IWG Update January 2015 ISAS Danielle Johnson. Review of the WECC PreSchedule Guidelines PreSchedule Calendar Guideline (Last updated in 2010). Per IWG.

Slides:



Advertisements
Similar presentations
e-Tag Functional Specification
Advertisements

E-Tag 1.8 An industry tutorial.
NAESB Coordinate Interchange
Dynamic Schedule e-tagging Requirements Criterion WECC-087 (formerly INT-008) ISAS Report January 2012.
Primary Objectives of WIT
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the MIC March 2013 Salt Lake City, UT.
Bob Harshbarger Volunteer Order 771 January 16, 2013 Still Icy-Cold Salt Lake.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the OC October 2013 Salt Lake City, UT.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Interchange Scheduling and Accounting Subcommittee Update WECC OC Meeting June 2009 Salt Lake City, Utah Marilyn Franz ISAS Chair.
ISAS Liaison Report October 25-26, 2007 MIC Meeting.
MIC/ISAS LIAISON REPORT June 15, 2007 April, 2007 ISAS Meeting Highlights.
ACE Diversity Interchange (ADI)
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Gary Nolan Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
FERC Order minute Scheduling.
Review of August Action Items Andrew Meyers January 2014 Salt Lake City, UT.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the OC March 2014 Salt Lake City, UT.
ISAS Update August 2, 2011 Market Issues Subcommittee.
MIC Scheduling Group JJ Jamieson MIC Scheduling Group Chair October 13, 2011.
WECC Reliability Management System Tagging Requirements Before the WECC MIS Meeting November 13, 2009 By David Lemmons.
IWG Update April 2014 ISAS Danielle Johnson. WIAB Test – Still looking for other volunteers for the WIAB Fall 2014 – Volunteer as of Today WAPA Rocky.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
ISAS Report To the OC Andy Meyers Interchange Scheduling & Accounting Subcommittee Chair October 2014 Salt Lake City, UT W ESTERN E LECTRICITY C OORDINATING.
Shawn Davis Regional Policy and Operations Analyst Portland General Electric Proposed Mid-C Scheduling Changes August 20, 2014 Interchange Scheduling and.
Standards Development Improvement Opportunities February 18, 2014.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
2015 WECC Spring Scheduler’s Meeting
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Update: WIT Contract Ownership January 2015 Salt Lake City, UT.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
BCTC Customer Consultation on Loss Compensation Service January 15, 2007.
Joint Electric Scheduling Subcommittee Update August 20, 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
Reserves Issue For years there has been disagreement over reserves issues and what constitutes firm power. We’ve been able to function as a market, despite.
Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT.
Meeting Deliverables Update on talk with vendor – 5’ Review call flow process – 20 ‘ – Finalize hours issues and next steps – Work to finalize call flows.
Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010 WECC VGS--REC Impacts Work Team Update Paul F Arnold—VP ColumbiaGrid.
ERS Update Plus Revisions to Proposed Changes for ERS Time Periods Presented to: Demand Side Working Group November 5, 2014.
Kathy Anderson Idaho Power
COPS conference call PRR 638 Implementation COPS January 30 th 2006.
Joint Electric Scheduling Subcommittee Update October 29, 2013.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
ISAS Report Andy Meyers ISAS Chair Operating Committee Meeting October 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: December 6 th Outage January 2015 Salt Lake City, UT.
Tuesday, October 6, 2015 (following RMS) COPS-RMS-WORKSHOPShttp://
UNCONDITIONAL AND LEAD TIMES PREEMPTION AND COMPETITION TIMING.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WECC PRESCHEDULE CALENDAR GUIDELINES BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
Interchange Scheduling & Accounting Subcommittee (ISAS) Charles (Bud) Freeman, SCL W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
CJA 464 Week 1 DQ 2 NEW Check this A+ tutorial guideline at 464-NEW/CJA-464-Week-1-DQ-2-NEW What is the role of state.
BPA 303 Week 2 Learning Team Policy Implementation Check this A+ tutorial guideline at Week-2-Learning-Team-Policy-Implementation.
Interchange Scheduling & Accounting Subcommittee
Transmission Outage Coordination
WECC-0118 Removal of Interchange Authority
Anitha Neve Operations and Interchange Specialist
Anitha Neve Operations and Interchange Specialist
IWG Interchange Workgroup
Anitha Neve Operations and Interchange Specialist
After-the-Fact Workgroup Update Sheryl Welch
IWG Interchange Workgroup January 2016 Danielle Johnson
IWG Update January 2015 ISAS Danielle Johnson.
Anitha Neve Operations and Interchange Specialist
WECC PRESCHEDULE CALENDAR GUIDELINES
IWG Interchange Workgroup
IWG Interchange Workgroup January 2016 Danielle Johnson
Andy Meyers ISAS Chair Operating Committee Meeting October 2015
WIAB WECC Interchange Authority Backup
Presentation transcript:

IWG Update January 2015 ISAS Danielle Johnson

Review of the WECC PreSchedule Guidelines PreSchedule Calendar Guideline (Last updated in 2010). Per IWG discussion 08/26/2015 : Request for 2/3/2 for Thanksgiving to accommodate early out prior to Holiday, and elevate pressure on third day. – Used to be 2/3/2 but received a request to be closer to flow. Does it still apply in today world>. Take a look at gas schedule, does it still align? Participant (s) cautioned about changes to guideline. – Overall appears to be working

Con’t review of the WECC PreSchedule Guidelines Per IWG discussion : If Christmas falls on Thursday follow Thanksgiving schedule – Impacts with Christmas Eve – Concern on Scheduling with three holidays in a row – Occurs approx. every 5 years. – Friday after Christmas can be declared Federal Holiday. Next Steps: – Review the Gas Schedule and alignment with WECC PreSchedule Calendar, – Review impact of the 2 request. – Recommendations January ISAS

Impact of changes to the INT-003-WECC-CRT-2.1 – Changes in INT-021 WECC WIT Check out Confirmation WR2 WR2. Each Balancing Authority shall confirm its common NSI with each Adjacent Balancing Authority at the following time periods: – Prior to implementing the energy profile of the aggregated Confirmed Interchange (and) – After the operating hour. Heads up – This may transition to some BA’s not checking out in WIT for PreSchedule.

WIAB Desk Top Exercise Fall of 2015 Looking for volunteers – Need BA’s, – Intermediate TP’s – Marketer BPA Transmission willing to participate