19th January 2012 Don Wells (Hess)

Slides:



Advertisements
Similar presentations
. . . a step-by-step guide to world-class internal auditing
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Transition from Q1- 8th to Q1- 9th edition
Don Wells Hess Corporation
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
Don Wells Hess Corporation
Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
M ORAGA H ILLSIDES AND R IDGELINES P ROJECT T OWN C OUNCIL M EETING, M ARCH 11, 2015.
SECURITY SIG IN MTS 28 TH JANUARY 2015 PROGRESS REPORT Fraunhofer FOKUS.
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
Software Verification and Validation (V&V) By Roger U. Fujii Presented by Donovan Faustino.
ASR Recognition Team Phase 1 Recommendations. Agenda Recognition Team Introductions Team Timeline Phase 1 Recommendations Future of Recognition Team.
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
ToR of GEOSAF2 WG on Operational Safety Review of WG2.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
TPC Meeting | April 30 – May 1, 2014GAMA | Washington, DC E. Restructuring of Airworthiness Standards - Status of Part 23 & ASTM Standards - Strategy for.
API Subcommittee 17 Industry Standards for Subsea Equipment
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 May 7, 2015.
© Chevron 2013 D EEP S TAR ® A Global Deepwater R&D Consortium Task Report Update: DeepStar Study AUV Interface Standards for Deepwater Fields Reporting.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
© Blackboard, Inc. All rights reserved. Back to the Feature: An Agile, User-centric Software Development Lifecycle Cindy Barry Senior Product Manager Martha.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
City of Watsonville Climate Action Plan and Carbon Fund Project Technical Advisory Committee Meeting #7 Final Meeting April 9, 2014.
Ajaz S. Hussain, Ph.D. Deputy Director Office of Pharmaceutical Science, CDER, FDA ACPS Subcommittee on Manufacturing Science: Identification and Prioritization.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
Common Activities Activities and Tasks in the WBS.
Don Wells Hess Corporation
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
Quality Assurance and Quality Improvement.  Standard Pathway - Required for all institutions granted initial accreditation, institutions in significant.
PER15K Protocols for Equipment Rated Greater Than 15,000 PSI ECS Report
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
Project management Topic 4 Business Case.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
API 17N Subsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
International Atomic Energy Agency Meeting Summary Technical meeting of the International Project on Demonstration of Operational and Long-Term Safety.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
Association of Enterprise Architects International Committee on Enterprise Architecture Standards Jan 23, Collaborative Expedition Workshop #57aeajournal.org.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
21 September 2004, Roodeplaat Sub-Directorate: Systems Analysis Directorate: Planning Systems Socio-Economic & Supporting Water Resource Planning Systems.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Jürgen Großmann, Fraunhofer FOKUS
API SC19 HPHT Template (Proposed as SC19TR1)
Computerized Systems in Clinical Research
Task Group Status January ,11, 2017
API SC 10, Work Group 3 Update:
Updates from SC18 Summer Meeting
Business Practices Subcommittee Update
API RP 17A - Discussion Points
API 17Q – Subsea Equipment Qualification
Status Update on API 16Q / 16R / 16F
API 14H Task Group Status Proper Classification of Document
First 8 slides are what was presented in San Fransisco…
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API SC 10, Work Group 3 Update:
Don Wells Hess Corporation
Executive Order No. 23 Update Air & Waste Management Association Conference November 16, 2018 Presentation will focus on the latest policy development.
PSS verification and validation
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Workshop: Equipment June 29, 2006.
Project Name Here Kick-off Date
Presentation transcript:

19th January 2012 Don Wells (Hess) API RP 17N Subsea Production System Reliability and Technical Risk Management & Integrity Management 19th January 2012 Don Wells (Hess)

Agenda Introduction Scope Membership General Progress Detail Progress Integration 17 Committee/ISO

Introduction Incorporate Integrity Management into current API 17N …Subsea Reliability and Technical Risk Management Recognize and incorporate integration with other Industry initiatives Incorporate updates based on feedback from using existing 17N document Respond to recent industry experiences

Scope Review of Summer Meeting topics Continue previously presented scope Additional scope – API 17A requirements Design and Operations of Subsea Production Systems Greenfield Brownfield Future requirements

Membership Room for additional membership Organized into subcommittees Design and Decommission Manufacture, Assembly, SIT, Installation, Commissioning Operations Technology Qualification Regulations Room for additional membership Opportunity to Make a Difference

General Progress 2010 – 2011 2012 - Planned Storming and forming - Complete Gap Analysis – Mostly Complete Interfacing with Runar Østebø – Statoil & convener of ISO/TC67 WG4 2012 - Planned Define Tone (prescriptive / recommend) Work the Gaps Work the Interfaces Industry Peer Assist Workshop SURF IM Forum

Detail Progress Define Scope - Completed Define Charter – Completed Divide and Conquer Design and Decommission New Key Process (KP) for Through Life to be Developed Does API want Risk Based or Safety Case Approach? (Hybrid?) Do we want/need to meet with BSEE to discuss? don’t have all the answers yet. We are working it and this is a representation of where we are. Storm and Form approach has been taken

Detail Progress Divide and Conquer Manufacture, Assembly, SIT, Installation, Commissioning Matrix Developed Where & How to test being worked Does Verification and Validation need new KP? (Rewrite KP06?) MOC being worked don’t have all the answers yet. We are working it and this is a representation of where we are. Storm and Form approach has been taken

Detail Progress Divide and Conquer – cont. Operations Reviewed and Raised issues with existing 12 KPs Proposed 3 additional KPs Field Modifications Inspection and Monitoring Remedial Intervention Added 3 Processes to “Project Phase Guide to Processes”

Detail Progress Divide and Conquer – cont. Technology Qualification New Risks Identified Obsolescence – Misuse of TRLs New Technologies New materials Keep integrated as a section in API 17N If not, make it a Technical Reference Make Generic vs. Prescriptive Robust, Goal Based with examples Utilize DNV RP A-203 as much as possible Evaluate the use in early conceptual phase Survey Industry to ID Qualifying Technologies main challenges

Detail Progress Divide and Conquer – cont. Regulations Managing Committees 1-4 Interfaces Will lead Prescriptive vs. Recommend discussions On hold until more definition / decisions from other committees

Path Forward Path Forward Write Review Ballot Continue Subcommittee work Outline of Process to use as QA tool Common Matrix to combine / review completed work Work the idea of using SURF IM Forum to discuss with industry and gather additional input Write Review Ballot

Interface / Integration API 17A, API Q1 ISO 14224 - Collection and exchange of reliability and maintenance data for equipment 20815 - Production assurance and reliability management 15663 - Life Cycle Costing TR 12489 - Reliability modeling and calculation of safety systems Review committee draft document Feedback 17N specific comments DNV RP A203/API RP 17Q?