EDMS 888091 Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January 2008 1 ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

EDMS November th LHC Radiation Day RAMSES Induced Activity Monitors 5 th LHC Radiation Day CERN - 29 November 2005 RAMSES Induced Activity.
Radiation Protection aspects of the Switch-Yard operation V. Donate, G. Dumont, Joachim Vollaire on behalf of DGS-RP.
RAMSES Project Technical AspectsDPerrin RSOC September 17, 2003 RAMSES Project Status report - Technical aspects RAMSES Project Status report - Technical.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
1 / 24 CS 425/625 Software Engineering Software Evolution Based on Chapter 21 of the textbook [SE-8] Ian Sommerville, Software Engineering, 8 th Ed., Addison-Wesley,
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
ARCON/RAMSES: Current Status and Operational Risk D. Forkel-Wirth, G. Segura Milan, D. Perrin, S. Roesler; H. and Hz. Vincke, P. Vojtyla, M. Widorski (DGS,
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
SCADA and Telemetry Presented By:.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Workshop on the Use of Ethernet as a Fieldbus CERN, 28 September 2001 Use of Ethernet in the control systems of the cooling and ventilation infrastructure.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
RAMSES PROGRAMME F. SZONCSO CERN – DGS/DI 31 st March 2014 CERN – GREECE INDUSTRY day1.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
ST Workshop 1 April 2003P. Vojtyla - TIS/IE1/10 Interaction of TIS and ST in Environmental Matters P. Vojtyla TIS – Integrated Safety and Environment.
Over View of CENELC Standards for Signalling Applications
The DIAMON Project Monitoring and Diagnostics for the CERN Controls Infrastructure Pierre Charrue, Mark Buttner, Joel Lauener, Katarina Sigerud, Maciej.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
1 LHCC RRB SG 16 Sep P. Vande Vyvre CERN-PH On-line Computing M&O LHCC RRB SG 16 Sep 2004 P. Vande Vyvre CERN/PH for 4 LHC DAQ project leaders.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
EDMS July 2004 LHCb Experiment Area Meeting RAMSES at LHC point 8 LHCb Experiment Area Meeting 21 July 2004 RAMSES at LHC point 8 LHCb Experiment.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
TE-CRG Activities D. Delikaris, TE-CRG.
Radiation Protection computing tools Gérald Dumont HSE/RP.
BEAM INSTRUMENTATION GROUP DEPENDABILITY APPROACH CERN, Chamonix 26th January 2016 William Viganò
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
Inquiry about Radioactive Workshops & Storage needs A status report Presented by L.Bruno Checked by P.Carvalho-Correia, M.Hatch, P.Strubin, T.Wijnands.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
Status & Plans for WA105 Control System
R. Denz, A. Gomez Alonso, AT-MEL-PM
SNS Status Report Karen S. White 10/15/08.
The ILC Control Work Packages
CS 425/625 Software Engineering Software Evolution
Radiation Protection Handbook
Access Control for CERN Experimental Areas
Presentation transcript:

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23 January 2008 ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23 January 2008 D. Perrin (SC/RP) on behalf of the ARCON to RAMSES Bridge Joint working group SC and AB EDMS

Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Introduction Radiation monitoring The Safety Commission uses a radiation monitoring system to assess and to limit radiation risks as well as to control the release of radioactivity. The operation of accelerators involves beam losses, CERN has the legal obligation to protect the public and the people working on site from any unjustified exposure to ionising radiation ! this more than ever as machines operate at higher intensity.

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Content of the presentation The ARCON – RAMSES Bridge  ARCON overview  ARCON issues  ARCON risk analysis  RAMSES overview  The bridge  Resources for the bridge  Conclusion

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January  Monitoring radiation variables ( local and remote display ) Permanent real-time monitoring of ambient dose equivalent rates and ambient dose equivalents in the working environment (underground accessible areas, on the surface and in the environment) Permanent real-time measurement of radioactivity in released gases and fluids (radioactive nuclides) Permanent measurement of induced activity during accelerators stop/shutdown  Alarm functions (local and remote) Generate radiation alarms based on ambient dose equivalent rates and ambient dose equivalents Generate interlock signals  Long term permanent data logging Measured values with only 1 value per hour (average dose rate) Overview - Main functions The ARea CONtroller - ARCON

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Overview - Main features CERN development in the 80’s for LEP VME Bus (CPU 68040) OS9 (Operating system) MIL1553 (field bus) Up to 64 counting inputs (current pulses) Maximum distance 2 km (monitor to controller) Up to 60 status inputs Up to 64 status outputs Present radiation monitoring system of the PS complex and the SPS Main ARCON dates: : Commissioning at LEP to 1994: Deployment on rest of CERN : Diskless version – Ethernet link ARCON overview

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Present architecture ARCON overview 374 x 14 Beam interlocks

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Technologies and components ARCON overview VME chassis RP monitors Environmental monitors

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON Issues Ageing system and technologically obsolete  increase of breakdowns Lack of spare parts (include monitors for radiation and environmental protection) VME chassis not to CERN standard (difficult to maintain, electronic boards and components are no longer produced, ~ 20 years old) Microware OS9 no more supported Supervision system: no more maintenance from HP for HP10.20 operating system and hardware for HPSLZ18 server (not possible to migrate to a newer OS) MIL1553 (not fully compliant to standard, difficult to maintain, few experts) Applications difficult to maintain, no possible evolution (rely only on 1 expert) Not compliant with current standards for radiation protection instrumentation (auto diagnostic, safety integrity level) Loss of expertise (personnel retirements, documentation not up to date) Very manpower intensive system The availability and reliability of a radiation monitoring system for the PS and SPS complexes is of prime importance for the future operation of LHC

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Definitive unavailability of the ARCON monitoring system  risk score = 20/20 as of April 2009 Failure of a «critical monitor»*  Beams interruption  risk score = 15/20 when there are no more spare parts Failure of electronic boards of ARCON controllers  risk score = 10/20 when there are no more spare parts Failure of an environmental monitor  risk score = 8/20 there are no more spare parts ! Software failure  risk score = 8/20 Result of the analysis Result of the analysis [R1] ARCON Risk Analysis * Monitor which breakdown involves the interruption of the circulating beams in the zone concerned Risk Analysis performed according to the methodology prescribed in the Executive Management Directive related to the CERN Risk Management System (EDMS )

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January RAMSES overview RAMSES provides CNGS and has started to provide the LHC with an integrated RAdiation Monitoring System for the Environment and Safety covering acquisition, transmission, logging and display for the LHC in it’s entirety (machine, experiments and experimental areas). RAMSES provides CNGS and has started to provide the LHC with an integrated RAdiation Monitoring System for the Environment and Safety covering acquisition, transmission, logging and display for the LHC in it’s entirety (machine, experiments and experimental areas). The system is already incorporated into the CERN Control Center for accelerators and will soon be available within the experimental control rooms. The system is already incorporated into the CERN Control Center for accelerators and will soon be available within the experimental control rooms. Other CERN machines and experimental areas were taken into consideration within the technical specification for future usage and expansion of the system. RAMSES was at the beginning planned for all CERN facilities, however for budget reason the implementation was restricted to LHC. Other CERN machines and experimental areas were taken into consideration within the technical specification for future usage and expansion of the system. RAMSES was at the beginning planned for all CERN facilities, however for budget reason the implementation was restricted to LHC.

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January  Monitoring radiation variables ( local and remote display ) Idem as the ARCON (slide 4)  Alarm functions (local and remote) Generate radiation alarms based on ambient dose equivalent rates and ambient dose equivalents (SIL-2 for local alarm) Generate interlock signals (SIL-2) Generate technical alarms (failsafe system)  Long term permanent and reliable data logging Measured values (according to measuring time, 1s to 3600s, 0.1s steps) Events (radiation alarms, interlocks, system fault alarms, technical alarms) System configuration (historic of changes) Main functions RAMSES overview Application of the IEC standard for the overall project management Compliant to applicable international standards for RP instrumentation

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January The ARCON – RAMSES Bridge As it is URGENT to take action an intermediate solution has been worked out, the bridge, consisting in 3 subprojects (SP) : Improving the availability of spare parts (SP-1)Improving the availability of spare parts (SP-1) Migrating ARCON supervisory system to RAMSES (SP-2)Migrating ARCON supervisory system to RAMSES (SP-2) Extending the RAMSES to replace critical monitors (SP-3)Extending the RAMSES to replace critical monitors (SP-3) How to prevent potential stoppage of CERN accelerators including LHC in the coming years due to ARCON unavailability? Ideal solution  Replace the ARCON by RAMSES  RAMSES II project This was the “raison d’être” of the joint working group SC and AB formed in mid 2007 But not possible due to years for implementation

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January SP-1: Improving the availability of spare parts The Bridge Beam interlocks Oracle

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January SP-2: ARCON – RAMSES interface The Bridge Beam interlocks

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January SP-3: Limited RAMSES deployment The Bridge In the meantime, before the installation of the RAMSES monitors, RP will set up compensatory measures to ensure the safety

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Implementation planning SP-1 The Bridge

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Implementation planning SP-2 The Bridge

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Implementation planning SP-3 The Bridge

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Materiel : 2.35 MCHF ( ) - Monitors procurement (SP-1 and SP-3) - Software development (SP-2) Manpower * : 1.4 MCHF (~3 persons.years 2 ½ years) Total cost: 3.75 MCHF Estimated Resources The Bridge * Qualified and experienced personnel

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January Conclusion The ARCON to RAMSES Bridge  Intermediate solution that allows:  ARCON to continue the radiation monitoring of CERN’s accelerators and experimental areas,  To conceive an advanced monitoring system (within the RAMSES framework) and to install it.  The bridge will increase the ARCON reliability and reduce its MTTR (Mean Time To Repair),  The bridge will have paved the way, preparing for the transfer towards RAMSES (RAMSES II project),  ~ 1 MCHF of the bridge cost is recoverable for the RAMSES II project (both hardware and software).  Urgent actions must be taken using the existing RAMSES contract, which include;  Organisation of contractual and financial aspects within CERN.  Organisation with contractors and 3rd parties for the supply of monitors and equipment.

EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January THANKSfor your attention THANKSfor The ARCON to RAMSES Bridge “ Ce Bridge constitue la première phase d’un programme de remplacement complet du système de surveillance radiologique du complexe PS et du SPS, Projet RAMSES II ” References: [R1] SC and AB joint working group,, EDMS (2007) [R1] SC and AB joint working group, Fiabilisation et remplacement partiel du système de monitoring radiation du complexe PS et du SPS, EDMS (2007) EDMS