SOCIO-ECONOMIC EVALUATION OF ITS- INVESTMENTS How to make cost-benefit analyses to a better tool for analysing the socio-economic profitability of ITS-investments.

Slides:



Advertisements
Similar presentations
A Primer on Benefit-Cost Analysis Presented to: The Reclaimed Water Technical Committee June 2, 2006 By Bruce Flory, Ph. D. Seattle Public Utilities.
Advertisements

Forecasting Traffic and Toll Revenue for Public-Private Partnerships (P3) vs. Metropolitan Planning Organizations (MPO): A comparison 14 th TRB National.
Measuring Costs and Benefits Measuring Benefits and Costs (See Chap 4): –Consumers’ Willingness to Pay (WTP) –Consumer Surplus (CS) –Producers’ Surplus.
1 This document and its contents are the property of The University of Iowa’s Public Policy Center National Evaluation of a Mileage- Based Road User Charge.
Investment Decision-making. Content Investment Issues with investment appraisal Investment appraisal techniques: –Payback –Average Rate of Return (ARR)
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Managing Finance and Budgets Seminar 7. Follow-up Activities  Read Chapter 14 (including EPNV)  Describe key concepts: Purpose of Investment Appraisal.
Integrated Analysis of Transportation Network with Pipeline System Vulnerabilities Berrin Tansel 1, Xia Jin 1, Kollol Shams 1, Bahareh Inanloo 1, Albert.
1 Finance: Net Present Value 8.1 ECON 201 Summer 2009.
Briefing on a Cost-Benefit Analysis Framework for Transit Investments in the Washington Region David Lewis Ph.D. Chief Economist HDR|Decision Economics.
Feasibility Study Preparation Venelina Varbova. Session Overview  Purpose of the Feasibility Study  The Feasibility Study process according.
© Copyright DTU-CTT 2006 Technical University of Denmark Centre for Traffic and Transport - CTT COSIMA-ROAD - Modelling Decision Support and Uncertainty.
Economics of Land Degradation Initiative Richard J. Thomas ELD Scientific coordinator United Nations University Institute for Water, Environment and Health.
University of Minho School of Engineering Centre Algoritmi Uma Escola a Reinventar o Futuro – Semana da Escola de Engenharia - 24 a 27 de Outubro de 2011.
Risto Kulmala 1 Guidelines for Evaluation of ITS Projects Risto Kulmala VTT Communities and Infrastructure.
03 July 2015Course Overview1 Energy Project Evaluation RES Course ESP606 Goal: To build up knowledge to so that participants will be able to assess if.
FDM9 Capital investment appraisal 1 Capital investment appraisal 1.
Economic Analysis in Transportation Systems Tapan K. Datta, Ph.D, P.E. CE 7640: Fall 2002.
Project Detailed Business Case
MANAGERIAL ECONOMICS.
Chapter 3 – Opportunity Cost of Capital and Capital Budgeting
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
ECONOMIC IMPACT OF AIR POLLUTION ON HUMAN HEALTH
Project Planning and Capital Budgeting
Basic Economic Concepts. OBJECTIVE: The student will become familiar with the following items: Economic Fundamentals –Scarcity –Choices –Basis of Benefits.
The Laws of Demand and Supply.
ETSI Methodology1 LCC Methodology Håkan Sundquist Structural Design and Bridges KTH.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Economic Analysis: Applications to Work Zones March 25, 2004.
Chapter 10 CBA and valuation1 CHAPTER 10 Cost-Benefit Analysis and Valuation.
1 Chapter 12 Benefit-Cost Analysis Framework of Benefit- Cost Analysis Evaluation of Benefits and Costs Benefit-Cost Ratios.
Portfolio Committee on Police Briefing: 4 th Quarter Financial Report 2012/13 17 SEPTEMBER 2013.
Environmental Economics Class 6. Concepts Static efficiency Dynamic efficiency Static efficiency allows us to evaluate those circumstances where time.
COST BENEFIT ANALYSIS- PUBLIC SECTOR INVESTMENTS Lucky Yona.
Evaluating the Profitability of an Investment Jim Dunn Ag Economist Penn State University 203 Armsby Building University Park, PA
On visible choice set and scope sensitivity: - Dealing with the impact of study design on the scope sensitivity Improving the Practice of Benefit Transfer:
Value of information Marko Tainio Decision analysis and Risk Management course in Kuopio
Cost-Benefit Analysis A presentation by Robin Sherbourne of the Institute for Public Policy Research to the Ministry of Finance 24 June 2003.
Empowering Farmers The Canadian Supply Management Experience Bruce Saunders 1st Vice-President, Dairy Farmers of Canada Chapeco, Brazil, January, 2005.
Evaluating the Impacts of Real Time Passenger Information and Bus Signal Priority in Trondheim Morten Welde, Norwegian Public Roads Administration Trond.
National Urban Transport Modelling Workshop March 2008 Traffic Management and Microsimulation Rod Tudge RTA and Chris Wilson MWT.
Melbourne vs Hyderabad A Presentation on Cost/Benefit Analysis of the Formula One Grand Prix Events By Amrita Vaswani, Amit Vibhakar, Tom Merkli 18 June.
Conceptual Tools The creation of new and improved financial products through innovative design or repackaging of existing financial instruments. Financial.
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 3 Valuing the Environment: Methods.
Feasibility Study.
1 Cost-Benefit Analysis Public Economics Minda DC. Eduarte.
Capital Insight Pty Limited ABN Berry Street North Sydney NSW 2060 t f Health Economics.
Test 2 Review Chapters 5, 6, 7, 8, 10 & Project Mgt.
Economic valuation OF NATURAL RESOURCES
1 Statewide Lidar Cost/Benefit Analysis Sam Hall Geospatial Projects Manager Virginia Geographic Information Network January 9, 2008.
Copyright © 2008 Pearson Education Canada16-1 Chapter 16 Investment Decision Applications Contemporary Business Mathematics With Canadian Applications.
Social cost benefit analysis of Delhi Metro
COST BENEFIT ANALYSIS, DEVELOPMENT PLANNING AND THE EU COHESION FUND: LEARNING FROM EXPERIENCE Massimo Florio and Silvia Vignetti University of Milan and.
CBA of Interoperability Freddie Rosenberg ECORYS Gilles Gardiol AIEF TRANSPORT.
Investment Decision-making Learning Outcomes To be able to perform investment appraisal calculations (E) To be able to analyse the investment appraisal.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
Urban Institute Ireland/University College Dublin School of Geography, Planning and Environmental Policy, Dublin, Ireland Eda Ustaoglu.
High-Speed Trains and cost- benefit analysis Steinar Strøm, University of Turin
Economic Analysis in the Public Sector Benefit/Cost Analysis.
Road Investment Decision Framework
“ Tools for MoS-Applications ” Assessing modal shift, environmental impact and socio-economic impact Jutta Wolff Institute for Transport Planning and Logistics,
Feasibility.
EWG Study Tour, Galway, 18/09/2006
Project Feasibility Analysis
Economics of Energy Efficient Lighting
Investment Chapter 9.
Costing and Finance P R Upadhyay.
Economics for Engineers Economic Decision Making
FINA1129 Corporate Financial Management
Competitive Industry Report and Calculations
Presentation transcript:

SOCIO-ECONOMIC EVALUATION OF ITS- INVESTMENTS How to make cost-benefit analyses to a better tool for analysing the socio-economic profitability of ITS-investments.

Content of the project Brief overview over different areas of application Selection of alternatives Literature studies Socio-economic evaluation of consequences, except road-user utility Different solutions for road-user utility Discount future amounts. Summarise to find net present value.

Areas of application and delimitation of the project Traffic monitoring and traffic management Public transport Freight transport Payment systems and access control Navigation systems “The intelligent vehicle” ­Disregard projects of “personal character” ­Concentrate on areas supported by public funds. The information is available for all travellers. =Main focus on traffic monitoring and traffic management

Socio-economic estimation of value Consequences: Investment costs Operating costs Maintenance costs Eventually environmental and accident costs  Other risk evaluation for ITS-investments than for traditional investments

Road-user utility... Basis alternative: -G 0 = Generalised cost -X 0 = Number of travel Initiative alternative: -G 1 = Reduced generalised cost -X 1 = Increased number of travel Demand curve Generalised traveller cost X 0 X 1 Travel G0G1G0G1 … is the change in consumers’ surplus as a consequence of the initiative. Improvement of quality is not included in the generalised cost, but in the “not- priced” effect of the initiative. Information might give better quality, but how can that be measured ?

Road-user utility Different ways to measure road-user benefit: Traditional cost/benefit analyse Revealed Preference or Stated Preference Travel cost

Transport models Micro-simulation Macro-simulation  Simulation with AND without information

Conclusions Transportation models: Initiatives for better road-user information can be modelled by micro-simulation, but have to calculate macro-parameters like travel-time and vehicle-kilometre. Data: Several data are necessary to model the road-user behaviour. Road-user utility: Alternative methods for measuring. Stated preference-test, and travel-cost which allow for divagation from expected arrival time. Risk evaluation: Appraise the difference in systematic risk for the ITS-project compared to investments in infrastructure, and then choose discount rate.