Athenahealth’s ‘master plan’ drawing showing mockup of an office annex on the south side of the existing garage.

Slides:



Advertisements
Similar presentations
I Can Draw A Map.
Advertisements

Flat Stanley found out he had brothers all over the United States. Here is the information he has. Read the question and use the chart below. Then write.
Muskegon County New Jail Facility and Juvenile Transition Center Presentation to JJTCC, September 5, 2013.
Example of an Appropriate Development Concept for the Hine Junior High School Site This concept is an example of how the site could be developed for the.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Free house located at 130 W. Sheboygan Street, Campbellsport, WI.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
City of Waynesboro Entrance Corridor Design Guidelines.
Financial Considerations; Determining Developer’s ROI in Downtown Palmetto Bay 223 k 185 k 189 k 280k 168 k 218k 248k 196k 197k 216k 227k 236k 255k 235k.
Elevations.
Blue Prints.
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
Chapter 3 Lesson 13 TCAP Coach
Aim: How can we distinguish between a vector and scalar quantity? Do Now: What is the distance from A to B? Describe how a helicopter would know how to.
Phillips Ave. Fire Station. The Fire Station: Phillips Ave. Fire Station RFP to be issued  Retain Historic Building  Allow Residential Use – Single.
Unit 4: Conventional signs, sketch maps and plans A. What are conventional signs? Conventional signs  Represent different features on a map  Designed.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
COLCHESTER’S FRANCISCAN PRIORY A RECONSTRUCTION OF THE MEDIEVAL LAYOUT John Ashdown-Hill.
City Of Pickering Trophy Site –Vastly Undervalued Properties Presentation to Dr. A. Damji.
World Trade Centre Collapse Group 17 Valerie Scott Dan Kennedy.
All About Maps Beth Clause. How Firefighters Use Maps.
Historic Review Board Continued Public Hearing: DR – th St. October 20, 2015.
Flood of At Dam Looking East Over Lake. Flood of At Dam Looking Northeast.
Pythagorean Theorem What’s the Angle?. A Little Story Time...
1 Item W9a (Ruffalo) Coastal Commission March 7-9, 2012 Hearing.
1 Upper West Side/Central Park West Historic District Protective Mechanisms R8-B Contextual Zoning Districts W. 70 th Street midblock – north side Upper.
Spot Heights from Contours. Why do you need to know As builders you may do this a few times but it is more likely your regular encounter with contour.
Chapter 13 Site Orientation.
SITE/PLOT PLANS APPLICATIONS OF TECHNOLOGY. DESIGNING A BUILDING ON A SITE Architects must consider the following about a site when designing a building.
Historic Review Board Public Hearing: DR – th St. September 15, 2015.
COMMUNITY BOARD 4 Landmarks Committee Potential Hell’s Kitchen Landmarks December 6, 2008.
University of Toronto Mississauga Campus Update to the UTM 2000 Master Plan University of Toronto Mississauga Campus: UTM Master Plan Update Campus and.
2803 Dundas Street West Avenue Segment Study. Presentation Outline 1.Study Area and Proposal 2.Policy Context 3.Character Area Response Statement 4.Precedent.
Excerpts from North Loop Neighborhood Plan. The intersection of Airport Boulevard and 51st Street is seen as one of the most important in the neighborhood.
STORED ENERGY Wood is stored chemical energy until it is burned and the potential energy is released. A ball held above the ground has potential energy.
Staff Presentation to the Portland Design Commission June 2, 2016 CITY OF PORTLAND, OREGON 1st Design Review Hearing DZM Block 20 Residential.
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU DZ Arthouse.
1 Villa Laguna MXD3 Site Plan Review. 2 Request: The applicant is requesting site plan review of a proposed mixed-use project pursuant to the recently.
Hillside Development Permit 09-38
253 South Los Robles Avenue Predevelopment Plan Review
CFT Gateway Center ( E. Foothill Blvd
Residential Building Height Standards
Vectors Scalars and Vectors:
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
INCLUSIVE | SUSTAINABLE | VIBRANT
Sneed Property th Ave E, Puyallup Exterior of House
10/6/11 BR: ______ is like Madison Ave. ____ is like State St
How to use Latitude & Longitude
Vectors Scalars and Vectors:
West Jordan Garage Door Repair
INDOOR BASEBALL / SOFTBALL FACILITY
83 North Lake Avenue Predevelopment Plan Review
Proposed “a” Overlay Impacts Almost All Inner Residential Neighborhoods East of the Willamette River. Now Includes Properties East of I-205 R5 = 5,000.
The Secret Annexe A Visual Walkthrough.
Potential and Kinetic Energy
Potential Energy.
South 6th Street 6th Avenue 5th Avenue
Mathematics Unit 45: Twisted Building
Jeopardy Final Jeopardy Polaris Profiles Latitude/long $100 $100 $100
City Council Meeting April 29, 2019
REPOPULATING DOWNTOWN LUBBOCK
I Can Draw A Map.
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
115-Unit Mixed-Use Project (711 E
Nomination 802 N Monroe St Jenkins Building
How to use Latitude & Longitude
City of Edinburgh Council Transport & Environment Convener
Presentation transcript:

Athenahealth’s ‘master plan’ drawing showing mockup of an office annex on the south side of the existing garage

Athenahealth’s presentation of mockup of garage annex, at same height as garage

Athenahealth proposes to allow the height of this annex to be up to 20’ above the garage (in a single story), with a possible 15’ additional height if the structure “promote sustainable practices”. Athenahealth also proposes that this structure’s setback from North Beacon Street may be as little as 25’.

Existing garage seen from North Beacon St. going East

This is a rough mockup of the potential mass and height of a garage annex two storeys higher than the garage, with a 25’ setback from North Beacon St.