ECAL Off detector Electronics Workshop Lisbon April 7-8 2005 T. Camporesi ECAL activity sites 2005 Integration (now) 904 (now) Cosmic ray calibration (May)

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
B. IlleWACH /11/20021 WELCOME to WACH I am happy to introduce this ‘Workshop Analysis Calorimetry H4’ dedicated to M0’ data analysis and the.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Status of NA62 straw electronics Webs Covers Services Readout.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
DOE Review Adi Bornheim California Institute of Technology July 25, 2007 CMS ECAL Status, Test Beams, Monitoring and Integration.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Paolo Rumerio, CERN On behalf of the CMS Electromagnetic Calorimeter Group CALOR 2006 Chicago, June 5 th – 9 th, 2006 Commissioning of the CMS Electromagnetic.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
CMS ROC Report Patricia McBride May 26, 2005.
D. Breton, S. Simion February 2012
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Preparation for CERN test beam
ProtoDUNE Installation Workshop - DAQ
Comments on the DAQv2 advancement
ProtoDUNE SP DAQ assumptions, interfaces & constraints
10/month is the present production rate 2 FTE + sporadic contributions
ScECAL+AHCAL+TCMT Combined Beam FNAL
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
UK CMS Oversight Committee Mtg
E. Garutti - Main Meeting
Presentation transcript:

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi ECAL activity sites 2005 Integration (now) 904 (now) Cosmic ray calibration (May) Cosmic Challenge (september) 2006 Integration (continued) Installation (february-oct) Test Beam H4 (June) Test beam H2-Hcal (July) Commissioning (may-june ?)

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Integration center (867) First final SM being integrated now Expect to ramp up to 3 SM being integrated in parallel 3 ACQ setups are being equipped ( 2 ready, 3rd in progress) Process: commission single ‘channel’ prior to insertion using light weight acq/analysis + dedicated GUI ( single channel = VFE, TT, Token Ring) Once SM fully assemble readout all 1700 channels and operate system using LHC like setup for at least 1 week continously (only data no trigger!)

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Integration center SW needs Basic XDAQ application to read data from DCC and transfer it to monitoring task. Simplified logging: data not meant to be kept forever CCS: ‘train and run-in’ DAQ controls. Specifically will have to go through sequences to change systematically parameters ( e.g. delay scan, pedestal scans). Read-out of leakage currents and temperatures Monitoring task: - for special runs determine which parameter set is the operational one.Eg delay scans - else check quality of data in an automatic way and report to crew only problems Data sets shall be self describing: no DB to tell monitoring task that a given event belongs to a delay scan …

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Cosmic ray calibration (H4) Use transfer chariot to support SM (mounted in storage jig) Calibrate each crystal by using muons going through a single crystal Incline SM by 20 degrees to gain rate for Mod 4 crystals Trigger using plane of scintillators below SM in coincidence with a scintillator placed in ‘LHC luminous area’. Use additional scintillator slabs above SM to anti-tag muons coming from SM side. Use ACQ cabling as for test beam

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi the cosmic calibration setup 1.Incline along eta by deg. (it is the only possible solution for increasing statistics in Module 4) 2.Selective quasi-pointing trigger with edge taggers Edge taggers Trigger counters  focal plane 4cm below SM ~20 cm above SM 1. Rate +30% in M4, -20% in M1 2. Spectrum more homogeneus 3720 mm 650 mm

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi H4 status 4 PC available: 1 for DAQ (no interface yet!), 1 for DB, 1 for DCS and 1 for data monitoring. Assume Laser monitoring farm available as from test beam Trigger: scintillator planes being assembled by IHEP people ( using old DELPHI counters) Mechanical setup: IHEP is also helping designing and assemblying the modification to the transfer chariots to house the SM. ACQ: to start with one should use what is available for 867. Assume that it will upgraded as soon as reliable XDAQ 3 version exists Expect SM to come to H4 in 4 weeks.

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi H4 operation H4 has two goals: - to collect good cosmic rays to allow a calibration with statistical precision at the 1% level - be the laboratory where we make sure that we have the DAQ which we need ( for cosmic challenge, LHC etc.) Maintain two data flow lines: - ‘simple’ aiming to reliably analyze data (root-analyzer) in real time and store them with simple data logger - std CMS data flow through RU, Event builder, FU, data logging through Orca.

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Cosmic Challenge Insert 1-2 SMs in HCAL inside cryostat after mid-september: need ACQ ready to go in place by then ECAL operation in Sx5 should be similar ( or even less complicated) to the one in H4. The challenge: synch with the other subdetector, use TTC generated clocks ( this will be doen in 904, but I think we should try if possible to do this also in H4 when they become available and debugged!) Be ready with the data processing: again an area to train in H4

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Installation First major appointment : february Aim to install all EB+ and some EB- depending on end of installation window. Next : nominally in October possible final window in March 2007 Need:’portable’ DAQ ( HW and SW) to check that the SM is still functioning. My proposal would be to have something similar to what we have in 867 to check that the SM is ‘functioning’ and verify the SM is still behaving like it did in 867-H4. Will need some form of database of dead channels etc… Will not be an endurance test: we will have to be fast. We need dedicated monitoring ( possibly modified versions of root analyzers used in H4) which gives a yes-no answer

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Test Beam 2006: h4 Usual electron beam : from June 8 until November ( present idea is to ask for 2 weeks /month). Test the SM as they come out from the integration with e beam ( and then also with cosmic ! Use same DAQ as for cosmics (+ mods in monitoring)

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Test beam H2 Combined test with hcal Olivier Teller studying mechanical possibilities Agreement with HCAL community that they will take care of most of the installation and XDAQ integration issues (our XDAQ should be the same as H4) We should try to commission this area from the DAQ point of view as soon as possible so leaving XDAQ team free to work when time available rather than stressed at a moment of possible peak demand ( mainly availability of off-det electronics). A possibility could be to move one SM from the cosmic calibration to H4 to commission DAQ and DCS and then leave it to HCAL to integrate …

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Commissioning After final cables are in place and if cooling setup reliable we should run the whole system. At first I think that an H4 like running ( without cosmics of course) should suffice. The aim should be to keep under control possible deterioration of the system and to develop the final local monitoring tasks This period might start shortly after the lowering of the YB0 in the pit as the cabling is scheduled to be the first task. Being ready to hook up a readout as soon as the cables are laid would also help getting cable problems fixed in almost real time…

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Schedule Test enfourneur ( and install 1 or 2 SM for magnet test) 2nd half of september 05 Install Eb+ (start January-February 2006) Test beam 06 : May 8-Sep 18 Test beam 06: electron calibration in H4 Combined test ECAL HCAL in H2: need a new ECAL TB team

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi SX Schedule V34.2 (draft)

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi UX schedule V34.2 (draft)

ECAL Off detector Electronics Workshop Lisbon April T. Camporesi Summary A small team is going to be very busy in many places Off detector electronics risks to be available just in time in many of the sites we are opening… I have not mentioned EE and ES, but they will come online during 2006… An old italian saying: chi ben comincia e’ gia’ a meta’ dell’opera.