Doc.: IEEE 802.22-11/0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Opening Report IEEE P802.22 Wireless RANs Date: 2011-03-12 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0019r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 November Plenary Opening Report IEEE P Wireless RANs Date: Authors:
Advertisements

Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Doc.: IEEE /0075r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Opening Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /0034r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Closing Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0220r0 Submission March 2005 Peter Ecclesine, Cisco SystemsSlide Liaison Report Atlanta Notice: This document has been prepared.
Doc.: IEEE /0032r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
Coexistence Motions for LB84 Comment Resolution
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
IEEE WG Status Report – July 2005
IEEE P Motions at the July Plenary EC Meeting
LB73 Noise and Location Categories
LB73 Noise and Location Categories
SG CUB Tentative Timeline
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
Motion to accept Draft p 2.0
November 2013 Opening Report
March Plenary Opening Report
IEEE P Motions July Plenary EC Closing Meeting
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
IEEE P Wireless RANs Date:
IEEE P Project Status Date: Authors: July 2013
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
July 2014 Opening Report Date: Authors: July 2014
July 2012 Opening Report Date: Authors: July 2012
TGs San Diego Closing Report
IEEE WG Opening Report – July 2008
LB73 Noise and Location Categories
EC Summary of PAR Development
March 2012 Opening Report Date: Authors: March 2012
IEEE P PAR Extension Request
March Plenary Opening Report
November Plenary Opening Report
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
March Plenary Opening Report
November Opening Report
July Plenary Opening Report
November Plenary Opening Report
[ Policies and Procedure Summary]
EC Motions – November 2005 Plenary
IEEE P Wireless RANs Date:
May 2005 CAPWAP AHC Closing Report
November Plenary Opening Report
IEEE P Wireless RANs Date:
July Plenary Opening Report
[ Policies and Procedure Summary]
November 2012 Opening Report
September 2012 Opening Report
January Opening Report
IEEE P Motions at the July Plenary EC Meeting
Advanced Beaconing Schedule and Timelines
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGp Closing Report Date: Authors: January 2006 Month Year
Tge Closing Report Date: Authors: July 2005 July 2005
IEEE P Motions at the July Plenary EC Meeting
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November Plenary Opening Report
July 2013 Opening Report Date: Authors: July 2013
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Opening Report IEEE P Wireless RANs Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chairhttp://standards.ieee.org/guides/bylaws/sb-bylaws.pdf Apurva N. Mody as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at > March 2011

doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 2 Outline IEEE WG Agenda IEEE P – Progress Report IEEE P – Progress Report IEEE P – Progress Report Letters of Assurance Past and Future Meetings Likely WG Motions at the March EC Meeting March 2011

doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 3 IEEE P WG Agenda Opening Plenary Motions at the EC - Request the chair to make the following motions to the EC Conditional Approval to forward the IEEE Standard to the IEEE SA RevCom IEEE P – Resolve any un-resolved comments related to Draft v2.0 and launch the IEEE Draft 3.0 Re-circulation ballot if needed IEEE P – Project Completed. Standard published on November 1 st 2010 Mid-week plenary IEEE P – WG Letter Ballot 1.0 on-going. Seek ideas for new PARs to continue the standards development for cognitive radio based operation Closing Plenary EC Meeting March 2011

doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 4 IEEE P Progress Report March 2011 Number of Eligible Voters in this Ballot Group155 Number of Affirmative Votes107 Number of Negative Votes with Comments9 Number of Negative Votes without Comments0 Number of Abstention Votes13 Response Ratio83% (129 Votes Received), 10% Abstention Number of Affirmative Votes107 Number of Negative Votes with Comments9 Approval Ratio92% The results from the Sponsor Ballot #1 that opened on December 16th, 2010 and closed January 15th, 2011 were as follows Response Rate This ballot has met the 75% Returned Ballot requirement Approval Rate This ballot has met the 75% Affirmation Requirements Agenda for the March Meeting Resolve any un-resolved comments and proceed towards RevCom submission

doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 5 IEEE P Progress Report P WG Letter Ballot 1.0 was launched at the end of July Plenary Meeting – Comments are currently being resolved. March 2011

doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 6 Updates to the IEEE Homepage The IEEE Homepage is Getting a Constant Facelift ( March 2011

doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 7 IEEE P Letter of Assurance The Chair has received the Letter of Assurance from Microchip Corporation Inc. for the use of their UNI I/O Bus protocol and EEPROM technology in the the IEEE P Standard. The LoA can be found on the website at March 2011

doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 8 Future Sessions IEEE Future Sessions are planned as follows SessionDatesLocation PlenaryMarch 13-18, 2011Singapore InterimMay 8-13, 2011Palm Springs, CA PlenaryJuly 17-22, 2011San Francisco,CA InterimSept 8 – 23, 2011Okinawa, Japan March 2011

doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 9 Likely P WG Motions to the EC(2) 1.Motion for conditional approval to forward IEEE P Standard to the IEEE SA RevCom March 2011

doc.: IEEE /0039r00 Submission March 2011 Apurva N. Mody, BAE SystemsSlide 10 References IEEE WG Agenda, March Plenary, Singapore. agenda.xls agenda.xls P Sponsor Ballot 1.0 Comment Database and Proposed Resolutions - comments-database.xls comments-database.xls P January Interim, WG Meeting minutes - minutes.doc minutes.doc P Comment Database and Proposed Resolutions - comments-d7.xls comments-d7.xls P Comment Confirmation Database draft-7-sponsor-comments-confirmation.xlshttps://mentor.ieee.org/802.22/dcn/10/ draft-7-sponsor-comments-confirmation.xls