SEE-GRID-SCI NA4 Progress PSC05, Dubrovnik, 9-11 September 2009 Cevat Şener Dept. of Computer Engineering, Middle East Technical.

Slides:



Advertisements
Similar presentations
PAINLESS PERIODIC REVIEW Cynthia Steinhoff Anne Arundel Community College Arnold, Maryland.
Advertisements

Refresher Instruction Guide Strategic Planning and Assessment Module
TATS – TA Report Submission Department of Health and Human Services Health Resources and Services Administration HIV/AIDS Bureau.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Experimental Psychology PSY 433
End and Start of Year Administration Tasks. Account Administration Deleting Accounts Creating a Leavers Group Creating New Accounts: Creating accounts.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Overview of New Behind the Blackboard for Blackboard Customers APRIL 2012 TM.
Partner Network Portal Anna Jones :: July 2006 Partner Training Webinar Communications Sector.
EGEE is a project funded by the European Union under contract IST NA2 Dissemination John DYER Activity Leader All Activity Meeting, CERN 18.
Work Package 5 - Dissemination Work Package 5 - Dissemination P5 has an overall responsibility to ensure the timely achievement of the targets and deliverables.
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
1 Framework Programme 7 Guide for Applicants
Update on the VERSIONS Project for SHERPA-LEAP SHERPA Liaison Meeting UCL, 29 March 2006.
SEE-GRID-SCI Miklos Kozlovszky SZTAKI NA3 – Dissemination and Training PSC06 Meeting, Istanbul, December 7-8,
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
An Introduction to Grants.gov Sponsored Programs Office February 22,
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
Preparing Grant Proposals: A Session for INASP Country Coordinators Barbara Gastel, MD, MPH AuthorAID Knowledge Community Editor Bangladesh May 2009.
Thurrock Education Services Web Portal Sarah Williams Web Communications Officer Heather Clark Senior Data Liaison Officer.
VP Publications’ Report Vincenzo Piuri 2009 AdCom Meeting Vancouver, Canada – November 2009.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
SEE-GRID-SCI Regional Grid Infrastructure: Resource for e-Science Regional eInfrastructure development and results IT’10, Zabljak,
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator Anna Loukakou, Project Financial Administration GRNET NA1: Project Administrative and.
User Management: Understanding Roles and Permissions for Schoolnet Schoolnet II Training – September 2014.
P5 Work Package 5 - Dissemination (WP5) Overall responsibility to ensure the timely achievement of the targets and deliverables for this WP – page 19 Recipe.
 Read through problems  Identify problems you think your team has the capacity and interest to solve  Prioritize the problems and indicate the.
SEE-GRID-SCI Ognjen Prnjat, Project Coordinator GRNET NA1: Project Administrative and Technical Management PSC07 Meeting, Zabljak,
Presentation to Legal and Policy Issues Cluster JISC DRP Programme Meeting 28 March 2006.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis for Arabic Speaking Countries, Amman, Jordan May 2011 Identification.
SEE-GRID-SCI Miklos Kozlovszky NA3 Leader SZTAKI NA3 – Dissemination and Training Overview and achievements.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Next Steps: becoming users of the NGS Mike Mineter
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
Compliance Assist Refresher Instruction Guide Adding or Editing Student Learning Outcomes.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
SEE-GRID-SCI NA1-Technical Execution Plan Overview Open of PSC-03 Bucharest Ioannis Liabotis Greece GRNET iliaboti grnetSPAMFREE.gr.
P5 Work Package 5 - Dissemination (WP5) Overall responsibility to ensure the timely achievement of the targets and deliverables for this WP – page 19.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
LG DATABASE AND REPORTING SYSTEM (LGDRS) 8-9 September 2015
Hubnet Training One Health Network South East Asia Network Overview | Public and Members-only Pages; Communicating and Publishing using Blogs and News.
Ian F. C. Smith Writing a Journal Paper. 2 Disclaimer / Preamble This is mostly opinion. Suggestions are incomplete. There are other strategies. A good.
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis for Arabic Speaking Countries, Amman, Jordan May 2011 Identification.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Task tracking SA3 All Hands Meeting Prague.
EGEE is a project funded by the European Union under contract IST Generic Applications in EGEE-NA4 Roberto Barbera NA4 Generic Applications.
Partner Ready Portal: New Partner Registration Process
Educating Academic Advisors in WEB 2.0 Steve Davis-Rosenbaum, Academic Advisor, College of Arts and Sciences, University of KY Patsy Carruthers, Teaching.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
INFSO-RI Enabling Grids for E-sciencE Quality Assurance Gabriel Zaquine - JRA2 Activity Manager - CS SI EGEE Final EU Review
SEE-GRID-SCI NA4 Progress PSC07 Zabljak, February 2010 The SEE-GRID-SCI initiative is co-funded by the European Commission under.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
Research and Innovation REPORTING and PAYMENT (in practice) v
SEE-GRID-SCI NA4 Progress PSC06 Istanbul, 7-8 December 2009 The SEE-GRID-SCI initiative is co-funded by the European Commission under.
A Framework for Assessing Needs Across Multiple States, Stakeholders, and Topic Areas Stephanie Wilkerson & Mary Styers REL Appalachia American Evaluation.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
Connecticut Department of Public Health - Keeping Connecticut Healthy Connecticut Department of Public Health PHABuloCiTy! Public Health Accreditation.
Building PetaScale Applications and Tools on the TeraGrid Workshop December 11-12, 2007 Scott Lathrop and Sergiu Sanielevici.
Present apply review Introduce students to a new topic by giving them a set of documents using a variety of formats (e.g. text, video, web link etc.) outlining.
Quarterly Geo/SIG Coordinator Webinar June 25, 2014.
Critical Step Web Site Presentation. Ing. Carlo Sanghez Consorzio Interuniversitario Nazionale per l'Informatica Napoli,
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Partners in Learning Network Africa User Guide
Online Submission and Management Information -- Authors
[insert Module title here]
USER MANUAL - WORLDSCINET
USER MANUAL - WORLDSCINET
Presentation transcript:

SEE-GRID-SCI NA4 Progress PSC05, Dubrovnik, 9-11 September 2009 Cevat Şener Dept. of Computer Engineering, Middle East Technical University, Ankara

PSC05, Dubrovnik, 9-11 September Current NA4 Activities NA4.2 Adapt Grid applications NA4.3 Support the deployed applications

PSC05, Dubrovnik, 9-11 September Review Recommendations In the second year of the project, the partners will need to place more emphasis on dissemination of the scientific outputs from the project. Deliverable NA4.4 due in M24, User Community Engagement and Applications Assessment, should signpost: the new science / new capabilities developed by the project; how the scientific state of the art has been advanced by the project; how the grid has helped advance the science base. In addition, it will be important to point to scientific papers produced by the project that have appeared in refereed conferences/journals outside the grid community in the scientific field of interest.

PSC05, Dubrovnik, 9-11 September Application Dissemination Application Web Pages: To achieve AP#135, application developers are expected to prepare web pages with substantial content on their applications (also, continuing to keep the targeted content at the wiki might be an option if it is appropriate for that full content). Wiki should hold the rich content for application descriptions or links to the actual web pages. Still very limited content on the Web! One application with a web page and a link from wiki to it; Some (ROMS, e.g.) with a web page but w/o link from wiki. Need immediate action by the developers. We may also consider having direct links from project web to wiki page of VOs or to application web pages.

PSC05, Dubrovnik, 9-11 September Application Dissemination iSGTW Submissions: Coordinated by NA3. Developers should follow the submission schedule. Focus: Should not limited to the Grid conferences etc. More emphasis should be given to the publications in our scientific domains: Meteorology, Seismology, Environmental Protection. Each VO can form (and keep updated) a list of conferences, workshops, journals etc. in the scientific domain for the members to submit their results – VO Leaders + Scientific Representatives can lead this process.

PSC05, Dubrovnik, 9-11 September Application Dissemination Deployment in production: Lets have some version deployed in production as early as possible – November 2009, latest. Should be made available to the scientific community to attract potential users. Generated results should be disseminated as well. SEE-GRID-SEE User Forum: Every application is expected to submit an abstract.

PSC05, Dubrovnik, 9-11 September Applications' Progress Details are to be covered within the VO presentations. Critical: CHERS is still behind the schedule. RO team declared that they are ready to help technically. However, the problem is now more administrative. Update in the development timeline needed, and must be strictly obeyed.

PSC05, Dubrovnik, 9-11 September New Applications: ROMS and CCIAQ NA4 Application Questionnaire was filled by both of them. Presentation uploaded to " Downloads > NA4 > Applications_August08 " by ROMS only – Expected from CCIAQ as well. ROMS has no regional collaboration yet! With AL, ME? Other possible operations: Filling in JRA1 and SA1 surveys. Updating the timeline to create the iSGTW articles, e.g. appending ROMS and CCIAQ to M23. Updating the lists, tables etc. of Envo VO – Wiki has already been updated, but it might be needed to go over the VOMS groups. Suggestion for VO ASG teams to be formed: CCIAQ→ S.Ivanovska, E.Atanassov + A.Balasko ROMS→ D.Davidovic + N.Frasheri

PSC05, Dubrovnik, 9-11 September New Extension: EnviMon to GreenView Proposed by MD team. Goals were clarified, and timeline provided:

PSC05, Dubrovnik, 9-11 September Application Accounting Here is the current status : The Seismo VOMS is ready. Three application groups on the Meteo VOMS: /GR/App/REFS, /RS/App/REFS, /HR/App/WRF-ARW Normally, one group per application is assumed – We should check if it creates any problem for accounting or not? /GR/App/REFS has two members, but the others have none. The Envo VOMS not responding: When checked before, there were some –but not all– of the application groups defined on it with the registered users. A user should declare his/her role using the "voms-proxy-init" command before submitting an application (may not be required if s/he is registered to only one application group).

PSC05, Dubrovnik, 9-11 September Application Accounting “Elapsed Time” figures taken from the new interface: MPI jobs Q1Q2Q3Q4Q5 Envo Meteo Seismo00001 Single jobs Q1Q2Q3Q4Q5Envo Meteo Seismo

PSC05, Dubrovnik, 9-11 September VO Meetings VO meetings (incl. EVO) expected to be held regularly – once bimonthly. Also, their minutes need to be uploaded to the project web in the SEE-GRID-SCI format. On the web only the following minutes are available: Minutes of the EVO-1 Meteorology Minutes of the EVO-1 Seismology Minutes of the EVO-2 Meteorology Others: Not held or Held but their minutes not uploaded?

PSC05, Dubrovnik, 9-11 September DNA4.3 – Gridification Guideline Draft ToC has been announced by Davor. It needs to be finalized first. Contributions expected from Activity / VO Leaders. By circulating through the s very quickly or by F2F communication during PSC05. Next, we can create the wiki sections accordingly and assign the responsibilities. There we can also make use of the "Contribution Policy", "Instructions for Contributions" and the other content left from SEE-GRID2.

PSC05, Dubrovnik, 9-11 September Collaboration with GENESI-DR Latest status: They are checking the data access techniques for different data types, formats etc. The main problem is the certification and the access rights. For each data source two certificates are needed: One certification is given by GENESI-DR portal (ESA), and another one is given by the data owner (the particular data repository). That means for each data source one need different certification. The GENESI-DR project is on the development as well, and all the problems, and our requirements are resolved on the way.

PSC05, Dubrovnik, 9-11 September Action Points Application web pages should be completed as described [Developers, October'09] The iSGTW submissions schedule should be obeyed by the developers. VO Leaders and Scientific Representatives guide the members for scientific publications by providing a list of scientific events + journals to be targeted [VO Leaders + Scientific Rep., October'09]. Some version of the applications should be deployed in production and made accessible to the scientific community to attract potential users [Developers, November'09]. Applications should submit abstract to the User Forum [Developers, September'09]. The development timeline of CHERS needs to be updated and followed [Neki Frasheri, October'09].

PSC05, Dubrovnik, 9-11 September Action Points Regarding our new applications: The application presentation for CCIAQ should be uploaded [Dimiter Syrakov, September'09]. Regional collaborations for ROMS [Davor Davidovic, October'09]. VO ASG teams for ROMS and CCIAQ [Cevat Sener and Alex Stanciu, September'09]. VOs should make sure that application groups are ready on VOMS, and users declare roles [Technical Rep., September'09]. VO meetings should be held, and minutes should be uploaded regularly [VO Leaders]. Members of the collaborating institutes should register to VOMS. ToC for DNA4.3 should be finalized; corresponding wiki sections should be created and assigned to the relevant teams [Davor Davidovic and Cevat Sener, September'09].