PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)

Slides:



Advertisements
Similar presentations
Solar-B EIS Preliminary Design Review 6-7 July 2000 CCD Camera Design Chris McFee Mullard Space Science Laboratory.
Advertisements

EIS/Solar-B: EIS information that was sent to System Side EIS subsystems: EIS consists of three EIS subsystems. (a) STR: Structure, (b) HAR: Harness, (c)
Slide 1 MIPA Progress Presentation For SERENA Progress meeting, Santa Fee, May 2008 Prepared by Johan Svensson and Stas Barabash.
Plato at ASI Tues 05/May/09Dave Walton Plato meeting Rome Tues 5/May/09 Focal Plane Dave Walton UCL/MSSL, + Leicester University Miguel Mas INTA/CAB +
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Titre du document + date Arial 8  à modifier dans le masque (Affichage/Masque/Masque des diapositives) CNES – 9 Décembre 2013 Karine MERCIER SVOM ECLAIRs.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
MOSAIC focal plane leveling V. Velur Caltech Optical Observatories 01/22/2008 1Caltech Optical Observatories (01/22/2008)
CIRSGSFC April 2004 dej-1 CIRS Instrument Overview CIRS Team Meeting Observatoire de Paris - Meudon April 26 – CIRS Instrument Group presented.
PRIMA Star Separators Françoise Delplancke, Frédéric Derie TNO-TPD team (Jan Niejenhuis)
Herschel / HIFI 1.Status mirrors FM/FS 2.Status COA QM 3.Status COA FM 4.Financial situation COA FM 5.Status MSA FM/FS.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
SDW2005, juin, Taormina The Corot Space instrument.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Space Frame Structures for SNAP Bruce C. Bigelow University of Michigan Department of Physics 11/04/04.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
1st Eddington Workshop. Córdoba, June 14th, 2001 J. Miguel Mas-Hesse 1 EddiCam: The Eddington Photometric Camera Preliminary design.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
Work to Date Analysis Work –Random Vibration Analysis of RICH2 Structure PSD data from LEP Tunnel (Including affect of large ventilation system) Excitations.
EuCARD WP 7 – High Field Magnets Task 7.2 – Support Study Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task 7.2 – Support Study.
P. Earle p1 November 16, 2001Electrical SNAP Electrical Design Estimates November 16, 2001 C. Paul Earle Super Nova/Acceleration Probe.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
PLATO Main Electronics Units (MEU) based on inputs from P. Plasson and the system team J. Miguel Mas-Hesse Centro de Astrobiología (CSIC-INTA)
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Plato meeting MSSL Wed+Thur 15+16/Oct/08 UK interests/activities Alan Smith and Dave Walton UCL/MSSL.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Opto-Mechanics for SNAP at UM
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
GE+ PL INTERFACES, RESSOURCES PLATO PPLC/ESA meeting, Feb 27th 2009.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
Réunion de présentation des besoins 10 Nov Joël MICHAUD French expertise in SiC for large telescopes.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
1 SXC on SXG Aim: basic agreement about this SXC on SXG by the end of September (formalities may come later) Clarify key technological items Thermal environment.
Thermal Noise performance of advanced gravitational wave detector suspensions Alan Cumming, on behalf of the University of Glasgow Suspension Team 5 th.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Jeff Bolognese p1 Super Nova/Acceleration Probe 16 November 2001 Structural Analysis Jeff Bolognese 16 November 2001.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
Extended Detector Cutoff Considerations WFIRST Project Office May
September 30th, 2008 Patrick Levacher. Plato Instrument System Group.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Another Modular Focal Plane: Part 1 – Sub-modules Bruce C. Bigelow University of Michigan Department of Physics 5/17/04.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
1 Performance of a CCD tracker at room temperature T. Tsukamoto (Saga Univ.) T. Kuniya, H. Watanabe (Saga Univ.); A. Miyamoto, Y. Sugimoto (KEK); S. Takahashi,
AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module.
Plato Consortium Kickoff Meeting, Paris 1 09-Nov-2010 Plato CCD and Front-End Electronics Dave Walton UCL/MSSL
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
Pierre Barroca ITK LAPP – Goals 2.Simulation 3.Prototype measurements 4.Setup 5.Results 6.Conclusions 1.Goals 2.Simulation 3.Prototype measurements.
E. Majorana (INFN – Rome) ELiTES 3 rd General Meeting Hongo Campus – Tokyo – 9-10 Feb., 2015 Cryogenic platform with vertical suspension: a practical approach.
FSP progress update & camera concept Contents: Mechanical structure System components CCD sensor and circuit examples Hybrid concept IIC concept and tasks.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
PANDA, GSI, Electrically Cooled Ge-Detectors development Status Report I. Kojouharov.
PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues
Flexible lines production and planning
Status of different Parts Budget Summary
Engineering Design Process
GLAST Large Area Telescope
Engineering Design Process
Another Modular Focal Plane: Part 2 – FP assembly
Standardized CCD and MCT detector mounting configurations
UPPSALA UNIVERSITY_GERSEMI PROJECT
CHEOPS - CHaracterizing ExOPlanet Satellite
Progress on cryostat design and production
Presentation transcript:

PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)

PLATO Kick off meeting November 2010Roser Urqui2  FPA design present status  FPA development planning  Drivers:  High rigidity and mechanical stability  Low mass (32+2 units are needed!)  CCD temperature <-70 C, with passive cooling PLATO Focal Plane Assemblies (FPA)

PLATO Kick off meeting November 2010  A preliminary design has been produced  Design is mainly driven by interface constraints and budgets  Design refinement still on-going CCD (4x) Thermal Strap (4x) Flexi (4x) Support Ring Mask Baseplate Thermal Strap Clamp (4x) FPA design 3Roser Urqui

PLATO Kick off meeting November 2010 FPA design 4Roser Urqui FPA TOU

PLATO Kick off meeting November 2010 FPA design 5Roser Urqui CCDs (detector side, 4x) Thermal Straps (4x) Support Ring Mask

PLATO Kick off meeting November 2010 FPA design 6Roser Urqui Baseplate Thermal Strap Clamps (4x) CCD packages back side (4x)

PLATO Kick off meeting November 2010 FPA design 7Roser Urqui Support Ring Flexies (4x)

PLATO Kick off meeting November 2010  Current design is close to fulfill all requirements –First eigenfrequency 255 Hz (> 300 Hz) Margin still available to increase the frequency. –Mass (including 4xCCDs - 180g each) 1.49 Kg(< 1.6 Kg) If CCDs mass ~ 225 g, ~1.69 Kg –CCD Temperature <-73 ºC(<-70 ºC) –Only NORMAL FPAs considered up to now.  Interfaces –CCD-FPA Interface has already been agreed –FPA-TOU I/F still open Current interface would impose a weird design. Trade off in progress. FPA status 8Roser Urqui

PLATO Kick off meeting November 2010Roser Urqui9 Next steps  Design Refinement until late November –Further Mass reduction –Adapt to updated Requirements and Interfaces  Mock-Up Start of Manufacturing mid December –After CDR/MRR  Mock-Up Delivery mid March  No delays are foreseen