Onsite Status RIKEN/RBRC Itaru Nakagawa. OASys Light Source Spacer.

Slides:



Advertisements
Similar presentations
Readiness of Forward Muon Arms for W Detection Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration 1.
Advertisements

Post Run13 MuTR/MuTrig Maintenance 1. Cathode Cable in mis-contact : South Station-1 Oct-5, Gap-2 2.
S1,N1 Counters RIKEN/RBRC Itaru Nakagawa. 4/15 ~ 4/29 S1,N1 Counters in MuID square hole. Lay down on the bottom of garage shielding.
Recap Clamp 1008 and Production RIKEN/RBRC Itaru Nakagawa 1.
Waveguides M. Yoshida (Osaka Univ.) MICE meeting at LBNL 09.Feb.2005.
MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
Recap Analysis RIKEN/RBRC Itaru Nakagawa. Conductive Rubber Attempted to cut in RIKEN using super sonic cutter. Achieved Precision ~ ± 0.8mm 抵抗値 富士高分子.
MuTr/MuTrig Performance of Run13 RIKEN/RBRC Itaru Nakagawa 1.
MuTr Recapacitation RIKEN/RBRC Itaru Nakagawa 中川格 1.
HKS Analysis Log Jun 2006 part3 D.Kawama. 0 .今回の目次 1.Target での dE/dX 2.HKS sieve slit simulation(Geant4)
9.線形写像.
時間的に変化する信号. 普通の正弦波 は豊富な情報を含んでいません これだけではラジオのような複雑な情報 を送れない 振幅 a あるいは角速度 ω を時間的に変化 させて情報を送る.
相関.
素数判定法 2011/6/20.
フーリエ係数の性質. どこまで足す? 理想的には無限大であるが、実際に はそれは出来ない これをフーリエ解析してみる.
公開鍵暗号系 2011/05/09.
1章 行列と行列式.
1 ヤマセに関する 2-3 の話題 (2) 川村 宏 東北大学大学院理学研究科 H 弘前大学.
フーリエ級数. 一般的な波はこのように表せる a,b をフーリエ級数とい う 比率:
計算のスピードアップ コンピュータでも、sin、cosの計算は大変です 足し算、引き算、掛け算、割り算は早いです
信号測定. 正弦波 多くの場合正弦波は 0V の上下で振動する しかし、これでは AD 変換器に入れら れないので、オフ セットを調整して データを取った.
1 9.線形写像. 2 ここでは、行列の積によって、写像を 定義できることをみていく。 また、行列の積によって定義される写 像の性質を調べていく。
アルゴリズムとデータ構造 補足資料 7-4 「単純交換ソート exsort.c 」 横浜国立大学 理工学部 数物・電子情報系学科 富井尚志.
6-4 エンタテインメント 09fi113 にしうらしょういち 09fi119 はやさかまさあき.
学習者の意欲を高める音読指導の 一時例 1 Speak を使った 音読指導 鈴木政浩(西武文理大学)
Analog “ neuronal ” networks in early vision Koch and Yuille et al. Proc Academic National Sciences 1986.
Recap Clamp Production and Installation RIKEN/RBRC Itaru Nakagawa 1.
移動エージェントプログラムの 動作表示のためのアニメーション言 語 名古屋大学情報工学コース 坂部研究室 高岸 健.
可視化( Visualization ) シミュレーション結果の数値などの目 に見えない情報を、人間の把握しやす い図形やイメージなどの形式に変換し て出力すること。 ショートレポート シミュレーション結果の可視化の例を 一つ挙げ、その役割について簡単に述 べよ。
お絵描きロボットの研究お絵描きロボットの研究 機械知能システム学科 ロボット工学講座. システム構成 処理部 PC 入力部 タブ レット 出力部 マニピュレー タ セン サ 力覚セン サ.
音の変化を視覚化する サウンドプレイヤーの作成
1 ATF Linac status and future plan E=1.28GeV Ne=2x10 10 e-/bunch Bunch#/shot 1 ~ 20 bunches(2.8ns spacing) Bunch#/shot 1 ~ 10 bunches(5.6ns spacing) Rep.
MuTr Recap Status and Plan. Plan We are shooting for North Station-1 for post Run10 shutdown installation. Best scenario is to mount portable “clamp”
Rikkyo University Murata.lab / RIKEN Rikkyo University Murata.lab / RIKEN Master course 2nd Kentaro Watanbe Kentaro Watanbe PHENIX Colaboration meeting.
Optical Alignment System (OASys) Masters Thesis of Yuki Ikeda Rikkyo University Presented by Itaru Nakagawa RIKEN/RBRC 1.
Rikkyo University Murata.lab / RIKEN Rikkyo University Murata.lab / RIKEN Master course 2nd Kentaro Watanbe Kentaro Watanbe PHENIX Colaboration meeting.
Run10 Preparation Status and Issues Itaru Nakagawa RIKEN/RBRC.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Run11 MuTrig-FEE Summary RIKEN/RBRC Itaru Nakagawa 1.
South SG1 Trigger High Rate Sanghwa Park, Katsuro Nakamura, Yoshimitsu Imazu, and Itaru Nakagawa 1.
Atsuhiko Ochi Kobe University ATLAS-J MicroMEGAS meeting 4/12/2014.
MuTR/MuTrig Readiness for Run13 Itaru Nakagawa on Behalf of MuTrig/MuTr Group 1.
1 MuTRG-FEE Upgrade Status RIKEN/RBRC Itaru Nakagawa.
Title. まりも? 自然界の毬藻形成 – いまの自分たちの「まりも」との共通点、 大事なエッセンスを抽出しよう! 私たちの「毬藻」
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
1 South Arm Installation Plan Itaru Nakagawa RIKEN/RBRC.
Rails Chat! Rails 関西 Rails Chat の歴史.
1 Injection tuning of ATF Design acceptance of the ATF-DR Emittance(x,y)3x10 -3 m Timing +/-350ps dE/E+/-1.5% To supply stable beams to ATF2, the injector.
今日の内容 高階関数  関数を値として扱う 関数を引数にとる 関数を返す関数 プログラミングの例題  クイックソート.
Koshi High School Oida Ryosuke Nakamura Kazuki.  Air resistance affects falling objects  When we can’t ignore air resistance, the faster the speed of.
Resistance of objects in fluid 2 年理数科 Keita Asada Yuki J. Miyaguchi Tomohiro Katsuki Naotaka Susuki.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
Recap Clamp for MuTr Station-3 Itaru Nakagawa For the PHENIX Muon Trigger Upgrade Collaboration Especially credit to: Tsutomu Mibe (KEK) Yoshinori Fukao.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
MuTrig-FEE Install Status RIKEN/RBRC Itaru Nakagawa 1.
Run11 MuTrig Performance RIKEN/RBRC Itaru Nakagawa 1.
Conformal Coat Quality issues Update of November 3, 2004.
1 Installation Status Remaining Issues RIKEN/RBRC Itaru Nakagawa.
Onsite Report Itaru Nakagawa RIKEN/RBRC. Schedule.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
S-2S meeting Toshiyuki Gogami 15 Oct Contents TOF detector Kyoto University.
Onsite Work Summary RIKEN/RBRC Itaru NAKAGAWA. Completed Re-capacitation St-1, Gap-1 N&S Completed St-2 Terminators Install to South Oct.5 (except for.
Preparation for Run10 RIKEN/RBRC Itaru Nakagawa. TLD badges (to be replaced every two weeks) Location of dosimeters in MuTr.S St.1 TK361 TK362 TK363 TK364.
Summary of Fuse Testing for Barrel Module Fuse Boxes
Development of large GEM trackers
Reaction Plane Calibration
Presentation transcript:

Onsite Status RIKEN/RBRC Itaru Nakagawa

OASys Light Source Spacer

New Spacer Filed off screw head

Light Spot with/without the Spacer 1.3mm 1.1mm w/o spacer w/ spacer 100 pixels shift out of 650 pixels observed in X direction. May be acceptable.

OASys DAQ System Cannot check South OASys. We have to wait until all SMM to be back on beam line

Thermocopules to North St-1

mk OASys Fast Offline Raw Datasub_ana.pl t.bat バッチ処理ファイ ル fit_ikeda.C 画像フィットマクロ sum.pl (log file からフィット ログ抜き出し) sum_stat.pl (mean,sigma の抜き出 し) MakeTRee.C 7 Fitting result Log files sum_stat.dat file i/o の low level 関数で新しい gcc ライブラリと非互換問題 -> fopen/fread で解決 mklist.pl -> File list

Recapacition Completed South Station-1 Gap-1

HV Test Station-1 Gap-1 are all OK. Some trips in Station2 and 3

Recap Clamp Installation

Recap Clamp Installed to Gap-2

Recapacitation Clamps What do we do with coating? – Physically scrape off -> Need develop tool – Chemically remove -> Under investigation – Heat it up -> Soldering Iron Inspection of the contact – Fiber Scope – Voltmeter

Fiber Scope Small diameter  =6mm Short Focus 5 ~ 10 mm Side mirror ~54,000Yen

クリップ型の開発史 難燃性抵抗 富士ゴム UL94-V2 2〜32〜3 信越ゴム UL94-V0 100〜40 0  14 Remove Coating Coating after installation Remove Coating Coating after installation Penetration Power of Coating Penetration Power of Coating

Summary Recap Clamps Alignment -> Spacer works OK. Visual Check -> Fiber Scope Contact Check -> Voltmeter new design Conductive Rubber – Coating Removal – Re-coating after installation -> Splay type works? Folk Type – Penetration power? – Pre-coating on recap clamp works?

Remaining Tasks 1.Further contact test of the clamp with voltmeter. 2.Pre-coating the recap clamp 3.Diagnose OASys Camera N2 4.Station-2 Terminator install 5.Toggle switch South St.2 ADTX -> but no power 6.St-1 terminator install (Mike next week) 7.OASys light source install (Mike next week) 8.South OASys check

Re-run Muon Trigger South fibers Re-run MuTR cables South OASys Check South St-2 Oct7 ADTX threshold test Re-run Muon Trigger South fibers Re-run MuTR cables South OASys Check South St-2 Oct7 ADTX threshold test Oct 27 – 29 RBRC Review Oct 27 – 29 RBRC Review