Bonding of Flex Cable to Stave 11/10/2010 Thomas Johnson.

Slides:



Advertisements
Similar presentations
Offshore Safety Cockpit of Tomorrow Offshore Safety Cockpit of Tomorrow Design Concept by: Sonny Hawkins and Tom Stanley Presentation by Tiger Performance.
Advertisements

2313 W Sam Houston Parkway N Suite 105 Houston, Texas ROK Shield Application Instructions ROK Shield is a non-toxic,
How to Build a Hovercraft October Patrick Wenzell How to Build a Hovercraft A Cobb County Technology-Based Integration School Special Thanks to.
How to build a bridge!.
Slab constructed cup Flatten a lump of clay into a long shape as you will be rolling out a slab long enough to wrap around a tube form. Note: finished.
Cutting With a Jeweler’s Saw
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
SEACORK INSTALLATION ON A CATAMARAN The first step is to make templates of all corner pieces to be cut from sheet material, which will be used for border.
Cut off the top off an aluminum can. Exploration Warning: Be very careful not to cut yourself on the sharp edges of the can.
Firestone Building Products EPDM Training. Membrane Attachment.
1 Ladder assembly steps HFT PIXEL updated for ultimate chip ladders 2/12/2012 ladder fixture u.SLDASM.
Mr. Thomas Thermoforming Processes CCHS Plastics Technology.
Making Coverslips by Steve Smith, Cheng-Zhong Zhang and Amy Xu.
Preparing & Exposing Photographic Silkscreens For use with Lesson 3 FOR EDUCATION USE ONLY ©2009 The Andy Warhol Museum, a museum of Carnegie Institute.
Internal Envelope Vac Bagging Findhan Strain. Split Tooling 5083 Aluminium (cost) CNC’ed Finished with 800 grit Not well polished as good surface finish.
RS6 Hood Vent Templates and fab Instructions. You will need- Painters tape. 1” and 2”+ Aircraft paint stripper Tape measure mm T square Good pencil Drill.
Foil Reliefs Ms. Crump - ART. Materials Cardboard Yarn Glue Aluminum foil Sharpie markers.
Create a design for your kite pertaining or related to safety in everyday life.
Vacuum chuck for probe station contacts: Howard Wieman work: cell: Eric Anderssen
Composite Rockets. Rocket Design The rocket should be designed and tested in a rocket simulation software. Rocket should then be modeled in Autodesk Inventor.
Ladder assembly steps HFT PIXEL 1/04/2009 ladder fixture.SLDASM.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Weld Study Continued Filet weld on both sides Deflection (top flange removed) Stress Intensity (top flange removed)
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
Stycast Insertion Part 3 and preliminary glue picture on samples
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Connector match the key words with their meanings Silicosis Slurry Manipulate ‘Pinch or thumb’ pot To mould or shape something Name given because you use.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
Making a Model Of Sea Floor Spreading You will be able to Identify and Comprehend the features of a moving Sea Floor.
Silk Screening.
PS Module Gluing Tests USCMS Outer Tracker Workshop Ulrich Heintz, Meenakshi Narain, Bill Patterson, Sinan Sagir, Adam Lanman, Eric Spencer, Juan Trenado,
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Building A Co-Cure Cable Thomas Johnson
Using commercial patterns Trimming, pinning, cutting out, transferring pattern markings. © PDST Home Economics.
Type text here Text boxes for the circle book. Type text in the boxes, print, cut and glue in the book or print blank boxes for students.
SHEET METAL process.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Sam Krueger.  Entertainment Center  Preliminary design  Initial  36 plies, glass epoxy  [0 11 /±45 1 /90 5 ] s  No core  Modified design  36 plies,
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
Organic vs Geometric Sculpture Objective: You will list and define geometric and organic shapes in order to apply them to a slab sculpture. DRILL: 1.List/
Bridge Design part 5 By Alan Pennington Note: have straws, tape and testing equipment ready.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
21 Precision Sheet Metal Parts. 21 Precision Sheet Metal Parts.
Central Institute of Plastics Engineering & Technology, INDIA
 Segmented Bowl Senior Woodwork. Overview  Materials and machines  4 step procedure: layout, cutting, laminating, turning.  Final product.
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Ch. 6 Geometry Lab 6-9b Tessellations Lab 6-9b Tessellations.
Press the 3-4 inch piece of fabric in half lengthwise. After pressing the small trim in half lay it on top of the medium cuff piece with raw edges together.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Processing & Converting of Plastic Polymers
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Industrial Engineering Dep.
Forming By Kyle Durham. Manufacturing forming An important production process is forming. An important production process is forming. Forming allows to.
Gluing procedure for BGO, fast and slow scintillator Mózsi Bank Kiss & Tomi Ylinen Nov. 23, 2005.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Physics Activities for Upper Elementary & Middle School Classrooms
How to make the basic car
Board Replacement Laminate-Angle/Angle & Lock & Fold
From: Individually Controllable Magnetic Cilia: Mixing Application
Day 1.
Date of download: 12/21/2017 Copyright © ASME. All rights reserved.
Board Replacements for Nail-Down hardwood
Board Replacement for Engineered Glue-Down Hardwood Floors
GLAST Large Area Telescope:
Pixel module assembly tooling
Rolling Cups Part 2.
Presentation transcript:

Bonding of Flex Cable to Stave 11/10/2010 Thomas Johnson

Mic6 Aluminum Bonding Fixture. Pins for cable alignment.

Mask ALL parts of the cable you do not want epoxy on. Including the backside, edges, targets, etc……..

Cable and Stave in Fixture. Aluminum supports along all edges to prevent squish of stave under vacuum. Top Vacuum plate with target cutouts. Locating pins and target cutout.

Bonding plate with all outside support pieces. Extra plate on the end to support the tubes.

Screen epoxy onto stave. Straight edge is set on blocks providing desired thickness.

Flex cable on vacuum fixture. Screening epoxy using straight edge and 2mil blue tape as a thickness gage. Tape is placed just on the edge of the cable and the straight edge rides on this.

Lay cable onto stave with a rolling motion to help prevent trapped air under cable.

Place sheet of release plastic over cable. Build a vacuum bag over the entire part and compress.

Use soft plastic to squeegee the excess epoxy out. From the middle of cable work the epoxy to the edge where the vac will draw it away. Do this until you see no more excess epoxy/no bubbles. Careful not to puncture your vacuum bag.

Place aluminum Mic6 plate on TOP of vacuum bag with additional weight during cure. Additional support for tubes out of vacuum bag.