EDM Assembly and Commissioning – or – How to Cut Two Years from the Project P. Huffman and V. Cianciolo.

Slides:



Advertisements
Similar presentations
SCU Development at LBNL Soren Prestemon Lawrence Berkeley National Laboratory Superconducting Undulator R&D Review Jan. 31, 2014.
Advertisements

1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Muon g-2 Inflector AEM Meeting 11/25/2013 Chris Polly Muon g-2 Project Manager.
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
HESSI’s Imaging Process. The HESSI satellite, due for launch in the Fall of 2001, ha.
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
A Muon Veto for the Ultra Cold Neutron Asymmetry Experiment Vince Bagnulo with Dr. Jeff Martin Electrons Ultra Cold Neutrons Cosmic Ray Muons Protons Pions.
UCNA specs – JWM 9/4/7 Proton beam energy = 800 MeV Peak proton current = 40 uA Duty cycle = 1/10 (1 sec on, 10 sec off) Therefore time-averaged current.
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
Russ Rucinski, FNAL, Oct. 8, MICE Cryostat Status 1.Prototype cryostat A. Status & Plans B. Parts C. Operating data (supplemental) 2.Four final cryostats.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Takeyasu Ito University of Tennessee EDM Collaboration meeting December, 2004 Cost and Schedule Estimate WBS 2.5- Neutron beam polarizer/splitter for SNS.
NEUTRON EDM Philip Harris, on behalf of the CryoEDM collaboration: Rutherford Appleton Laboratory University of Oxford University of Sussex ILL University.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Collab 4/15/04 #1 EDMEDM Funding the Project Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Raleigh, NC March 3, 2006.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
Alpha Magnetic Spectrometer. A particle physics experiment module that is to be mounted on the International Space Station. A particle physicsInternational.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
MICE Target - Risk Lara Howlett University of Sheffield.
1 Tunnel implementations (laser straight) Central Injector complex.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
EDMEDM EDM Fast Start, May 23, 2006He3S, Steven Williamson EDM Fast Start Helium-3 Services (He3S) Steven Williamson May 23, 2006.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
EDMEDM EDM Collaboration Meeting Project Management Fast Start Summary Prepared by: John P. Tapia May 25, 2006.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
TD Designs for mu2e Solenoid Magnets Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. All Experimenters’ Meeting January 25, 2010.
P25 Interface 5/19/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Subsystem Managers Duke University,
Office of Nuclear Physics Response 12/14/06 #1 Response to the CD-1 Review Report Martin Cooper Los Alamos.
1 How Can We Get More Neutrons? Upgrade Paths for the EDM Geoff Greene University of Tennessee /Oak Ridge National Laboratory Oct 2006.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Takeyasu Ito University of Tennessee/Oak Ridge National Laboratory EDM Cost and Schedule Review February, 2005 Beam Splitter / State Selector, Polarizing.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Engineering Approach EDM Collaboration Meeting 2-07 Jan Boissevain.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
P25 Business 2/8/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration ASU, Tempe, AZ February.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
LBNE Remote Handling Conceptual Design Issues for ORNL Collaboration Kick-off Meeting at ORNL 1/6/2010.
LANL Cost and Schedule Review 02/11/05 1 Cryostat (lower half) WBS 3.1, 3.5, 3.6, 3.7, 3.8, 3.10 Paul Huffman, Chris O’Shaughnessy North Carolina State.
December 18, Topics & Presenters: Magnet Overview J. Haggerty Magnet Testing in bldg 912 M. Anerella Modification to ChimneyP. Kovach Cryogenics.
Office of Nuclear Physics R&D 12/14/06 #1 Risk Based R&D Plan Martin Cooper Los Alamos.
Testing throughout Lifecycle Ljudmilla Karu. Verification and validation (V&V) Verification is defined as the process of evaluating a system or component.
Specifications for the Integrated Tests II Paul Huffman.
Very Crude Background Estimation Takeyasu Ito Los Alamos National Laboratory.
Collaboration Business
MNS - Mission need statement
Computer tools for Scheduling
Update of experimental hall in Japanese mountain site
CTOF Installation.
The NPDGamma Experiment at the SNS FnPB
BDS civil construction Single IR upgrade scenarios discussion
NRL NRL - Welcome to the NRL Sales Training Program
General Assembly Meeting
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRK Sales Training Program
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
NRL NRL - Welcome to the NRL Sales Training Program
Presentation transcript:

EDM Assembly and Commissioning – or – How to Cut Two Years from the Project P. Huffman and V. Cianciolo

Quick Answer Decouple installation of the shields from installation of the cryostat in the FNPB. –Previously assumed that bottom of shields needed to be installed prior to cryostat. –If they can be slid under the cryostat along the beam axis then the shields can be made and tested in parallel with cryostat commissioning. Cut off the project after the last subsystem (3He) is installed in the cryostat. –Pushes a significant amount of commissioning onto operations. –Requires modification of the CD4 requirements since as previously constructed they required much of that commissioning to be complete. –In our schedule the shields and coil package is at CIT at CD-4. We need to develop crisp arguments why this is a good idea.

Neutron lifetime of 300 sec, required polarization to be seen in SQUID w/ S/N=1 in 10 Hz BW. 1 in 10^11 ?? 5 kV/cm for 1 cycle (?) minimum required to have an interesting measurement. 4 pe/MeV for an alpha source - Minimum required to have an interesting measurement. 100 µφ/sqrt(Hz) S/N =1 w/ 10 Hz BW Demonstrate that central detector volume cools to 500 mK. /B0 < 10-5/cm over fiducial volume: required to make interesting measurement. Operated with coil package in place. Shielding factor 10-4: minimum spec Flux out/mW = 8.9 A, 0.1n/cc minimum spec Polarization = 70%

Is this “too many” CD4 Requirements? For FNPB we had 18. I wanted to emphasize the value of ensuring that these are achievable…

Why are the Shields/Coils at CIT when we Reach CD4? And is this OK? When we reach CD4 the shields will be fully tested w/o the cryostat. –We may want to install the shields around a mock-up of the cryostat to ensure mechanical compatibility. –Are there other major problems we could miss by not testing the shields and cryostat together? If we keep them at CIT we could perform additional measurements on the coil package. Necessary? Desired? If we move them to ORNL they will need to a) stay in boxes, b) be installed some place other than their final location, or c) installed in their final location. a)No obvious benefit accrues from this option. b)No obvious benefit accrues from this option and there is an increased risk of damaging the shields. c)This option has some benefits, but will extend the project and increases the risk of damaging the shields.

What Do We Save? $701k Assembly + Commissioning $591k Project Office –Only ballpark – needs to have correct contingencies, inflation, etc. applied. Technicians may cost more: –7 NCSU tech years on revised project. –NCSU: $110k/yr –ORNL: $215k/year –Three options (require Martin, Geoff, Glenn, Gene, Jehanne, Chris, etc. to negotiate) Techs all at ORNL –Lose $735k of $1292k savings Make 1 tech NCSU, stationed at ORNL. –Lose $368k of $1292k savings. Make 1 tech NCSU, stationed at ORNL, have ½ a tech paid by FNPB operations (i.e., free), ½ a tech at ORNL rates. –Save an additional $8k