Introduction To Earned Value November 14, 2002. Definition Earned Value is a method for measuring project performance. It compares the amount of work.

Slides:



Advertisements
Similar presentations
Project Cost Management
Advertisements

Connoizor Enabling Performance for Businesses through Software Website: Contact:
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
1 Chapter 7 Project Scheduling and Tracking. 2 Write it Down! SoftwareProjectPlan Project Scope EstimatesRisksSchedule Control strategy.
Monitoring and Control Earned Value Management (EVM)
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Microsoft Project 2002 Sessions 5-6. Entering Tasks During this first session we will enter a set of tasks that comprise building a shed – data sheet.
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Degree and Graduation Seminar Cost Management
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
HIT241 - COST MANAGEMENT Introduction
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Advanced Project Management Project Cost Management Ghazala Amin.
Chapter 10 Project Monitoring and Control
Project Management 6e..
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Chapter 15 Cost Control.
9-1 Project Management from Simple to Complex. 9-2 This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
1 Project Management – Unit 4 – Part 1 Cost Model ACWP: Actual cost of work performed: Actual costs in performing the work so far. BCWP: Budgeted cost.
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Project Cost Management
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Mohawk Vehicle - MOH-2 - F C EVM Quick-Look Report.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management 6e..
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Where Module 04 : Knowing Where the Project Is 1.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Schedule Control (Earned Value)
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Performance Measurement Baseline Contract Price (Project Price)
Project Monitoring
TOPIC-8B- PROJECT COST CONTROL
Budget Planning.
CHAPTER:7 Project Cost Management
Earned Value Management
Performance Measurement Baseline Contract Price (Project Price)
Project Cost Management
Progress and Performance Measurement and Evaluation
An Introduction to Earned Value Performance Measurement
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
5. Project PLAN & cost estimation
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Introduction To Earned Value November 14, 2002

Definition Earned Value is a method for measuring project performance. It compares the amount of work that was planned with what was actually accomplished to determine if cost and schedule performance is as planned. (PMBOK) In other words, its a way of determining for the money we spent, are we on budget and on schedule? EV is in Monetary terms $$$

The Basics BCWS –Budgeted Cost of Work Scheduled BCWP (also referred to as Earned Value) –Budgeted Cost of Work Performed ACWP –Actual Cost of Work Performed

BCWS Budget applied to tasks in a schedule Example –Task X Start Date 1/1/01 End date 2/28/01 Duration = 2 months –Task Y Start Date 2/1/01 End Date 2/28/01 Duration = 1 month –Task Z Start Date 3/1/01 End Date 3/31/01 Duration = 1 month

BCWS If resources were applied to each task and the cost of those resource worked out to : –Task X $100Task Y $100Task Z $100 –Then assuming an even distribution over the duration of the task, the budget would be : IncrementalTask(s)Cumulative –Jan $50 X$50 –Feb $150 X,Y$200 –Mar $100 Z$300

BCWP BCWP is how much work was accomplished Example: –At the end of January, we find that we are 25% complete with Task X BCWP for Task X =.25*$100=$25 –Task Y & Z have not started (and not scheduled to start), Therefore 0% complete – Incremental BCWP for Jan = $25 –Cumulative BCWP for end of Jan = $25

BCWP At the end of February, we find that we are 75% complete with Task X –BCWP for Task X =.75*$100=$75 BCWP for Feb for Task X = $75-$25 = $50 At end of February, Task Y is complete. –BCWP for Task Y = $100 At end of February, Task Z is 25% complete. –BCWP for Task Z =.25*$100=$25 Incremental BCWP for Feb = $175 ($ $25) Cumulative BCWP for end of Feb = $200

BCWP For end of February, the overall project is on schedule –Task X: BCWS = $100, BCWP = $75 –Task Y: BCWS = $100, BCWP = $100 –Task Z: BCWS = $0, BCWP = $25 Schedule Variance = BCWP - BCWS –Negative Schedule variance indicates behind schedule –Positive Schedule Variance indicates ahead of schedule

Schedule Variance For end of February, the overall project is on schedule, but the individual tasks are: Task X: BCWS = $100, BCWP = $75 $75 - $100 = -$25 BEHIND SCHEDULE Task Y: BCWS = $100, BCWP = $100 $100 - $100 = $0 ON SCHEDULE Task Z: BCWS = $0, BCWP = $25 $25 - $0 = +$25AHEAD OF SCHEDULE

Percent Complete Engineering Estimate Based on quantitative means such as number of programs coded 0 / 100 rule : receive 100% when task is complete 20 / 80 rule : receive 20% when you start a task, the other 80% when you complete 50 / 50 rule: 50% complete when you start an activity, the other 50% when you complete

ACWP ACWP is the actual cost spent to accomplish work –Labor $ (Salaries, Benefits, Overhead) –Other Direct Costs (Software costs, Hardware costs, Maintenance fees, License fees, Supplies) Example –At end of January, Task X has accumulated costs of $50

ACWP At end of February –Task X has accumulated costs of $150 –Task Y has accumulated costs of $150 –Task Z has accumulated costs of $10 –TOTAL ACWP = $310 (end of Feb.)

ACWP Overall, through the end of February, the project is over cost for the work that has been performed. –BCWP = $200 –ACWP = $310 Cost Variance = BCWP - ACWP –Negative Cost Variance indicates you spent more than you performed in $ –Positive Cost Variance indicates you spent less than you performed in $

Cost Variance At end of February –Task X BCWP = $75, ACWP = $150 –Task Y BCWP = $100, ACWP = $150 –Task Z BCWP = $25, ACWP = $10 –TOTAL BCWP = $200, ACWP = $310

Cost Variance At end of February –Task X BCWP = $75, ACWP = $150 CV = -$75, Over Cost –Task Y BCWP = $100, ACWP = $150 CV = -$50, Over Cost –Task Z BCWP = $25, ACWP = $10 CV = $15, Under Cost –Overall Project BCWP = $200, ACWP = $310 CV = -$110, Over Cost

Indexes Schedule Performance Index –BCWP / BCWS –Greater than 1 indicates ahead of schedule –Less than 1 indicates behind schedule –Examples: SPI =.75, means for $1 of work scheduled, you only performed $.75 of work. SPI = 1.25, means for $1 of work scheduled, you performed $1.25 of work.

Indexes Cost Performance Index –BCWP / ACWP –Greater than 1 indicates under cost –Less than 1 indicates over cost –Examples: CPI = 1.35, means for every $1 spent, you performed $1.35 of work CPI =.5, means for every $1 spent, you accomplished $.50 of work

Indexes End of January –BCWS = $50, BCWP = $25, ACWP = $50 –SPI = $25/$50 =.50 Behind Schedule –CPI = $25/$50 =.50 Over Budget End of February –BCWS = $200, BCWP = $200, ACWP = $310 –SPI = $200/$200 = 1 On Schedule –CPI = $200/$310 =.65 Over Budget

Indexes Typically don’t calculate these at Task level –How do you divide a number by zero when you perform work before it is scheduled? CPI can be used to project costs at completion.

Budget At Completion Total value of incremental BCWS. Should be total budget for project as allocated to the tasks to complete the project. If not all budget allocated to tasks, it is usually unallocated or held in reserve. It is however, still considered to be part of the budget at completion. This varies by application area.

Estimate At Completion Total cost to be incurred based on actual dollars spent to date + estimate to complete (ETC) (Latest Revised Estimate (LRE) = Estimate at Completion (EAC)) Calculation 1 °EAC = ACWP + (Remaining BCWS /CPI) °EAC = $310 + ( $400/.65) = $925 –Compare to BAC of $600. This infers that we will continue to work at same efficiency we’ve incurred to date.

Estimate At Completion Calculation 2 °EAC = BAC+CV °EAC = $600+$110 = $710 °This infers that we will work to plan from this point forward

Estimate to Complete Cost of remaining work –Formula based (BCWS/CPI) Beware of formulas using one or two data points –Engineering estimate SWAG Bottoms-Up detailed estimate –Straight remaining budget

Variance at Completion Difference between BAC and EAC –BAC - EAC = VAC –Positive is Good –Negative is bad

Earned Value Analysis Charts or reports are used to identify trends so that corrective action can occur –Project level or group of significant like tasks. –Cost/Schedule Status Report (C/SSR)or Cost Performance Report (CPR) Establishing parameters (% or $) on variances help management not overreact to natural aberrations. Project Manager wants to be able to explain unfavorable variances and actions taken to correct.

Corrective Actions? Schedule slippage for a specific task on the critical path or for the project as a whole. Cost overrun on a specific task on the critical path of for the project as a whole. Insufficient or inadequate resources Changes in scope that affect project cost or schedule Quality problems resulting in excessive rework Material shortages from suppliers Changes in customer or user requirements

Summary BCWS : Budgeted Cost of Work Scheduled BCWP : Budgeted Cost of Work Performed ACWP: Actual Cost of Work Performed SV: Schedule Variance: BCWP - BCWS –Negative is Bad, Positive is good CV: Cost Variance: BCWP - ACWP –Negative is bad, positive is good SPI: Schedule Performance Index: BCWP/BCWS –Greater than 1 is good, Less than 1 is bad

Summary CPI: Cost Performance Index: BCWP/ACWP –Greater than 1 is good, Less than 1 is bad BAC: Budget at Completion EAC (LRE): Estimate at Completion / Latest Revised Estimate VAC: variance at Completion: BAC - EAC –Negative is bad, positive is good ETC: Estimate To Complete