1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.

Slides:



Advertisements
Similar presentations
Stephanie Allison LCLS Event System 14 June LCLS Event System Outline HW Block Diagram Timing Requirements Time Lines EVG.
Advertisements

Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI,
EPICS Collaboration Meeting, Hsinchu, Taiwan, June, 2011 NSLS-II Power Supply Control System Yuke Tian Accelerator Division Photon Science Directory Brookhaven.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
Stephanie Allison/John Dusatko EPICS Collaboration Meeting May 1, Timing and Event System for the LCLS Electron Accelerator*
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Fast Orbit Feedback System for NSLS-II Kiman Ha NSLS-II Controls Group EPICS Collaboration meeting Oct 22~26, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Control System Overview Bob Dalesio, Control Group Leader 8 th ASAC meeting for NSLS-II Project May 10-11, 2011.
29/06/2007FOFB at Diamond1 Fast Orbit Feedback (FOFB) at Diamond Guenther Rehm, Head of Diagnostics Group.
Power Supply Controller Architecture
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Synchronous Device Interface at NSLS-II Yuke Tian Control Group, NSLS-II, BNL (May 1, 2009 EPICS Collaboration Meeting, Vancouver)
Beam Instrumentation for Orbit Stability I. Pinayev.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
EPICS Collaboration Meeting Spring 2010, Aix France, Jun 2, 2010 Page 1 ITER CODAC COntrol, Data Access and Communication System for ITER Anders Wallander.
1 BROOKHAVEN SCIENCE ASSOCIATES Control System Overview L. R. Dalesio EPICS Collaboration March 11, 2008.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLSII Physics Applications – Applying V4 The Control Group – presented by Bob Dalesio Taiwan EPICS Meeting, June 2011.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
LANSCE Timing Requirements LA-UR Eric Bjorklund.
Power Supply Control at NSLS-II Yuke Tian Control Group, NSLS-II, BNL (May 1, 2009 EPICS Collaboration Meeting, Vancouver)
Micro-Research Finland Oy Timing System Modules Jukka Pietarinen EPICS Collaboration Meeting, Argonne, June 2006.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Micro-Research Finland Oy Components for Integrating Device Controllers for Fast Orbit Feedback Jukka Pietarinen EPICS Collaboration Meeting Knoxville.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS-I/LCLS-II Timing System Low Level Kukhee Kim for LCLS Timing Team ICD Software,
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
1 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing George Ganetis Integrated Testing ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 EPICS IOC Embedded on PLC for TPS Pulse Magnet Power Supply Control Chun-Yi Wu TPS Control.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES Control System Overview Bob Dalesio, Control Group HLA Review for NSLS-II Project April
EPICS EPICS Limitations Bob Dalesio Marty Kraimer.
LCLS Control Group EPICS Collaboration April 27, 2005 Controls Overview April 27, 2005 Outline Goals Status update.
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
22/4/2009 Mark Heron Diamond Light Source Beam Stabilization Feedback System Diamond Light Source Beam Stabilization Feedback System Mark Heron, Head of.
1 BROOKHAVEN SCIENCE ASSOCIATES EPICS Version 4 – Development Plan V4 Team – presented by Bob Dalesio EPICS Meeting October 12, 2010.
PSI Power Supply Controls MedAustron Controls Workshop 1 PR a-FMO-PSI_Power_Supply_Controls.pptx F. Moser - PSI Power Supply Controls 1.
The recent history and current state of the linac control system Tom Himel Dec 1,
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Real time performance estimates of the LHC BPM and BLM system SL/BI.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
2/20/2016J-PARC1 Virtual Accelerator An Accelerator Simulator.
Timing Board FPGA. Use existing IP version until firmware is ported to new FPGA FPGA Existing IP Carrier UCD Digital I/O TSG Timing Board.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Notes from Tom’s visit 1. Controls is under-staffed 2. Common Diagnostics platforms (BPM, FCT, DCCT, BLM,…) 3. Where possible, ‘Smart’ Diagnostics, running.
Fast Global Orbit Feedback for the Australian Synchrotron Eugene Tan Accelerator and Operations 13/12/20101 ACAS Workshop on Accelerator Feedback Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES Control System Overview Bob Dalesio, Control Group Leader NSLS-II CD-3 DOE Review September 30 – October 2, 2008.
Presented by Li Gang Accelerator Control Group
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
SLS Timing Master Timo Korhonen, PSI.
Snr Power Supply Engineer
Commissioning the Fast Orbit Feedback System at SSRF
Fast Orbit Feedback System for HEPS (Cooperation work among all related systems) Dapeng Jin Control System Dec. 12, 2017.
COntrol, Data Access and Communication System for ITER
Timing and Event System for the LCLS Electron Accelerator
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
Fast Orbit Feedback at the SLS
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Goals 2 tier architecture Cell by Cell distribution for the Storage Ring Device Control Conclusion

3 BROOKHAVEN SCIENCE ASSOCIATES Create an Open-Source Platform for Integrated Device Control Support fast orbit feedback at 10 KHz Support event system with 1 nsec trigger resolution Support event system with < 1 psec jitter Support high performance platforms for FOFB ($1K) Support low cost device controllers (<$200) Support Machine Protection < 20 usec response time Work with industry and other labs to produce solutions that work in this network.

4 BROOKHAVEN SCIENCE ASSOCIATES Two Tier Device Control RF Clock Distribution 45 MHz Fiducial Distribution 1 Hz Timing System Device Controller 100 MB ENet Timing System Device Controller 100 MB ENet Timing System Device Controller 100 MB ENet …. VME I/OC EPICS Timing System Cell Controller 100 MB ENet IN VME Interface 100 MB ENet Out 2 GB ENet … VME I/OC EPICS Timing System Cell Controller 100 MB ENet IN VME Interface 100 MB ENet Out 2 GB ENet

5 BROOKHAVEN SCIENCE ASSOCIATES BPM Controller 30 Cells each with 10 BPMs / 6 PSs RF Clock Distribution 45 MHz Fiducial Distribution 1 Hz BPM Controller BPM Controller BPM Controller BPM Controller BPM Controller 100 MB ENET PS Controller PS Controller PS Controller PS Controller VME I/OC EPICS Cell Controller VME Interface VME I/OC EPICS Next Sector Cell Controller VME Interface VME I/OC EPICS Prev Sector Cell Controller VME Interface 2 GBit ENET +T0 + - Settling time on BPMs? +0.0 usecs - BPM to Compute Controller 384 bits = 64 bits * 6 BPMs 4.9 usecs = 384 bits over 100 MBit enet +4.9 usecs - Compute Controllers to each other 10,290 bits = 30 nodes * 384 bits 10.5 usecs = 10,290 bits over 2 GB enet usecs – Compute local matrix 0 usecs usecs - Communcate t Power Supply Controllers 24 = 4 PS * 4 bytes each 3.5 usecs usecs – loop complete settling time for magnets communicate diagnostic waveforms etc… usecs +200 usecs – start again

6 BROOKHAVEN SCIENCE ASSOCIATES BPM Controller Device Controllers needed RF Clock Distribution 45 MHz Fiducial Distribution 1 Hz BPM Controller BPM Controller BPM Controller BPM Controller BPM Controller 100 MB ENET PS Controller PS Controller PS Controller PS Controller VME I/OC EPICS Fast Orbit Feedback VME Interface VME I/OC EPICS Machine Protection VME Interface VME I/OC EPICS Event Generator VME Interface 2 GBit ENET Need to integrate LIbera and RF controllers Passes device inputs throughout network Need to include event data in this data stream Need to include Fast Orbit Feedback into Cell controllers Need to create/integrate power supply controllers Need to create/integrate Machine Protection

7 BROOKHAVEN SCIENCE ASSOCIATES Conclusion A rough design is in place The prototype cell controller is to be developed this year by Larry Doolittle along with NSLS II help 2008 should demonstrate timing, communication throughput, and interface through PMC or PCI 2009 should demonstrate device controllers and work with others to develop specific device controllers We are looking for others interested in this platform to work with us.