Small MS4 General Permit Renewal 1 Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
When It Rains, It Drains An Overview of Pennsylvania’s New Storm Water Management Program.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
Introduction to Compliance Assistance Documents Part I.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
MCM #6: Pollution Prevention and Good Housekeeping for Municipal Operations What to expect during an MS4 INSPECTION.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Statewide Basic Requirements for Stormwater. New Development, Redevelopment, and Existing Development Stormwater quality issues related to new development,
STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
MS4/sMS4 Annual Report Development Thea Lomax Presenter Storm Water Enforcement Thea Lomax Presenter Storm Water Enforcement Prepared 07/04/2011.
City of Puyallup Planning Commission Presentation February 8, 2012.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Introduction to MS4 Stormwater Requirements (2009)
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
NPDES Permit Application and Annual Fees NPDES Permits NPDES Permits are issued for the discharge of municipal, industrial, or commercial (non- storm.
An Overview of our Community’s Stormwater Management Program
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
0 Montana Department of Environmental Quality Permitting and Compliance Division Water Protection Bureau Water Quality Discharge Permits Section Storm.
Steve Braun Began in 1990 Permit needed if: Medium to Large Communities serving a population of >100,000 Industry falls within one.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
TPDES Permitting Municipal Separate Storm Sewer Systems (MS4s) Updates Water Quality Seminar September 23-24, 2015 Hanne Lehman Nielsen and Rebecca Villalba.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
CLEAN WATER ACT AND MUNICIPAL STORMWATER CALIFORNIA STORMWATER WORKSHOP David W. Smith, Manager NPDES Permits Section EPA/Region 9.
North Hennepin Community College MS4 Plan October 24, 2014.
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
ODOT District MS4 Liaison Training: Why are we here?
MS4 On-site evaluations & common findings
STORMWATER MANAGEMENT
Summit County MS4.
Stormwater Management Program
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Illicit Discharge Detection & Elimination (IDDE) Plan
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Small MS4 General Permit Renewal 1 Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office

Small MS4 General Permit Renewal 2 TimelineTimeline December 24, 2007 December 26, 2007 February 14, 2008 February 21, 2008 January 30, 2009 Public Noticed GP Renewa l Public Hearing 1 st Generatio n GP Expired Public Comment Period Ended GP Renewa l Issued

Small MS4 General Permit Renewal 3 MS4 Locations

Small MS4 General Permit Renewal MS4s

Small MS4 General Permit Renewal 5 Renewing Coverage NOI $200 Updating SWMP

Small MS4 General Permit Renewal 6 Renewing Coverage Co-Permittee Form No Additional Fee

Small MS4 General Permit Renewal 7 6 Minimum Control Measures Illicit Discharge Detection/Elimination Public Education & Outreach Pollution Prevention/Good Housekeeping for Municipal Operations Public Involvement/ Participation Construction Site Runoff Control Post-Construction Runoff Control

Small MS4 General Permit Renewal 8 Table of Organization

Small MS4 General Permit Renewal 9 Public Education & Outreach > 1 mechanism & target ≥ 5 storm water themes or messages  1 theme targeted to development community  ≥ 50% of population ≥ 5 public involvement activities Public Involvement/ Participation Timeframe - Over Permit Term

Small MS4 General Permit Renewal 10 IDDEIDDE Expanded Mapping Reqts  Catch basins  Pipes & ditches  Flood control facilities  WQ BMPs  Private WQ BMPs Timeframe  Permit term, or  Provide alternative schedule with 2009 annual report

Small MS4 General Permit Renewal 11 IDDEIDDE HSTSs Discharging to MS4  Work with local waste water authorities, planning agencies, BOHs, etc. – planning, future sewers  Implement proactive O&M program to determine if operating as designed & intended  Identify HSTSs that can legally, feasibly and economically be connected to sewers

Small MS4 General Permit Renewal 12 IDDEIDDE Dry-weather screening Schedules to eliminate illicit discharges Annually update MS4 map if needed What is an illicit discharge? “…any discharge to an MS4 that is not composed entirely of storm water, except for fire-fighting activities and NPDES permitted discharges.”

Small MS4 General Permit Renewal 13 Construction/Post- Construction Ordinance  Equivalent with NPDES CGP Construction Projects ≥ 1 acre  Review SWP3  Inspections Initial & monthly thereafter unless priorities developed Post-Const WQ BMPs  Ensure long-term O&M plans developed & agreements in place Timeframe – 2 years

Small MS4 General Permit Renewal 14 Pollution Prevention/ Good Housekeepin g Industrial SWP3s  Within 2 years Annual Employee Training

Small MS4 General Permit Renewal 15 Annual Reports m 2008 Report 2009 – 2013 Reports

Small MS4 General Permit Renewal 16 ANY QUESTIONS?