UNECE Working Group on Environmental Monitoring and Assessment 27-29 November 2006, Geneva Asim Acikel/Tacis Project Coordinator.

Slides:



Advertisements
Similar presentations
1 Background EEA A European Union institution Established by EU Regulation Staff: about 80 Budget: 22 Meuro Copenhagen EEA home page:
Advertisements

Session 2 – WISE SoE TCM data processing and quality issues.
Building upon AIACC a 2nd Phase of Capacity Building? Introduction to the E3 parallel session.
UNECE WGEMA Sixth session, Geneva, June 2006 World Health Organization Regional Office for Europe Dafina Dalbokova, Michal Krzyzanowski Towards a.
The European Topic Centre on Air and Climate Change ETC ACC.
Bo Lim UNFCCC CGE Workshop 8-11 April 2003, Mauritius United Nations Development Programme Training Tools for Good Practice Guidance and Uncertainty Management.
7-8 November 2006 Belgrade, Serbia Extension of the EEA European Topic Centre’s Work Program to the West Balkan Countries in the field of water 1 The EIONET-Water.
COWI PowerPoint design manual# Communication & Design Workshop to Promote Ratification of CLRTAP Protocols Project Air Quality Governance in.
Development methods of the EECCA indicators WGEMA meeting, Geneva, June 2007.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
EEA support to West Balkan countries Milan Chrenko, NFP/Eionet Coordinator European Environment Agency.
Workshop on Interaction between Air-Quality Monitoring and Air-protection Strategies in EECCA Countries UN ECE WGEMA, June 11, 2007 Draft Strategy for.
1 Environmental Information System in Hungary Agnes Martosné Bartha Aarhus Convention’s Task Force on Electronic Tools 2nd Meeting January 2004.
GAINS, air emission inventories and data completeness Karin Kindbom IVL Swedish Environmental Research Institute Russian-Swedish bilateral cooperation.
European Commission Environmental cooperation in the Mediterranean June 2009.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
The first Steering Committee on the Project “ POPs monitoring, reporting and information dissemination using Pollutant Release and Transfer Register (PRTR)
Stocktaking Exercise UNFCCC Workshop, Manila Ravi Sharma United Nations Environment Programme – Global Environment Facility.
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
“Development of the Co-operation within the Convention on Long Range Transboundary Air Pollution” Karin Kindbom IVL Swedish Environmental Research.
1 the Belgrade 2007 report the Belgrade 2007 report Or (working title): The 2007 Belgrade report Europe’s Environment: the fourth assessment.
UN ECE CEP Working Group on Environmental Monitoring and Assessment 7th Session Geneva 27 – 29 November 2006 Item 5(a) Guidelines for the Application of.
Challenges of developing national capacity for PRTR systems in Central and Eastern Europe Magda Tóth Nagy Public Participation Program June 2004.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
JOINT PROJECT of Belarus, Kazakhstan and the Russian Federation Facilitating the implementation and ratification of the protocols of the Convention on.
UN ECE WORKSHOP ON INTERACTION BETWEEN AIR-QUALITY MONITORING AND AIR-PROTECTION STRATEGIES IN EECCA Geneva, 11 June th Pan-European Environment.
1 CAI-Asia China Project CAI-Asia China Project Inception Workshop October, 2005 Beijing PRC.
The Swedish air emission inventory system Karin Kindbom IVL Swedish Environmental Research Institute Russian-Swedish bilateral cooperation project: “Development.
Improving access to environmental information in Eastern Europe, Caucasus and Central Asia Aarhus Convention Task Force on Access to Information Task Force.
TFEIP/EIONET meeting 1/11/2006, Thessaloniki TACIS Training Seminar on Air and Greenhouse Gas Emission Inventories and Reporting Almaty,19 – 20 October.
European Environment Agency EUROPE’S ENVIRONMENT Assessment of Assessments AoA Portal: AoA Contact:
UNECE/WGEMA meeting, June Geneva Agenda item 5: Support to the fourth pan-European assessment report on the state of the environment Preparation.
1 United Nations Economic Commission for Europe 1 ENPI/SEIS Consultation Meeting European Commission, Brussels, 11 November 2010 Current Situation and.
Cooperation with the European Environmental Agency - the Way Forward Svetlana Gjorgjeva, Macedonian NFP/EEA Lisbon, November 2009.
CWC project: next stop Tbilisi Francesca Bernardini United Nations Economic Commission for Europe.
UNECE Working Group on Environmental Monitoring and Assessment June 2007, Geneva Asim Acikel/Tacis Project Coordinator.
Aarhus Convention Task Force on Electronic Information Tools Geneva, January 2004 Chris Jarvis Information Policy Manager.
Assessing Progress in Achieving Objective 6.1 of the EECCA Environment Strategy Roberto MARTÍN-HURTADO OECD/EAP Task Force Secretariat
Developing PRTR Systems in Europe : EPER, E-PRTR and the PRTR Protocol Magda Tóth Nagy Public Participation Programme October 15, 2007.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
Air Quality Governance in the ENPI East Countries EMISSION INVENTORY September 2012 Chisinau, MOLDOVA.
Project «Development of lake Druksiai/Drisviaty Basin Management Program », Initiative of UNEP-UNDP-OSCE-NATO "Ecology and Safety”»
The EECCA Strategy Progress Assessment report Roberto Martín-Hurtado EAP Task Force Secretariat.
1 EEA core set of indicators Anita Pirc Velkavrh Workshop on the Use of Environmental indicators July 5-6, 2004, Chisinau, Republic of Moldova.
Participation of KEPA in the work of the EEA Ministry of Environment and Spatial Planning Kosovo Environmental Protection Agency Kosovo Environmental.
E-PRTR incompleteness check Irene Olivares Industrial Pollution Group Air and Climate Change Programme Eionet NRC workshop on Industrial Pollution Copenhagen.
Sandy Bisaro Global Climate Forum, Germany 8th EIONET workshop on Climate Change Impacts, Vulnerability and Adaptation.
EEA/UNECE WORK ON INDICATORS – WHAT CAN BE USED FOR Country briefings? Katerina Nikolovska, Ministry of Environment and Physical Planning Republic of Macedonia.
D R I V I N G F O R R E S U L T S : S T R E N G T H E N I N G T H E S C I E N C E B A S I S A N D C A T A L Y T I C R O L E O F U N E P UNECE Working Group.
5 Project funded by the Euro- Mediterranean Regional Programme for Local Water Management of the European Union DEVELOPMENT OF TOOLS AND GUIDELINES FOR.
The Global Authority on the Environment Division of Early Warning and Assessment 8th Session UNECE/CEP/WGEMA Palais des Nations, Geneva, June 2007.
Palestinian Environmental Information System November, 2013.
DISSEMINATION MEETING HEAT4U PROJECT Gas Absorption Heat Pump solution for existing residential buildings Luigi Tischer, Project Coordinator HEAT4U PROJECT.
Monitoring Forest Resources for SFM in the UNECE Region
UNECE Aarhus Convention Secretariat
WP 7 – Dissemination and Network Development
COPERT 4 training workshop
SEPA AND EEA, FIVE YEARS OF COOPERATION
EEA Annual Work Programme
Methodological studies in the field of Agro-Environmental Indicators
Eva Royo Gelabert Project Manager Marine assessments
Time table for revision of the NECD
Status on eu actions from the kick-off meeting
Eva Royo Gelabert Project Manager Marine assessments
Eva Royo Gelabert Project Manager Marine assessments
Quality aspects of EPER
UNEP / Division of Early Warning and Assessment (DEWA)
UNEP / Division of Early Warning and Assessment (DEWA)
Sixth SPECA Project Working Group Meeting Geneva, 16 June 2011
Presentation transcript:

UNECE Working Group on Environmental Monitoring and Assessment November 2006, Geneva Asim Acikel/Tacis Project Coordinator

TACIS project ( ) Presentation on Tacis project at the 6 th Session of UNECE/WGEMA is available at ( cis_06/fol468791/doc614226) cis_06/fol468791/doc Effective start of the Tacis project was announced at the 6 th Session of UNECE/WGEMA and was notified to the Ministries of Environment of EECCA countries in June 2006 Tacis project objectives, outputs, plan of operations, logical framework, overall output performance plan, newsletter (RU/EN) etc., is available at Tacis website under Belgrade portal of the EEA website ( cis_06) cis_06

Project focus & structure 3 key areas: A. Water B. Air and climate change C. Improve environmental information and reporting in the framework of Belgrade report preparations (with focus on indicators)

Water component Tasks: Needs assessment reports on water quality monitoring for each EECCA country for future funding through international/bilatera l donors; Support EECCA countries in development of national databases and data sharing Eionet water (AZ, BE, MO, RU, UKR) Training and capacity building in the field of water management. Activities: Country visits to 10 EECCA countries were carried out for: Needs Assessment on water quality monitoring (sampling, laboratory analysis and information management) Assessment of the state of the national databases and the capacity to be able to provide data electronically for the construction of indicators (i.e. join in the Eionet-Water priority data flows)

Preliminary findings for Needs Assessment

Preliminary Findings for Capacity to deliver data for EECCA water indicators AMAZBYGEKZKG MDRUTJTMUAUZ N/I N/I

Air and Climate change component Tasks: Training of EECCA experts through participation in relevant Tacis workshops Support in the translation of the EMEP/CORINAIR Emission Inventory Guidebook. Activities: TACIS training seminar on air pollutant and greenhouse gas emission inventories, October 2006, Almaty, Kazakstan Tacis training seminar on air quality monitoring, assessment and management in EEA and EECCA region, November 2006, Chisinau, Moldova EMEP/CORINAIR Emission Inventory Guidebook translated into Russian (QC in process)

Feedbacks from participants to the workshops Workshops were assessed as useful and practical one Underlined importance of continuity and systematic approach, Participants suggestions for future capacity building/trainings on: available inventory IT tools calculation of uncertainties How to use facility level data for the national inventory (reliability, incompleteness) health impact of air quality in bigger cities of EECCA region, methodology for monitoring and measurements of air pollution (case studies), air quality modelling in EECCA countries Participation in EIONET air workshops Country-specific trainings

Improve env. information and reporting: Belgrade report preparation Tasks: Build expertise in environmental assessment & the use of indicators; Production of EECCA core set of indicator methodological guide and compendium Review of Belgrade report chapters on the occasion of different Tacis project events/workshops/ meetings Activities: UNEP and UNECE are partners for development of EECCA CSI Methodological guide and compendium (see presentation of UNEP and UNECE for details) Review of draft pan- European Assessment Report, Belgrade 2007: Consultation with non- governmental and other bodies, November 16-17, 2006, Copenhagen (Eco-Forum)