1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-

Slides:



Advertisements
Similar presentations
Peter Chung (ID: pwc140030) Class: EMS in Software Engineering Course: Advanced Requirements Engineering (CS/SE 6361), Fall 2014.
Advertisements

CHALLENGES IN DEVELOPMENT OF INDIAN POWER SYSTEM Mr. V. Ramakrishna Member (Power System), CEA.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Overview of ER & Availability Based Tariff P.Mukhopadhyay.
Generation Peak Demand : 132 GW Growth Rate: 9 – 10 % (per annum) India - Present Power Scenario Total Installed Capacity – GW (As on )
NORTHERN REGIONAL GRID SYSTEM CONTINGECY AND RESTORATION.
Medium Term Outlook for Indian Agriculture:
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Transmission System in India
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
© ABB Group Slide 1 PowDoc id The Royal Swedish Academy of Engineering Sciences, IVA (avd II) Indian Power System – Recent Disturbance Abhay Kumar, HVDC,
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Electricity Generating Authority of Thailand (EGAT) 1 STRUCTURE, STATUS AND CROSS BORDER POWER INTERCONNECTION 0F THAILAND b y Mr. Prutichai Chonglertvanichkul.
Energy Storage Need & Relevance under Climate Change mitigation efforts for India 1 1 Rajsekhar Budhavarapu (Head – Wind Business & CTO- Renewable Investments)
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
OVERVIEW OF INDIAN POWER SECTOR AND PLAN FOR 12 th / 13 th PLAN.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
W E L C O M E Power Grid Corporation of India Limited.
Sanjay Garg General Manager PGCIL/ Ministry of Power
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
Weather & Climate  WEATHER: The daily state of atmosphere. It describes the temperature, wind speed & direction, and the amount of precipitation in a.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
THE INDIAN POWER SYSTEM PECULIARITIES, PROBLEMS AND SOLUTIONS.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 34,207.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
AVAILABILTY BASED TARIFF. AVAILABILITY BASED TARIFF A RATIONAL TARIFF STRUCTURE A RATIONAL TARIFF STRUCTURE SCIENTIFIC SETTLEMENT SYSTEM …..COMPLEMENTS.
Overall National Grid Development: Constraints & Options
SOUTHERN REGION EXPERIENCE
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
1 PRESENTATION ON FREQUENCY CONTROL AND FREE GOVERNOR OPERATION TO THE OFFICERS OF CENTRAL ELECTRICITY AUTHORITY On 4 th April, 2005 by V.K. Agrawal SRLDC,
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
1 ABT WORK SOUTHERN REGION EXPERIENCE. 2 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy.
Where India Stands - Energy Demand (mtoe) India is the Fourth Largest Energy Consumer Source:BP Stat 2010 Low per capita energy consumption (toe)
STATE-WISE INSTALLED ELECTRICITY GENERATION CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) StatesHydroSteamDieselGasWindTotal AP
ENERGY CONSERVATION IN SR - A CASE STUDY
REGIONAL GRIDS IN INDIA – QUICK FACTS
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
A PRESENTATION BY HPSEB LTD.
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
Vidhya/SNSACD/Grade4/Social
THE COASTAL PLAINS.
Presentation transcript:

1 AUDITORS

2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :- 17,697 MW SOUTHERN :- 31,876 MW WESTERN :- 32,354 MW NORTH-EASTERN :- 2,357 MW TOTAL 115,514 MW

3 SOUTHERN REGION WESTERNRE GION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION ‘ ELECTRICAL’ REGIONS SAME FREQUENCY FROM GUJARAT TO ARUNACHAL PRADESH WITH EFFECT FROM MARCH 2003 ABOUT 2800 KMS! APART

4 SOUTHERN REGION WESTERNRE GION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION ‘ELECTRICAL’ REGIONS 1 2 WITH THE COMMISSIONING OF THE TALA PROJECT CONNECTING THE EASTERN AND NORTHERN GRIDS, INDIA WILL HAVE ONLY TWO GRIDS

5 POPULATION : CRORES ( 22% OF INDIA) AREA :- 651 (‘000 SQ KM)(19% OF INDIA) INSTALLED CAPACITY:- 31,876 MW(27.6%) WEATHER :- South-west monsoon North-east monsoon SEA COAST :- AROUND 4000 KM SOUTHERN REGION – GEOGRAPHY

6 ANDHRA PRADESH POPULATION :- 7.6 CRORES AREA :- 275 (‘000 SQ KM) NO OF CONSUMERS :- 162 LAKHS PER CAPITA CONS. :- 560 UNITS MAIN AGRICULTURE CROP :- RICE CLIMATIC CONDITION :- HOT AND HOT & HUMID SR STATES – GEOGRAPHY KARNATAKA POPULATION :- 5.3 CRORES AREA :- 192 (‘000 SQ KM) NO OF CONSUMERS :- 105 LAKHS PER CAPITA CONS. :- 389 UNITS MAIN AGRICULTURE CROP :- COFFEE & RAGI CLIMATIC CONDITION :- HOT AND HOT & HUMID KERALA POPULATION :- 3.2 CRORES AREA :- 39 (‘000 SQ KM) NO OF CONSUMERS :- 61 LAKHS PER CAPITA CONS. :- 300 UNITS MAIN AGRICULTURE CROP :- COCONUT & SPICES CLIMATIC CONDITION :- HUMID TAMIL NADU POPULATION :- 6.2 CRORES AREA :- 130 (‘000 SQ KM) NO OF CONSUMERS :- 152 LAKHS PER CAPITA CONS. :- 586 UNITS MAIN AGRICULTURE CROP :- SUGAR CANE & OIL SEEDS CLIMATIC CONDITION :- HOT AND HOT & HUMID

7 SR STATES – POWER SYSTEM STATISTICS ANDHRA PRADESH INSTALLED CAPACITY – 9531 MW MAX DEMAND MET – 7441 MW DAILY CONSUMPTION MAX – 166 MU DAILY CONSUMPTION AVG – 130 MU CONSUMER PROFILE – INDS -29%, DOM-22%, COMM- 5%, IRRI-34% & OTHERS-10% KARNATAKA INSTALLED CAPACITY – 5802 MW MAX DEMAND MET – 5445 MW DAILY CONSUMPTION MAX – 107 MU DAILY CONSUMPTION AVG – 84 MU CONSUMER PROFILE – INDS -26%, DOM-37%, COMM- 3%, IRRI-33% & OTHERS-1% KERALA INSTALLED CAPACITY – 2617 MW MAX DEMAND MET – 2426 MW DAILY CONSUMPTION MAX – 39 MU DAILY CONSUMPTION AVG – 34 MU CONSUMER PROFILE – INDS -2%, DOM-76%, COMM- 16%, IRRI-6% TAMIL NADU INSTALLED CAPACITY – 7074 MW MAX DEMAND MET – 7228 MW DAILY CONSUMPTION MAX – 147 MU DAILY CONSUMPTION AVG – 126 MU CONSUMER PROFILE – INDS -33%, DOM-21%, COMM- 9%, IRRI-27% & OTHERS-10%

8 GROWTH OF INSTALLED CAPACITY OF SR IN MW

9 INSTALLED CAPACITY IN SR STATESHYDROTHERMALNUCLEARDIESEL/GASWINDOTHERSTOTAL IN % AP % KAR % KER % TN % C.S % IPP % TOTAL IN %34%50%3%12%1%

10 SOURCE-WISE INSTALLED CAPACITY OF SR IN MW 31,876 MW HYDRO THERMAL WIND NUCLEAR OTHERS GAS TAMILNADU HAS ABOUT 800 MW OF WINDMILL POWER WHICH IS NOT INCLUDED IN THE INSTALLED CAPACITY. LIKEWISE MICRO AND CAPTIVE CAPACITIES ARE NOT INCLUDED

11 AGENCY-WISE INSTALLED CAPACITY OF SR IN MW 31,876 MW ANDHRA PRADESH KARNATAKA TAMIL NADU CENTRAL SECTOR IPP KERALA

12 TYPICAL LOAD CURVE OF SR WINTER MONSOON SUMMER EVENING PEAK WEATHER RESERVOIRCONSUMPTION SCROLL DEMAND

13 LOAD COMPOSITION IN SOUTHERN GRID Domestic Industry Commercial Irrigation Others

14 LOAD MW LOAD MW TYPICAL LOAD SPREAD IN SR

15 SR GRID - HIGHLIGHTS WIDE SPREAD TRANSMISSION NETWORK HIGHEST CAPACITY HVDC LINK IN COUNTRY GENERATING UNITS OF VARIED TYPE & CAPACITYGENERATING UNITS OF VARIED TYPE & CAPACITY 32 Nos. of 400 KV SUB-STATIONS MVA TRANSFORMATION CAPACITY INTER-REGIONAL LINKS WITH ALL NEIGHBOURING REGIONSINTER-REGIONAL LINKS WITH ALL NEIGHBOURING REGIONS

16 GRID OPERATION IN THE PAST LOW FREQUENCY PROBLEMS –FREQUENCY AT 48 HZ AND BELOW FOR MOST TIME LOW VOLTAGE OPERATION –VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 Kv!!!! FREQUENT GRID DISTURBANCES –LOADS FREQUENTLY CUT OFF DUE TO RELAY OPERATION INCREASED ELECTRICAL LOSSES –INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS INEFFICIENT UTILISATION OF RESOURCES FREQUENT DISTURBANCES CAUSED GENERATION LOST EVEN AT PIT HEAD STATIONS GRID OPERATION FOCUSSED ON FIRE-FIGHTING RATHER THAN OPTIMISATION AND ECONOMY

17 GRID OPERATION PRESENT  STABILISED SYSTEM FREQUENCY STABILISED SYSTEM FREQUENCY  IMPROVED VOLTAGES IMPROVED VOLTAGES  MERIT ORDER OPERATION MERIT ORDER OPERATION  INTER REGIONAL EXCHANGES INTER REGIONAL EXCHANGES  IMPROVED GRID SECURITY IMPROVED GRID SECURITY

18 LANDMARKS UNIFIED LOAD DESPATCH SCHEME AVAILABILITY BASED TARIFF TALCHER-KOLAR HVDC LINK OPERATIONAL EXCELLENCE SPECIFIC ACTIONS BY SRLDC FINANCIAL DISCIPLINE SCHD DRWL

19