Wastewater Treatment Workgroup Conference Call Tuesday, July 10, 2012 Marty Hurd WWDB Data Reporting System.

Slides:



Advertisements
Similar presentations
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Advertisements

Benefit and Cost Analyses of the Chesapeake Bay TMDL Chesapeake Bay Program Office Kevin DeBell Office of Policy, National Center.
Stormwater Management/ MS4 Permitting International Municipal Lawyers Association 2014 Annual Conference Baltimore, Maryland Gene Tanaka
Chesapeake Bay Total Maximum Daily Load (TMDL) Tracking Thursday, May 31, 2012 Martin Hurd, Vladislav Royzman, Tetra Tech, Inc. Brian Burch, Megan Thynge,
Nutrient Trading Framework in the Coosa Basin Alabama Water Resources Conference September 6, 2012 A Feasibility Study of Nutrient Trading in Support of.
CBP Partnership Proposal for Ensuring Full Accountability of Best Practices and Technologies Implemented CBP WQGIT Wastewater Treatment Workgroup Briefing.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
Chesapeake Bay Restoration An EPA Perspective Jeff Corbin Senior Advisor to the Administrator U.S. EPA.
CBP Partnership’s BMP Verification Review Panel’s Findings and Recommendations to Date CBP Citizens Advisory Committee December 6, 2013 Meeting Rich Batiuk,
Jim Edward, Deputy Director Chesapeake Bay Program (EPA) 1 CBP Program Update Citizens Advisory Committee February 27, 2014.
1 Agriculture Workgroup Mid-Point Assessment Priorities Water Quality Goal Implementation Team Meeting Fairfield, Pennsylvania October 22-23, 2012.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
1 National Hydrography Dataset Application Symposium Andrew T. Battin Senior Information Resource Management Official U.S. Environmental Protection Agency.
Chesapeake Bay Program Partnership’s Basinwide BMP Verification Framework Briefing CBP Partnership’s Communications Workgroup July 10, 2014.
Federal Clean Water Act Monitoring and assessments completed statewide Standards not met? Section 303 (d) requires placing the water body on the “Impaired.
1 “ Understanding the Local Role of Improving Water Quality” Virginia Association of Counties November 14, 2011 Virginia Association of Counties November.
Chesapeake Assessment Scenario Tool CAST Olivia H. Devereux Interstate Commission on the Potomac River Basin 12/13/2011.
Virginia Assessment Scenario Tool VAST Developed by: Interstate Commission on the Potomac River Basin.
Chesapeake Bay Program Partnership’s Basinwide BMP Verification Framework: Building Confidence in Delivering on Pollution Reductions to Local Waters Delaware.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Developing Final Phase II WIPs and Milestones Jim Edward EPA Deputy Director Chesapeake Bay Program Office DDOE Meeting with Federal Partners February.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
What is the Chesapeake Bay TMDL? Total Maximum Daily Load –Amount of pollutants that a water body can receive and still support designated uses Drinking,
Chesapeake Bay TMDL & Watershed Implementation Plans The Role of Local Governments Jeff Corbin Senior Advisor to the Administrator U.S. EPA Presentation.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Virginia’s Chesapeake Bay Nutrient Credit Trading Program
Standard 4 – Inspection Audit Program
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Status Report on Chesapeake Bay Clean Up Plan Wastewater Sector June 2, 2010.
Chesapeake Bay Policy in Virginia - TMDL, Milestones and the Watershed Agreement Russ Baxter Deputy Secretary of Natural Resources for the Chesapeake Bay.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
Chesapeake Bay Program Partnership’s Basinwide BMP Verification Framework: Building Confidence in Delivering on Pollution Reductions to Local Waters Maryland.
Wastewater Workgroup Conference Call December 6, 2011.
1 Phase 5.3 Calibration Gary Shenk 3/31/ Calibration Method Calibration method largely unchanged for several years –P5.1 – 8/ first automated.
Chesapeake Bay TMDL 2017 Midpoint Assessment: A Critical Path Forward Lucinda Power EPA Chesapeake Bay Program Office Citizens Advisory Committee Meeting.
Answering the Question: Why? Factors Affecting Change in Water Quality Exceptional challenge to explain “why” Poor quality of pollution source information.
Point Sources Progress Reporting Management Board Conference Call February 9, 2012.
Update on Chesapeake Bay Program Developments Briefing to the Water Resources Technical Committee October 9, 2009 (revised) Briefing to the Water Resources.
Chesapeake Bay Watershed Implementation Plans: Why, What, and When Katherine Antos U.S. EPA Chesapeake Bay Program Office MACo Winter Conference January.
Potential Activities, Costs, and Priorities for Watershed Monitoring Scott Phillips Joel Blomquist Katie Foreman Eff/Opt Conf Call July 24, 2009.
Katherine Antos, Water Quality Team Leader Water Quality Goal Implementation Team Coordinator U.S. EPA Chesapeake Bay Program Office Chesapeake Bay Program.
Verification Requests Citizen Advisory Committee –Repeated requests for BMP verification Chesapeake Executive Order Strategy –USDA and EPA commitment to.
JULIE MAWHORTER MID-ATLANTIC URBAN & COMMUNITY FORESTRY COORDINATOR CHESAPEAKE TREE CANOPY STRATEGY & WORKPLAN UPDATE CITIZEN’S ADVISORY.
Integrated Approach for Assessing and Communicating Progress toward the Chesapeake Bay Water-Quality Standards Scott Phillips USGS, STAR May 14, 2012 PSC.
Northern Virginia Regional Commission MS4 Meeting March 17, 2011 Virginia Phase II Watershed Implementation Plan (WIP) Approach.
1 Chesapeake Bay TMDL Watershed Implementation Plan – Phase II James Davis-Martin, Chesapeake Bay TMDL Coordinator Citizens Advisory Committee to the Chesapeake.
New York’s Chesapeake Bay WIP
Innovative Data Management and Planning Strategies for TMDL Compliance
Overview
Chesapeake bay program
CBP Update: Climate Change and the Chesapeake Bay TMDL
Proposed Bay TMDL Schedule
Chesapeake Bay Program Partnership’s Citizens Advisory Committee
Chesapeake Bay Program
Watershed Implementation Plan
GIS Data Management for SHA’s Bay Restoration Program
Federal Facilities and the District’s Phase III WIP
Hi there! Michelle Williams WQGIT Staffer
2017 Midpoint Assessment: Year of Decision October 5, 2017 Local Government Advisory Committee Meeting.
Developing a Water Quality Trading Framework
Water Quality Trading Advisory Committee MDA Headquarters
What is a Watershed Implementation Plan?
Maryland’s Phase III WIP Planning for 2025 and beyond
“Phase 6 Septic vs Local/State Data”
Water Quality Trading Advisory Committee MDA Headquarters
Chesapeake Bay Program Climate Change Modeling 2
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Expectations for Federal Agencies in Support if Chesapeake WIPs/TMDL
Draft BMP Verification Protocols for Non-significant WWTPs Combined Sewer Overflows On-site Wastewater Treatment Systems CBPO Wastewater Workgroup.
2018 BMP Verification Assessment
Presentation transcript:

Wastewater Treatment Workgroup Conference Call Tuesday, July 10, 2012 Marty Hurd WWDB Data Reporting System

Review: CBP Data Administrator loads and QA/QC’s data Required nutrient species determined & non-significant facilities added Loads calculated from reported measurements & discharge Feedback & Review reports available online Jurisdictions supply annual facility data If changes are required Data finalized & confirmed BayTAS

Completed: Database Design & Build Data Migration Legacy CBP data 2011 Data Submission Data Loader Validations

Scenario Builder Watershed Model CBP Data Hub TMDL Tracking & Accounting System (BayTAS) Chesapeake Assessment & Scenario Tool (CAST) WIP Appendix Q Integration BayTAS

Time frame? March: Integration Tasks July:Complete DB mods August:Test – Feedback