April 29, 2009 M. Ross for PM Global Design Effort 1 GDE Global Program Marc Ross for: Akira Yamamoto, Nick Walker GDE Project Managers Risk Reduction.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
27-September-08 2nd Asian ILC R&D Seminar Global Design Effort 1 Barry Barish 2 nd Asian ILC R&D Seminar 29-September-08 Progress toward the ILC ATF-2.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
17-April-09 TILC09 Global Design Effort 1 Barry Barish TILC09 – Tsukuba, Japan 17-April-09 ILC / GDE Report Electron Cloud at CesrTA.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
AAP Review, Tsukuba, June Marc Ross, FermilabM. Ross for PM Global Design Effort 1 Project Manager’s Report presented by Marc Ross - for.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
14-Feb-08 HEPAP Global Design Effort 1 Navigating the Bumpy Road to the ILC Barry Barish GDE Workshop - Sendai 3-March-08.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Summary and Discussion AAP-SCRF-Summary.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
23-April-13 ECFA LC2013 Global Design Effort 1 Barry Barish ECFA LC2013 DESY Hamburg, Germany 27-May-13 GDE The path to a TDR.
28-Jan-08 SiD Workshop Global Design Effort 1 ILC Status Impacts of US/UK Budget Actions Replan for GDE Technical Design Phase Barry Barish SiD Workshop.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Presented by Marc Ross - for the ILC Project Managers: Research and Development Resources PAC Review, Vancouver, Marc Ross, Fermilab - Global.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC Project Management Status
Report on plan to produce an Engineering Design Report
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
CLIC/ILC Collaboration Meeting: Objectives & Organization
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

April 29, 2009 M. Ross for PM Global Design Effort 1 GDE Global Program Marc Ross for: Akira Yamamoto, Nick Walker GDE Project Managers Risk Reduction (Cost, schedule, technical) and Cost Reduction through R&D and design work

April 29, 2009M. Ross for PM Global Design Effort 2 Global Design Effort Technical Design Phase Goal: Develop an ‘ILC Project Proposal’ by mid-2012 –A complete and updated technical description –Results from critical R&D programs –One or more models for a Project Implementation Plan that include in-kind contribution schemes –An updated and robust VALUE estimate and construction schedule TD Phase 1 (July 2010) –Critical R & D –Potential for cost reduction –Re-baseline to prepare for technical design –Updated VALUE estimate and schedule –Project Implementation Plan

2008/2009: The R&D Plan Goals, Resources and Schedule for the Global Program –Release 3, 02/2009Release 3, 02/2009 Supporting documents: –Minimum MachineMinimum Machine –Plug CompatibilityPlug Compatibility

TD Phase 1 Schedule Published in: ILC Research and Development Plan for the Technical Design Phase Release 3, June 2009 (next release 6 months) Describe the global context for these activities Show that the ART program supports and is consistent with GDE TDP1 plan Value engineering Global Project Plan High Gradient Cryomodule test SCRF Linac test Electron Cloud Precision beam control Value engineering

April 29, 2009M. Ross for PM Global Design Effort 5 High Gradient: Motivation: –large potential impact on the cost of the ILC. –RDR gradient choice is 35 MV/m in vertical test –present average: 33 MV/m Limitations: –Fabrication: Equator electron beam welding (EBW) Done in industry –Surface processing - Field emission Clean room practice High purity water rinse Chemical process and rinse Testing infrastructure Done at institutions

Cavity R&D: To do  Focus on the fabrication process, –specially on EBW and understand the reasons for defects observed near the heat affected zone, Widely adopt high-resolution optical inspection system –Directly to cavity fabricators/manufacturers, and –Accumulate more inspection data and which can be shared by the cavity communities for quick feedback to fabrication process, Boost laboratory-industry cooperation –fair contribution and fair benefit/return, between laboratories and industries, –Leading to technology transfer, leveraged on laboratories contribution and effort AAP-SCRF-Summary 6

Guidance and Advice from TESLA Technology Collaboration (TTC) TTC: derived from the TESLA Collaboration –Credited with TESLA SRF design Active across a broad set of SCRF topics

April 29, 2009M. Ross for PM Global Design Effort 8 Cryomodule Test – checking global ‘plug compatibility’ Goal: R&D on the Cryomodule facilitates the development of a detailed ILC Project Implementation Plan –including an achievable project schedule and plan for competitive industrialization in all regions. assume ILC will require a flexible design based on modular sub- components. Strategy: provide framework for technical and industrial development –Specify engineering interfaces between Cryomodule sub- components and if possible within them Plan: assemble and test a high-performance (31.5 MV/m average) cryomodule at KEK using components from each region (TDP 1) –2 cavities from US, 2 from EU, 4 from Asia complements US CM efforts

AAP-SCRF-Summary 9 Plug-compatibility: Summary Plug Compatibility is –a means to allow continued innovation from existing and new(!) collaborators while acknowledging the work is part of a larger effort. –a way to segregate work such that efforts on components and systems can proceed in parallel –a means in the longer term to be more efficient in infrastructure usage Plug Compatibility does –have an initial setup cost –impose some minimal boundary conditions, though strong efforts are made to keep them as minimal as possible

How we may prepare for Industrialization and cost reduction? Re-visit previous effort, and update the cost- estimate for production –Understand the cost estimate in RDR mainly based on TESLA design work at ~ 10 years ago and the subsequent experience, –Reflect recent R&D experience with laboratories and industries, Encourage R&D Facilities for industrialization –To Learn cost-effective manufacturing, quality control and cost- reduction in cooperation with industries, It is important to facilitate them at major SCRF laboratories and extend the experiences at various laboratories (DESY, Jlab, Cornell and others), Reflect the R&D progress for cost-reduction Main effort for Baseline >> Forming, EBW, assembly work … Alternate effort with limited scale>> large-grain, seamless, or … AAP-SCRF-Summary 10

April 29, 2009M. Ross for PM Global Design Effort 11 SCRF Linac Systems Test Goal: Demonstrate precision accelerator control in nominal ILC conditions –high gradient, full beam loading: 31MV/m, 9 mA, 5Hz –Achieve nominal performance specifications in realistic conditions  energy spread, stability etc Test higher order mode absorbers, cryo system, instrumentation… Strategy: DESY – FLASH/TTF is the only suitable test facility available during TDP1 –scale, beam parameters, instrumentation etc –testing also supports ongoing DESY projects / programs Status: DESY – led, KEK, FNAL team started March 2008 To be complete by March 2009.

ILC Linac Demonstration  AAP Review, Tsukuba, Marc Ross, Fermilab 12 R and D Plan (2009): “The effort to realize a cryomodule-string test in each region is highly encouraged as an important milestone for anticipated regional centres for the ILC construction period.” Demonstration will be done at the DESY-based main linac beam test facility TTF2/FLASH Nominal ILC performance – –Reduced gradient  (see upcoming talk) The highest priority goal: –to demonstrate beam phase and energy stability at nominal current (includes bunch-to-bunch energy difference and pulse to pulse energy stability) Fermilab / KEK SCRF linacs ~ 2011

A string test in each region: Complementary testing: –Each region must develop industry and must develop ‘ownership’ of this critical technology –including the cryomodules, beam generation and handling and the RF power source and distribution systems. No one system will represent the baseline reference design RF unit design, exactly, within the TD Phase time scale. –due to institutional commitments to support parallel projects and also to conventional facilities limitations Fermilab: KEK: DESY: –Limitations: Beam format number of CM gradient. Strategy must account for infrastructure limitations and construction schedules at each of the three main linac test facilities under development. AAP Review, Tsukuba, Marc Ross, Fermilab 13

SCRF Test Linac Goals: AAP Review, Tsukuba, Marc Ross, Fermilab 14 In addition, to be done at the above facilities: Secondary goals - impact on cost: –demonstrate operation of RF-unit, –determine power overhead –measure dark current and x-ray emission –heating from higher order modes Finally - understanding main linac subsystem performance. –fault recognition and recovery procedures; –cavity quench rates and coupler breakdowns, –testing component reliability, –long term testing of cryomodule –tunnel mock up

XFEL vs. FLASH experiment TTF/FLASH 9mA Mini-Workshop, January 16th, 2009 Hans Weise / DESY 15 XFELILCFLASH design FLASH experiment Bunch chargenC # bunches3250 * * 2400 Pulse length ss CurrentmA5999

April 29, 2009M. Ross for PM Global Design Effort 16 Accelerator Test Facilities CesrTA - Control and mitigation of electron cloud effects –Global collaboration led by Cornell: KEK: support for wiggler vacuum chamber, implementation of beam size monitors CERN & Fermilab: integration with proton accelerator electron cloud R & D –Strategy: Test: vacuum chamber coatings, design, instrumentation and surface modeling Test: beam dynamics simulations ATF / ATF2 – control and monitoring of precision beams –Global Collaboration led by KEK and SLAC: Based loosely on the ATF collaboration MOU Strong participation from all regions; a rough model of an in-kind ILC- like project –Strategy: Test demagnification optics, tuning process and instrumentation with the ultra-low emittance ATF beam –(2 pm-rad vertical normalized emittance)

April 29, 2009M. Ross for PM Global Design Effort 17 Test Facility Milestones

Electron Cloud R & D By mid-2010, CesrTA will have studied: –Coated vacuum chambers  several coatings –Electrodes –Grooved vacuum chambers –(and ‘bare’ chambers’ as control) Cloud density measurements: –Electron analyzers –Tune measurements Low emittance tuning Comprehensive program, includes simulation activities –adequately supported AAP Review, Tsukuba, Marc Ross, Fermilab 18

Damping Ring and Beam Delivery  the ATF / ATF2 Program: –Overall Goals; –Demonstration of focusing and stability; –Demonstration of ultra-low emittance A fundamentally international / inter-regional collaboration Commissioning started 2009 Beam tuning / beam optics studies underway AAP Review, Tsukuba, Marc Ross, Fermilab 19

AAP Review, Tsukuba, Marc Ross, Fermilab 21 Conventional Facilities and Siting Purpose of CF / S effort in TDP: –CF (utilities) effort cost driver, schedule driver Can be challenging (e.g. J-Parc, Numi, …) –Fundamentally technical and political – more so than any other single project component Flexibility should be a consideration in criteria development process –Development of site-specific technical criteria in order aid preparation of ‘hosting bids’ Basic focus of our Accelerator Design and Integration Activity –Iterating CFS design (‘value engineering’) –Many aspects of this machine are unusual  e.g. underground utility usage –Balance between generic design development and consideration of specific site details

Site Specific vs Generic Design AAP Review, Tsukuba, Marc Ross, Fermilab 22 Reference Design is based on a generic twin – tunnel topology  –adapted to sample sites - one in each region: Fermilab, CERN, Japan –2007 Value estimate based on average –Topology-related cost differences between regions ~ small NOT an optimized, site-specific adaptation of Technical systems –Power / water, High level RF distribution, cryogenics  these were NOT adapted in Reference Design to suit each of the 3 sample sites A common ‘generic’ design for the above chosen / costed for RDR

“Minimum Machine”  Design and Integration Studies: toward a Re-Baseline in 2010 which will be the basis of TDP2 Engineering Design and Costing

VERY PRELIMANRY! to be confirmed Main Linac (total) ~ 300 MILCU Low-Power option ~ 400 MILCU Central injector Integration ~ 100 MILCU Single-stage compressor ~ 100 MILCU Cost Decrements (Rough Estimates) –VERY preliminary: better estimates will be made (end 2009) But still based/scaled from RDR value estimate –Elements not independent! Careful of potential double counting! –Cost vs Performance vs Risk: important information for making informed decisions in

April 29, 2009M. Ross for PM Global Design Effort 25 Organization and Review Process Reviews by: –Project Advisory Committee J. – E. Augustin, Chair reports to ILCSC October 19-20, 2008 – May 9-10, 2009 –Accelerator Advisory Panel Bill Willis, Chair reports to Project Director, Barry Barish April 2009

Resource Issues for TDP-2 Best knowledge of ILC resource base in given in R&D Plan tables In many cases numbers are inclusive and reflect our ‘in-kind’ R&D contributions philosophy This is OK for current TDP-1 activities –Important to keep as large as possible R&D community linked to ILC GDE effort –Critical-path activities are covered (S0, e-cloud etc.) CFS may be notable exception

FTE Summary Snapshot of our resource tables –As of Release 3 –Will be updated in July “In-kind” R&D contributions –No direct control in many cases –(ART an exception) Typical per year total: –SCRF 155 –AS73 –CFS4 CFS sub-critical –Note does not include controls/LLRF

ART contribution to GDE is consistent and significant –But not dominant, overall Gradient  –approaching 35 MV/m Cryomodule test  –‘CM2’ and Global cryomodule Cryomodule ‘string test’ Electron cloud Beam Delivery – precision beam handling CF & S – value engineering Accelerator Design

The GDE TDP Program: Has a broad inter-regional basis Is based on a multi-lateral collaboration –Not centralized Relies on ‘in-kind’ R & D contributions from partner labs and regions –ILC project-specific –Other project-specific –Generic R & D Has adequate resources for TDP1 TDP2 planning now underway