L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004.

Slides:



Advertisements
Similar presentations
 Project Overview & System Integration Ted Liu June 11th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting.
Advertisements

Final Commissioning Plan and Schedule Cheng-Ju Lin Fermilab Installation Readiness Review 09/27/2004 Outline: - Work to be done during shutdown - Work.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Slink TX Slink merger Teststand setup Slink merger firmware and testing Firmware features - DAQ RAMs for saving out input and output data - Possible to.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Introduction Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
Summary Ted Liu, FNAL Feb. 9 th, 2005 L2 Pulsar 2rd IRR Review, ICB-2E, video: 82Pulsar
A presentation by Angela Little SULI Program 8/4/04 Pulsar Boards and the Level II Trigger Upgrade at CDF.
1 Pulsar firmware status March 12th, 2004 Overall firmware status Pulsar Slink formatter Slink merger Muon Reces SVT L2toTS Transmitters How to keep firmware.
1 Pulsar firmware status June 11th, 2004 Slink format Transmitter firmware Transmitter firmware status Receiver firmware overview Receiver firmware status.
Using the Trigger Test Stand at CDF for Benchmarking CPU (and eventually GPU) Performance Wesley Ketchum (University of Chicago)
LKr readout: present and future R. Fantechi 30/8/2012.
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Outline: Current status Active splitter Plan Chris Neu, Daniel Whiteson, Rick Van Berg L2 Upgrade Meeting 11 June 2004 XCES Input Path: Status.
Joint Commissioning (2) Commissioning plan Gene Flanagan Purdue University.
Pulsar System Overview and Commissioning Plan Cheng-Ju Lin Fermilab Installation Readiness Review 02/08/2005 Outline: - Items from last review - Pulsar.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Burkard Reisert June 11 th, 2004 Fermilab, High Rise, Hornet Nest Pulsar Meeting Ted’s overview talk: Pulsar production/testing success !  all hardware.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Technical Part Laura Sartori. - System Overview - Hardware Configuration : description of the main tasks - L2 Decision CPU: algorithm timing analysis.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Commissioning Experience and Status Burkard Reisert (FNAL) L2 installation readiness review:
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
For more information on Pulsar board: Burkard Reisert (FNAL) Nov. 7 th, 2003 PULSAR Production Readiness.
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
Simple ideas on how to integrate L2CAL and L2XFT ---> food for thoughts Ted May 25th, 2007.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
June 17th, 2002Gustaaf Brooijmans - All Experimenter's Meeting 1 DØ DAQ Status June 17th, 2002 S. Snyder (BNL), D. Chapin, M. Clements, D. Cutts, S. Mattingly.
Project Overview Ted Liu Fermilab Sept. 27 th, 2004 L2 Pulsar upgrade IRR Review
Beam diagnostics developments at LAPP: Digital part CTF3 Collaboration Meeting Louis Bellier, Richard Hermel, Yannis Karyotakis, Jean Tassan,
L2 Status and Plan Matt Worcester, Heather Ray, Monica Tecchio, Myron Campbell, Jane Nachtman, David Saltzberg, Tom Wright, Steve Kuhlmann, Karen Byrum,
Trigger Commissioning Workshop, Fermilab Monica Tecchio Aug. 17, 2000 Level 2 Calorimeter and Level 2 Isolation Trigger Status Report Monica Tecchio University.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
Pulsar Status Report Ted Liu Friday Trigger Meeting, May 10th. 02 PULSAR: PULSer And Recorder Pulsar design overview:  from L2 teststand tool to a general.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Integration and commissioning of the Pile-Up VETO.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
First group planning meeting: Introduction Introduce new people A brief history of time Goals of this meeting Project overview Roadmap Guideline for the.
L2toTS Status and Phase-1 Plan and Pulsar S-LINK Data Format Cheng-Ju Lin Fermilab L2 Trigger Upgrade Meeting 03/12/2004.
L2 CAL Status Vadim Rusu For the magnificent L2CAL team.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Pulsar Hardware Status Burkard Reisert (FNAL) March, 14 th 2003.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 Run IIb Event Builder upgrade Director’s Review Jan Steve TetherRon RechenmacherMarkus KluteBruce Knuteson MITFNAL/CDMITMIT RonSteve Motivation.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
DAQ and TTC Integration For MicroTCA in CMS
Initial check-out of Pulsar prototypes
CLAS12 DAQ & Trigger Status
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Clk_ch4 Clk_ch3 Clk_ch2 Clk_ch1 L1A global L1A _ch T0+T0r
B904 Status Report by Fred B.
L2 CPUs and DAQ Interface: Progress and Timeline
FED Design and EMU-to-DAQ Test
B904 Status Report by Fred B.
Presentation transcript:

L2TS and Plan for Integration Cheng-Ju Lin Fermilab Pulsar Meeting 06/11/2004

L2TS Pulsar Board (Phase I) TS Receive L2 trigger decision from PC Send L2 trigger decision to trigger supervisor TS broadcast L2A/L2R to all front-end crates b0xft00 b0cot00 b0fcal05 On L2A, receive TL2D bank Send TL2D to the DAQ stream upon L2A Firmware for Phase I summer commissioning has been written (Sakari) First round of testing shows the firmware is working well In the process of integrating with the PCs

PC  L2TS  TS Test Setup We have setup a mini-DAQ system in the test-stand room. L2 Trigger Decision + TL2D Bank (Phase I) L1 Trigger Data TS L1A L2TS Pulsar Pulsar TX (SLINK fiber) PC (SLINK fiber) TS handshaking (sending L2A/R, ROL, Buffer #) Running algorithm Random L1A preFRED/ FRED

Mini-DAQ (supports 8 test-stand crates) RXPT TXPTTS Pulsar (L2TS) FRED (GL1) preFRED Greg F., Andrew M., Michael S. and Bill B. did a tremendous job getting the different boards to live happily under one roof.

“Loop” Status We have achieved the first milestone with the closing of the “TS  PC  L2TS  TS” loop: - Still need to test the loop with high rate and larger data size to look for low level problems - Still need to test the TL2D DAQ path The next major milestone is to bring Daniel’s control/monitoring node into the “loop”  closing THE loop. With “THE” loop fully tested in the test-stand, we’ll be ready for the trigger room.

Summer Integration Plans (1) While we are still testing “THE” loop in the test-stand, we’ll start replicating in the setup in the trigger room (L2TS and Slink TXs in lower alpha crate, PCs on the 3 rd floor). (2) Repeating the same set of test-stand room tests in the trigger room using the real sparky and TS. Can be done in between stores. (3) When the upstream system is ready, we’ll swap the SLINK fiber and send real data into the PC. Proof of principle: use the L2 Pulsar setup for L2 torture and cosmic data runs in between stores. (4) Parasitically running L2 Pulsar in beam (compare alpha TL2D with Pulsar TL2D). In this configuration, L2TS output cable to the TS is dangling. (5) The final step is to plug the L2TS output cable to the trigger room TS in beam run.