October 14, 2008 C. Hauviller 1 Review of the mock-up’s C. Hauviller.

Slides:



Advertisements
Similar presentations
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
Advertisements

Collaboration K. Artoos, CTC 8th February 2011 Active Structures Laboratory Department of Mechanical Engineering and Robotics Université Libre de Bruxelles.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
CLIC stabilisation contribution A.Jeremie, B.Caron, A.Badel, R.LeBreton, J.Lottin, G.Balik, J.P.Baud, L.Brunetti, G.Deleglise, S.Vilalte.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
ILC Rotating Target - Active Sliding Contact Cooling Wei Gai, Manoel Conde, Wanming Liu, Scott Doran, Vic Guarino, George Fenske (ES), Robert Erck (ES),
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Our way to the CLIC CDR 1.Definition of CDR and TDR 2.CLIC feasibility items 3.Organization of technical preparation - CTC (=CLIC technical committee)
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
STABILIZATION ACHIEVEMENTS AND PLANS FOR TDR PHASE CLIC MAIN BEAM QUADRUPOLE MECHANICAL STABILIZATION K. Artoos, C. Collette, P. Fernandez Carmona, M.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
Possible technical implementation, R&D program until 2010 C. Hauviller CERN Feasibility item 6: Main Linac active alignment/beam based feedback/stabilization.
Our way to the CLIC CDR 1.Basic Concepts of the CLIC CDR Present layout of the CDR chapters 2.Possible Time Scale 3.Organization of technical preparation.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
TBTS Test Program & Schedule G. Riddone
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
Beam Physics Issues of Main Beam Stabilisation A.Jeremie (LAPP) C.Hauviller (CERN)
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
CLEX constraints between the 2 linacs CLIC meeting 18 March 2015 Vivien RUDE Contents : (Alignment in the CLEX) Lab constraints CLEX constraints.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
FP7: EuCARD after a year of preparation… A.Jeremie.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
Claudia Dias Vacuum, Surfaces & Coatings Group Technology Department Claudia Dias CERN, Technology Department Vacuum, Surfaces and Coatings Group 2 |
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
O. Kester, NuSTAR annual meeting, 27/02/2013
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
Résumé de CLIC’08. J.P.Delahaye CLIC Status & work program (14 – 10 – 08) 2 2EPAC 2008 CLIC / CTF3 G.Geschonke, CERN Helsinki Institute of Physics (Finland)
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
CLIC Parameter Working Group Two Beam Module Design
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
CLIC module working group
Vertex Detector Mechanical R&D Design Questions and Issues
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
CLIC-ILC BDS & MDI work.
A.Jeremie Some drawings from different CLIC’08 presentations
MicroMegas Mechanical Meeting --- Cern April 2014
ATF2 review R. Tomas ATF2 review web:
HIE-LINAC status report
Presentation transcript:

October 14, 2008 C. Hauviller 1 Review of the mock-up’s C. Hauviller

October 14, 2008C. Hauviller2 Points to be treated  Which mock-ups? Main beam, final focus, dedicated to an accelerator  Breakdown of work and planning  Advancement

October 14, 2008C. Hauviller3 Which mock-ups? Extracts from the List of Actions March 18, 2008 – –Overall design   Linac (a demonstrator mock-up will have to be carried out by June 2010 – see action at the end of the list) …   Final focus (no dedicated mock-up for FF will be done - special features to be integrated in the Linac mock-up) – –Integration of all the final focus features: types of supporting structures, coupling with vertex detector, forward detectors,… (LaVista) – –Integrate and apply to linac (LAPP, OXFORD, CERN, PSI (to be contacted by AJ)):   A mock-up should be ready to provide results by June 2010 with several types of sensors including interferometers (intermediate milestones to be defined accordingly). The mock-up should perform better than required for main linac in order to “provide evidence” for final focus requirements.   Mock-up to be integrated in CLEX (important to have the stabilization together with the alignment) or in other accelerators (Labs to be contacted by HS)

October 14, 2008C. Hauviller4 Mock-up’s June 10  Functionalities –Demonstrate stabilization in operation:  Magnet powered, Cooling operating  Configurations –1- Stand-alone, –2- Integrated in Module, –3- Interconnected  Accelerator environment  Parts / Measuring devices –Support –Pre-alignment –Stabilization –Magnet –Vacuum chamber and BPM –Independent measurement  Critical items to-date –Specific magnet design and manufacturing. Vibrations –Cooling. Specific mock-up. –…