April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
1 News from ELAN SC of CARE Paris Sept News from ILC  GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
Review of last year: Global Design Effort Barry Barish ILC Consultations URA, Washington DC 12-May-05.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
September 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2006.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
ICFA Report to Lepton-Photon 2015 July 2014 to August 2015 J. Mnich (DESY) August 21, 2015.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
FALC Technology Benefits study P. Grannis Beijing GDE meeting Feb. 7, 2007 FALC = Funding Agencies for Large Colliders is composed of representatives from.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Brian Foster - Cosener's Forum May 06 1 The ILC - Status & Plans Introduction & latest developments The GDE The baseline design and R&D efforts The path.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Alessandro Variola MAY 23 rd 2007 POSIPOL WELCOME WELCOME POSIPOL 2007 Goals Alessandro Variola MAY 23 rd 2007 Posipol Welcome.
W. ChouLC School, Sokendai, Japan1 Linear Collider needs you  Linear Collider is HEP’s future (~ 2020)  If we want to have a future, we must train a.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
February, INP PAN FCAL Workshop in Cracow W. Lohmann, DESY The BCD (Baseline Configuration Document) The next calendar dates Where we are with FCAL.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
J.P.Delahaye GDE Meeting OXFORD CERN participation to ILC ILC- MoU: Support to GDE Contribution to GDE: J.L.Baldy: Civil Engineering & Conventional.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
Atsuto Suzuki (KEK), Chair ICFA Report from ICFA ICFA mission and membershipICFA PanelICFA Activity.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
September 2008 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2008.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Accelerator Physics Topics REPORT Philip Bambade LAL-Orsay LCWS 2005 Stanford, 22 March 2005.
Progress in 2006 of ELAN- BDYN and INSTR D. Schulte G. Blair.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
25 October 2004O. Napoly, EU-GDE meeting in Oxford 1 French Funding Agencies CNRS/IN2P3 : National research Institute on Nuclear Physics and Particle Physics.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Some Issues on Detector (and MDI) R&D EURO-GDE Meeting DESY May
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
ESGARD - 19th May 06 Very brief summary! 32 LOIs received LHC Upgrade
RECFA Meeting in Paris May
Introduction to the Workshop
Status and Plan of GDE Design Work (Including Road Map for RDR)
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Yamamoto WG3: ML-SCRF Parallel Session,
EU Institution Board 1 representative of each participating institute
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
CLIC/ILC Collaboration Meeting: Objectives & Organization
ILC Global Design Effort
Barry Barish GDE Caltech
Electron Source Configuration
Yasuhiro Okada, Executive Director, KEK
Presentation transcript:

April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006

April 2006F. Richard LAL/Orsay2 Outline  Workshops supported by ELAN in 2006  The ELAN workshop in Orsay  Discussions in view of FP7  A recurrent problem

April 2006F. Richard LAL/Orsay ILC-LETILC-LET Workshop FebruaryCERN LCWS2006LCWS2006 International Linear Collider Workshop GDE Meeting GDE Meeting March March Bangalore, India Compton Posipol Workshop AprilCERN XFEL WorkshopXFEL Workshop organized by EIFastEIFast MayDESY Electron Accelerator R&D for the Energy Frontier ELAN+EUROTEV+EUROLEAP MayOrsay, France ILCILC School MayJapan HG2006 Workshop on High Gradient RF and breakdown studies Sept.CERN

April 2006F. Richard LAL/Orsay4 A few details   ILC LET workshop February chaired by K. Kubo (KEK), P. Tenenbaum (SLAC), D. Schulte (CERN): issues of the low emittance transport in the ILC from the damping ring to the interaction point and beyond  The ILC Global Design Effort Meeting 9-11 March 2006, Indian Institute of Science, Bangalore, India preparation of RDR document with cost ILC Global Design Effort ILC Global Design Effort  POSIPOL: options and open issues of a polarized positron source based on laser Compton back scattering for ILC and CLIC, and R &D efforts towards a complete Compton source design.  High Gradient RF - HG CERN Sept 2006, co-organized by LTECNC: limits on high fields in rf cavities and what causes breakdown and other phenomena that limit the ultimate gradients of these devices, such as surface pulsed heating.

April 2006F. Richard LAL/Orsay5  A workshop about the European XFEL will be held by EIFast at the DESY site in Hamburg on 9/10 May 2006  EIFast: European Industry Forum for Accelerators with SCRF Technology  International Accelerator School for Linear Colliders19-27 May 2006 Sokendai, Hayama, Japan Organized by ILC GDE, ICFA Beam Dynamics Panel and the International Linear Collider Steering Committee

April 2006F. Richard LAL/Orsay6 Electron Accelerator R&D for the Energy Frontier  CARE/ELAN on May 15: - Plenary in the morning on laser/plasma, a proposal for a new infrastructure on SC, Progress in CLIC cavities, BDYN+INSTR… - Plenary in the morning on laser/plasma, a proposal for a new infrastructure on SC, Progress in CLIC cavities, BDYN+INSTR… - FP7 1h30 discussion in the afternoon - FP7 1h30 discussion in the afternoon - 4 Parallel ELAN sessions for 3h Parallel ELAN sessions for 3h30  EUROLEAP kick-off meeting on May 16  In // EUROTEV on May 16  Reserved morning on Wednesday EUROLEAP

April 2006F. Richard LAL/Orsay7 Preparation of FP7  First discussion within ESGARD February  Important discussions taking place at the CCSG in Berlin Zeuthen beginning of May -> ELAN meeting is timely on these issues  What are our goals after CARE+EUROTEV ?  What fits into a DS or into a JRA ?  Why do we need a European SC RF facility beyond TTF ?

April 2006F. Richard LAL/Orsay8 European SC RF Facility at CERN  LoI sent to the CERN-Council SG ON March 15  Participation of ELAN (L. Lilje, F.R.)  Basic idea: TTF facility (SC technology) heavily used for XFEL and should be partially replaced by a new facility dedicated to R&D on SC  CERN, as a center of excellency for SC, could house such a facility  Needs support from the CERN-Council to be supported by ESFRI supported by ESFRI

April 2006F. Richard LAL/Orsay9 A recurrent problem for ELAN financing  The EU money arrives late in the year  This can be handled provided the national administration accepts to pay ELAN missions in the 1st part of the year (banking)  If not there is a very uncomfortable situation: - no money until June-July - no money until June-July - overspending imposed on the rest of the year - overspending imposed on the rest of the year  What can be done ?

April 2006F. Richard LAL/Orsay10 Conclusions  Very active period on accelerator R&D  ELAN is a useful tool in: - Supporting workshops on a future linear colliders - Supporting workshops on a future linear colliders - Promoting new techniques for acceleration - Promoting new techniques for acceleration - Preparing for FP7 - Preparing for FP7

April 2006F. Richard LAL/Orsay11 Main Deliverable for 2006  Data base on diagnostics performance WP4 CCLRC, UMA  Web page connected to GDE /ELAN_INSTR_home.htm

April 2006F. Richard LAL/Orsay12 bcd:instrumentation_and_controls:instrumentation_and _controls_homebcd:instrumentation_and_controls:instrumentation_and _controls_home ILC Table of Contents Instrumentation and Controls Overview Baseline Subsystems Alternatives [] Instrumentation and Controls Introduction 10.0 The Instrumentation and Controls BCD consists of 13 sections and an introduction.The Instrumentation and Controls BCD consists of 13 sections and an introduction. Overview Baseline

April 2006F. Richard LAL/Orsay13 Subsystems 10.1 Controls Standard ArchitectureControls Standard Architecture 10.2 Timing systemTiming system 10.3 Diagnostic Interlock LayerDiagnostic Interlock Layer 10.4 Global Accelerator NetworkGlobal Accelerator Network 10.5 Machine Protection SystemMachine Protection System 10.6 Low Level RFLow Level RF 10.7 FeedbackFeedback 10.8 Controls - Instrumentation IntegrationControls - Instrumentation Integration 10.9 Machine Detector Interface (TBA) Beam Position MonitorsBeam Position Monitors Transverse Profile MonitorsTransverse Profile Monitors Longitudinal Diagnostics System.pdfLongitudinal Diagnostics System.pdf Special Systems (TBA) Alternatives Description Supporting Documentation Required R&D