & schedule (Contnd) NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna PhysicistsEngineers and designers Technicians Manpower Number of staff members necessary for accelerator facility design & construction

Resources & schedule (Contnd) NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Schedule Conceptual design report Nuclotron upgrade Ion source development Technical design Fabrication Assembling Commissioning Start of experiments

Resources & schedule (Contnd) NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna One can manage the project realization in “stage by stage” style!

Funding & schedule (Contnd) KRION development    2.Nuclotron upgrade    NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Very first tasks

31 NICA project has a goal to provide JINR with modern and unique experimental facility. NICA Project, I.Meshkov for The Group I Round Table Discussion October 6-7, 2006 JINR, Dubna Conclusion It will be a significant step in development of the “home” experimental base of JINR and will bring the Institute back into position of the leading research centers of the World in the field of high energy physics! Thank you for your attention !