CI 11 th December 2008 CI Structure. CI 11 th December 2008 RF at the CI Lancaster University Engineering Department Professor Richard Carter (Academic)

Slides:



Advertisements
Similar presentations
Due Diligence of Technology Mission Critical: The Rocky Research scientist, engineers & mfg specialist are dedicated to assist potential investors in.
Advertisements

Cockcroft Institute P. Goudket Cockcroft All Hands Meeting - March 2007 ILC Crab Cavity Collaboration Amplitude and Phase Control Development Cockcroft.
Getting a university job David S Moss Professor of Biomolecular Structure School of Crystallography Birkbeck College Generic Skills Workshop 23 March 2005.
RF Technology Professor Richard Carter
Peter McIntosh STFC and Cockcroft Institute CI SAC Review 1 – 2 November 2010 SRF and RF Activities.
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Cockcroft Institute LC-ABD plenary April 2007 ILC Crab Cavity Collaboration Cockcroft Institute : –Richard Carter (Lancaster University) –Amos Dexter (Lancaster.
Initiating the Crab System R&D Graeme Burt Lancaster University Philippe Goudket Daresbury Laboratory.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Particle Physics, Nuclear Physics and Particle Astrophysics meeting October 2010 John Womersley Director, Science Programmes, STFC.
Advanced Energy Systems, Inc. FY 09 AES Phase I Crab Cavity SBIRs Michael Cole, Doug Holmes.
Analysis and Control of Beam Dynamics in EMMA Kai Hock and Andy Wolski STFC PPRP Meeting, Glasgow, 24 June 2009.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
1.0 MW / 175 MHz Source for IFMIF: a study of alternatives
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
A magnetron solution for proton drivers
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
14 March 2007O. Napoly, at ESGARD1 Preparation of FP7 Integration Activity Bid (2008) Superconducting RF Acceleration Systems (SRF-AS) Preparatory Group.
Peter McIntosh (STFC Daresbury Laboratory) Jim Clarke (STFC Daresbury Laboratory) Camille Ginsburg (FNAL) 2 nd PASI Workshop, RAL April 3 - 5, 2013.
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
13 th April 2007FFAG 07 Carl Beard EMMA RF System Carl Beard, Emma Wooldridge, Peter McIntosh, Peter Corlett, Andy Moss, James Rogers, Joe Orrett ASTeC,
The status of RF components on Maria Filippova, RF components: Loads Phase shifters Attenuators Hybrids Splitters Directional couplers.
Compact Radio Frequency Technology for Applications in Cargo and Global Security Graeme Burt Lancaster University, Cockcroft Institute, Security Lancaster.
HL-LHC-UK G. Burt, Lancaster University 1. HiLumi-LHC UK HiLumi-LHC UK Superconductivity and Cryogenics Machine-detector interface Beam dynamics Crab.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
HISTORY With the establishment of Karabük University at 2007, Graduate School of Natural and Applied Sciences has started its education life with 8 graduate.
WP10.3 Crab Cavities Overview EUCARD SRF Annual Review Peter McIntosh (STFC, ASTeC, Daresbury Laboratory) 4 – 5 May 2011, Orsay.
RF Summary SLHIPP – 1 o. brunner BE-RF. RF sources and beam dynamics: o Magnetrons (Amos Dexter Lancaster Univ. ) o LLRF for the SPL SC cavities (Wolfgang.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Ingot Niobium Workshop RF Sources Andrew Kimber 4 th December 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson Science Associates,
SPL waveguide distribution system Components, configurations, potential problems D. Valuch, E. Ciapala, O. Brunner CERN AB/RF SPL collaboration meeting.
EMMA, BASROC, Hadron Therapy and ADSRs Roger Barlow STFC Cockcroft Review Feb 11 th 2009.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
HPRF Faraday Partnership Industrial Activities in support of Accelerator Science David Wilcox Doug Clunie HPRF Faraday Partnership 26 September 2006.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
21 st to 25th September 2009 EMMA RF Systems At Daresbury Laboratory C Beard OVERVIEW OF THE EMMA RF SYSTEM Carl Beard ASTeC, STFC Daresbury Laboratory.
CarterFest 14 th July 2010 Stabilised Magnetrons Presentation to mark Professor Richard Carter’s contributions to Vacuum Electronics Delivered by Amos.
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
Integration Open Questions (some urgent questions only … ) ◊Position of the couplers ? ◊Will there be a separate cryoline? ◊Architecture of the RF power:
STFC Challenge Led Applied Systems Programme (CLASP) Energy and Environment Funding Stephen Loader External Innovations – STFC 5 July 2016.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
CERN – Zanon discussions
T5.2: Harmonization - Material and Component Reference
Nuclear Physics Group: changes since July 2011
UK Feedback Feedback from Prof John Womersley, Chief Executive of Science and Technology Facilities Council (STFC), UK at the Cockcroft Institute Board.
A frequency choice for the SPL machine: Impact on hardware
Second SPL Collaboration Meeting, Vancouver May 2009
BPM development at ATF/CLIC
Developments on Proposed
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
ESS RF Development at Uppsala University
Task 2: High-gradient normal-conducting technology development
STFC Contributions to the FCC Study
UK RFD Pre-Series cryomodule
Beam Dump outline work plan (UK perspective)
CEPC RF Power Sources System
Spring 2019, ECE : RF Power Engineering Partially supported by Department of Energy and Facility for Rare Isotope Beams Instructors: Prof. A. Nassiri,
Presentation transcript:

CI 11 th December 2008 CI Structure

CI 11 th December 2008 RF at the CI Lancaster University Engineering Department Professor Richard Carter (Academic) Amos Dexter (Academic) Graeme Burt (Academic) Imran Tahir (Research Associate Electronics) Praveen Ambattu (Research Associate RF Engineering) Jonny Smith (Research Associate RF Engineering) + 3 PhD students ASTeC (RF Group) Peter McIntosh (RF Group Leader) Carl Beard (Senior RF Scientist) Andy Moss (Senior RF Engineer) Shrikant Pattalwar (Senior Cryogenic Engineer) Rob Smith (Senior Diagnostic Engineer) + 10 other technical staff Manchester University Physics Department Roger Jones (Academic) + 2 RAs and 2 PhD students

CI 11 th December 2008 Lancaster RF Group Expertise Modelling of microwave tubes (klystrons, magnetrons, TWTs, IOTs) Dipole deflection and crab cavity design Primary Secondary Design of passive RF components, cavities and couplers Multipactor LLRF RF measurements Heat Transfer and Stress Analysis Mathematical modelling and code development Additional Facilities in Engineering Department Light manufacture Mechanical design and drawings

CI 11 th December 2008 UK Industry and Funding Core Grant for CI Project Grants LC-ABD (Cut) HIE-ISOLDE (submitted) FFGA – EMMA (Manchester and ASTeC) NLS – ALICE (ASTeC) PIPPS Industry Programme Support Scheme Could potentially provide funding for prototyping with UK industry UK passive component manufactures Credowan and Q-par Angus have expressed interest in becoming involved. Science and Technology Large Facilities Council (STFC)

CI 11 th December 2008 My initial WG1 SPL Questions 1. How many cavities per klystron 4, 8 or 16 ? (or do we need a design for each so we can decide later) 2. Is there potential for the compact FLASH layout shunt tee splitters to be variable? 3.Variable splitting with Riblet couplers and magic tees has been proposed, is this a route to pursue? (B. Bogdanovich et al, EPAC 2002) 4. Has a high power phase shifter already been developed? ( Fast Ferrite Phase Shifters for High Power Applications, Y. Kang, Argonne SNS)

CI 11 th December 2008 Lancaster Variable Coupler Model Uses ceramic rods for power handling and two so tubes are well beyond cut-off

CI 11 th December 2008 What might Lancaster Contribute ? Design of variable splitters Modelling of complete distribution system Review klystron design Specify protection requirements Assist testing of components Overall layout and project management Identify component suppliers and validate solutions Mechanical drawings With current resources With additional resources