Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.

Slides:



Advertisements
Similar presentations
1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Advertisements

Hydrogen R&D system HAZOP
Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
MICE hydrogen review Commissioning, testing and operations.
1 Cooling the Hydrogen (Helium) Absorbers with Small Coolers Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Video.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
Provisional Hydrogen System Control Sequence TW Bradshaw Y Ivanyushenkov D Baynham MJD Courthold.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
1 Hydrogen Safety System Summary MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
MICE collaboration meeting RAL 28 October 2004 Absorber R & D Plan by Wing Lau – Oxford University.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Matthew Hills Hydrogen System – Piping and Instrumentation Diagram.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Hydrogen system status Yury Ivanyushenkov for Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Hydrogen System MICE Collaboration Meeting, CERN, 29 March-2 April 2004 Elwyn Baynham, Tom Bradshaw, Yury Ivanyushenkov Applied Science Division,
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Mechanical Safety Systems and DSEAR Compliance
MICE hydrogen review System modifications. Relief circuit repair During leak testing of R&D tests, the insulating vacuum would not go lower than
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
Patrick Thornton, SNS/FPE June 9, 2008
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
The MICE Hydrogen System Summary Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton Laboratory.
MICE CM30 7 th July 2011 Liquid Hydrogen Delivery System M Hills (STFC, RAL) T Bradshaw (STFC, RAL) M Courthold (STFC, RAL) S Ishimoto (KEK) A Muir (STFC,
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
The MICE Hydrogen System Safety Review Introduction Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford.
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Collaboration Meeting RAL October 2004.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
OLAV III Experience with the LHC Insulation Vacuum System S. Blanchard, P. Cruikshank, B. Jenninger, N. Kos, W. Maan, L. Mourier, N. Provot, J. Wallner.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
CM28 - Vacuum System Update Matt Hills Mike Courthold 1.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
1 Liquid Hydrogen update CM33 S Watson P Warburton M Courthold.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
1 MICE Hydrogen system Working group mtg – 01/09/14.
The PSI protium gas filling system (status report by Claude Petitjean to the Gatchina collaboration meeting June 14-17) Main components of the PSI gas.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Hydrogen System Update
Liquid Hydrogen Infrastructure Update
Absorber progress MICE-ISIS review of the liquid hydrogen system will be held in early January; guidance from Nominated Engineers on the imported absorber.
MICE Hall Summer Workplan
Proximity Cryogenics P&IDs meeting
MICE Safety Review Meeting 4th Oct 2011 PJ Warburton - Daresbury Lab
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Status of Hydrogen System Development
Vacuum System Design for the Target Monolith System
Presentation transcript:

Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham

Introduction Control System Overview of control system Prototype flow diagrams & control sequences Pumps and Instrumentation Implementation and hardware

Overview of control system The control system will be based on Labview for the R&D tests. Once the algorithms have been developed they will be incorporated into EPICS (Experimental Physics and Industrial Control System), which is the control system that has been chosen for the MICE experiment. Fortunately Labview possesses “Channel Access” capability, used by all EPICS clients, which will ease the subsequent transition to EPICS. The control system naturally divides into two components: –Hydrogen Absorber Cryostat system –Hydrogen Delivery system

Overview of control system Hydrogen Absorber Cryostat system –The cryostat vacuum will be maintained by means of a turbo-molecular pump and backing-line pump. –Both pumps will be fitted with purging lines, through which Helium gas will be introduced if a partial vacuum failure occurs, or Hydrogen is detected in the pump exhaust line, to dilute any Hydrogen that may have leaked into the pumping system. Hydrogen Delivery system –Normal control of the Hydrogen Delivery system can be sub-divided as follows: Purging the delivery system with Helium; Filling the Hydrogen Absorber with liquid Hydrogen from the Hydride Bed; Controlling the liguid Hydrogen level in the Absorber; Emptying the Hydrogen Absorber and returning the Hydrogen back to the Hydride Bed. –Additionally it will be necessary to charge the Hydride Bed with Hydrogen at the outset, and following any maintenance on the Hydride Bed.

Overview of control system Safety aspects –Throughout operations Hydrogen detectors in the extractor hood, venting line, and exhaust line from the pumps will be monitored. In the event of any Hydrogen being detected, operation of the Hydrogen Delivery system will be terminated, and an attempt will be made to return the Hydrogen to the Hydride Bed. –If the pressure in the system exceeds the design pressure, relief valves and bursting disks will protect the system. In addition, a flow of Helium gas will be maintained through the venting line, thus ensuring that any Hydrogen that gets vented by the relief valves, bursting disks, or the various venting valves will be diluted before being expelled via the extractor hood.

Flow diagrams & control sequences Prototype flow diagrams & control sequences

Helium Purge Sequence VP1 On Close PV1,14,17,18,1 9 Open PV2,3,5,7 Open CV4 100% Close PV19 Open PV18 Open CV4 5% to control flow VG5<1mbar H2 System Purged Purge Sequence No Open PV19 Yes 1bar<PG1<1.3bar AND 1bar<PG2<1.3bar Close PV19 Open PV18 Open CV4 5% to control flow VG5<1mbar No Close PV18, Open PV19, Open CV4 100% Yes 1bar<PG1<1.3bar AND 1bar<PG2<1.3bar Close PV19 Open PV18 Open CV4 5% to control flow VG5<1mbar No Close PV18, Open PV19, Open CV4 100% Yes 1bar<PG1<1.1bar AND 1bar<PG2<1.1bar Yes No Close PV18

Control logic – Fill Sequence Chiller on Set TS1_sp = TS1_initial PV2,3,5,7,14,17,18,19 closed CV4 closed PV1 open VP2 on, PV20 open Cooling System on Set TS2_sp = 15K Start Pressure Control Loop Start Vac Monitor Open PV2,3 Open CV4 TS1<TS1_sp And VG3<1mbar PG1  PG1_sp Close PV2&3 and CV4 Stop Pressure Control Loop Set TS1_sp = TS1_low Open PV5 LS1 > LS1_sp H2 System Ready Increment/Decrement TS1 Empty Sequence VG3<1mbar Vac monitor Pressure Control Yes No Yes NoYes No Fill Sequence

Empty Sequence Open PV7 Close PV2,3,4 Set TS1_sp = TS1_low Set TS2_sp = 20K (to achieve PG2 ~1bar) Set cryocooler to 30K Start Absorber Heater Control Loop (adjust to obtain sensible flow rate) LS1<LS1_low Empty Sequence Yes No Close PV1 PG2<0.1bar AND TS3>100K H2 System Empty Yes No 1bar<PG2<1.3bar Increment/Decrement TS3 Absorber Heater Control Yes No Stop cryocooler Stop Absorber Heater Control Loop TS3>30K Yes No

Pumps and Instrumentation General pump considerations There will be two sets of pumps for the MICE RandD system, one for maintaining the Hydrogen Absorber Cryostat vacuum, and the other for use when purging the Hydrogen Delivery system. Both sets of pumps will be located outside the building, but protected from the weather. The chosen location is close to the ISIS Control Room. However, pumping noise is expected to be no more than ~57db. In addition, the connection to the Absorber Cryostat is expected to be 100mm diameter, with approx’ 15m of pipework between the cryostat and the turbo-molecular pump outside the building. Pirani gauges must not be used in the presence of Hydrogen, so a combination of Penning and capacitance gauges will be utilised. There are no Hydrogen detectors available for use in vacuum systems, so it will be necessary to locate all Hydrogen detectors in the pump exhausts, venting/purging lines, and system hood. Note that the final system will comprise three sets of Hydrogen Absorber Cryostats, each with a turbo-molecular pumping system, but only one pump will be required for the three Hydrogen Delivery systems.

Pumps and Instrumentation Pumping System for the Hydrogen Absorber Cryostat Given the pump location and pipework, a Turbovac 151C turbo-molecular pump, rated at 150 l/sec, has been selected for the Absorber Cryostat, which should achieve a pumping speed of ~8 l/sec, thus taking several hours to pump down the cryostat to 1x10-5 bar. This is regarded as acceptable. Note: The pumping speed will be determined mostly by the pipework, with larger pumps having negligible effect on the pumping speed. A Trivac BCS backing pump, rated at ~16 m3/hr, has also been selected, to ensure a backing-line pressure of < 1x10-1 bar can be maintained. With the potential presence of Hydrogen, the backing pump will need to be purged. Synthetic oil will also be used in the backing pump instead of mineral oil for increased safety. A combination of Penning and capacitance gauges will be required for this pumping system.

Pumps and Instrumentation Pumping System for the Hydrogen Absorber Cryostat (cntd) To avoid the need for an expensive explosion-proof pumping system for the Absorber Cryostat, the turbo-molecular pump and its protection systems will operate as follows: –During normal operation the pumps will be operated with their purging lines closed. –If a minor Hydrogen leak is detected and/or the pressure in either pump exceeds 5x10-3 mbar, both the turbo-molecular and backing pumps will continue operating, but with Helium gas introduced via their purging lines to dilute any Hydrogen present. –If the pressure in the cryostat pumping line rises above 5x10-2 mbar, which could be the result of a major Hydrogen leak, the gate-valve to the pumping system will close, thus avoiding any risk of explosion. –Further rises in pressure in the cryostat pumping line will then be handled by the associated relief valve and bursting disk. Notes: The Trivac BCS backing pump can be run at atmospheric pressure if necessary (with the turbo-pump off). By default the backing pump does not have any fault indications. However, the turbo- pump has both fault indications and associated relays. The turbo-pump can be water or air-cooled, but water-cooling is more convenient. Pirani gauges must not be used where Hydrogen might be present.

Pumps and Instrumentation Pumping System for the Hydrogen Delivery system A pumping system is only required for the Hydrogen Delivery system during the purging sequences, and only needs to be able to achieve a vacuum of 1 mbar. The following pumping system is thus envisaged for the Hydrogen Delivery system: –Trivac D40B rotary pump. –A capacitance gauge will be sufficient for this pumping system.

Implementation and hardware