CMS FED Testing Update 28-06-2002 M. Noy & J. Leaver Imperial College Silicon Group.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

1 Electronics Simulation in the Photon Transport Monte Carlo Preamp model Receiver/discriminator circuit CAFÉ driver circuit model Examples Summary January.
Lecture 17: Analog to Digital Converters Lecturers: Professor John Devlin Mr Robert Ross.
M. Noy. Imperial College London Calice MAPS Adapter Card Review M. Noy 26 th June 2007.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Status of Oxford Setup Matthew Chalk, Erik Devetak, Johan Fopma, Brian Hawes, Ben Jeffery, Nikhil Kundu, Andrei Nomerotski University of Oxford ( 18 August.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Role and Place of Statistical Data Analysis and very simple applications Simplified diagram of scientific research When you know the system: Estimation.
Department of Information Engineering357 Operation amplifier The tail, large impedance gives high CMRR Mirror as active load. High gain Follower as buffer.
1 Seventh Lecture Error Analysis Instrumentation and Product Testing.
PH4705/ET4305: A/D: Analogue to Digital Conversion
October, 2004CMS Tracker Week1 APV settings at cold temperatures Objective: provide recommendations for APV I2C settings for cold operation, for test beam.
The new E-port interface circuits Filip Tavernier CERN.
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Physics 114: Lecture 15 Probability Tests & Linear Fitting Dale E. Gary NJIT Physics Department.
Oct, 2000CMS Tracker Electronics1 APV25s1 STATUS Testing started beginning September 1 wafer cut, others left for probing 10 chips mounted on test boards.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Uni Bergen:G. Eigen, J. Zalieckas, E. van der Kraaij FZU Prague: J. Cvach, J. Kvasnicka, I. Polák CALICE meeting, Argonne, 19/03/2014.
10/11/2015 Operational Amplifier Characterization Chapter 3.
Generic Approaches to Model Validation Presented at Growth Model User’s Group August 10, 2005 David K. Walters.
RF Cavity Simulation for SPL Simulink Model for HP-SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgement: CEA team, in particular O. Piquet.
LLRF Cavity Simulation for SPL
B.Satyanarayana, TIFR, Mumbai. Architecture of front-end ASIC INO Collaboration Meeting VECC, Kolkata July 11-13, Amp_out 8:1 Analog Multiplexer.
Uni Bergen:G. Eigen, E. van der Kraaij, J. Zalieckas FZU Prague: J. Cvach, J. Kvasnička, I. Polák Linear Collider Workshop, Tokyo 13/11/2013.
25th June, 2003CMS Ecal MGPA first results1 MGPA first results testing begun 29 th May on bare die (packaging still underway) two chips looked at so far.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
ChE 551 Lecture 03 Analysis of Rate Data 1. General Approach Initiate reaction measure concentration vs time fit data to calculate rates 2.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
Lecture 4: Signal Conditioning
CMS FED Testing Update M. Noy Imperial College Silicon Group.
24th October 2003 M. Noy, Imperial College London0 M. Noy FED Project Status.
1 The Link-On-Chip (LOC) Project at SMU 1.Overview. 2.Status 3.Current work on LOCs6. 4.Plan and summary Jingbo Ye Department of Physics SMU Dallas, Texas.
دانشگاه صنعتي اميركبير دانشكده مهندسي پزشكي استاد درس دكتر فرزاد توحيدخواه بهمن 1389 کنترل پيش بين-دکتر توحيدخواه MPC Stability-2.
FED V1 Pulse Shape Issues System Meeting, CERN 14 th -16 th October 2003 M. Noy Imperial College London Pulse Shape Issues for the Tracker FED M. Noy Imperial.
1 UA9 telescope first ideas Rome – 12/3/2010 Mark Raymond –
FED 9U Analog Characterization Stefanos Dris CERN & Imperial College.
1 Level 1 Pre Processor and Interface L1PPI Guido Haefeli L1 Review 14. June 2002.
Predicting the In-System Performance of the CMS Tracker Analog Readout Optical Links Stefanos Dris CERN & Imperial College, London.
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
LKr readout and trigger R. Fantechi 3/2/2010. The CARE structure.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
FED Temperature Measurements: Greg Iles31 March FED temperature measurements –Will components on FED exceed operating temperature in CMS? Analogue.
J. Ye SMU Joint ATLAS-CMS Opto-electronics working group, April 10-11, 2008 CERN 1 Test Results on LOC1 and Design considerations for LOC2 LOC1 test results:
General Tracker Meeting: Greg Iles4 December Status of the APV Emulator (APVE) First what whyhow –Reminder of what the APVE is, why we need it and.
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Jitter and BER measurements on the CuOF prototype G. Dellacasa, G. Mazza – INFN Torino CMS Muom Barrel Workshop CERN, February 25th, 2011.
22/06/2016James Leaver Current FED Tester Status.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
Enhancement Presentation Carlos Abellan Barcelona September, 9th 2009.
MECH 373 Instrumentation and Measurements
(3) Signal Conditioning
vXS fPGA-based Time to Digital Converter (vfTDC)
Differential Op - Amplifier TIM. 1 Introduction 2 Differential Amplifier: 2.1 Input Resistances: 2.2 Differential Gain: 2.3 Common Mode Input: 2.4 Common.
Calorimeter Upgrade Meeting
VeLo Analog Line Status
VELO readout On detector electronics Off detector electronics to DAQ
Optical links in the 25ns test beam
The CMS Tracking Readout and Front End Driver Testing
Sampling Distributions (§ )
Presentation transcript:

CMS FED Testing Update M. Noy & J. Leaver Imperial College Silicon Group

CMS FED Testing Currently: SEQSI LVDS LVTTL DAC Evaluation board UTP Opto- Tx Optical Fibre Opto- Rx I2C master I2C control Coax 8 bit oscilloscope GPIB VME PC LVDS  LVTTL Line driver + (optional) level shift Network I2C slave

CMS FED Testing Picture of the DAC evaluation board DAC Line driver UTP out LVTTL data in, from level converter

CMS FED Testing Picture of the key link components Opto-Tx Opto-Rx I2C cable Single ended output to scope UTP from DAC/line driver Optical fibre

CMS FED Testing DAC scope UTP V out Opto-Tx DAC Evaluation Board Line driver Opto-Rx

CMS FED Testing Signal before the link  200mV (V + -V - =400mV ) differential signal with no offset. higher bandwidth  ringing and faster rise/fall time. Time scale is relative to the scope trigger point on all plots.

CMS FED Testing Signal after the link Single ended, with offset. No ringing but slower rise/fall times

CMS FED Testing Signal noise/jitter after the link Note:no scale on the width of the line. This is an impression of the infinite persistence scope trace => spread unknown. (Measurements are real).

CMS FED Testing Rise time, 10% to 90% of full scale.

CMS FED Testing Fall time 90% to 10% of full scale

CMS FED Testing Linearity: link is being operated in the linear region of the Tx/Rx Settings: x0, x1, x2, x3, x4, x5=0,0,0,0,1 (recommended by CERN)

CMS FED Testing Sample APV25 pair of multiplexed frames with simulated 1 MIP signal

CMS FED Testing Multiplexed APV25 header with zero pipeline address 6 start bits pipeline address (16 bits) 2 error bits 2x12x25ns bits =

CMS FED Testing Zoom in of the 1 MIP signal upon its pedestal Approx: Pedestal value here is 509 lsbs, 4096 levels in 405mV  0.099mV/lsb 1 MIP  4096/8=512 lsbs  Total signal =570+(405/4096)*( ) = *1021=671mV

We attached a heating element and a thermocouple to the laser package and used the following PID equation to stabilise the temperature through a feedback loop. W = P [ (T s - T 0 ) + D d (T s - T 0 ) /dt + I  (T s - T 0 )dt] The temperature was varied between 30ºC and 40ºC in ~1ºC steps. The output of the Rx was recorded after a stabilisation time, for some measurement time. CMS FED Testing Temperature Control

Laser threshold bias current behaves like I th =I 0 exp(T/T 0 ) Which implies  I th  I th  T/T 0 And (after a few lines and other things!)  V out  -R eff G  Rx  l I th  T/T 0 Typical parameter values yield an expected 34.1°C)  V out /  T  mV/°C CMS FED Testing Temperature Measurements

CMS FED Testing Temperature Measurement Results Approximated with a linear fit V=mT+C Where m = -(89.8  1.8) mV/°C and C = (4137  62) mV Good agreement with expected value (of 90.8mV/°C), but some of the parameters are loosely defined

Temperature stabilisation is good, with random fluctuations of the order  0.02°C. There is some unknown systematic error, that does not exceed  0.44°C. Have statistics of 150x500 voltage points and 150 temperature points per temperature setting. Statistical errors are too small to account for the largest random deviation, probably spurious. We could repeat the whole measurement again using smaller T steps, but probably won’t due to time constraints. CMS FED Testing Temperature Measurement Errors

CMS FED Testing Summary Have a complete working single fibre, possible to drive 4 with identical signals using the current Opto-Tx. Possible to obtain a further 2 of the 4 channel prototypes from CERN  complete 12 channels could in principle be driven with identical signals. Dependence of laser operation on temperature is now better understood, and fine temperature control is possible. We feel confident that a system such as the one we have will allow sufficient temperature stability for the fed testing needs. Work is in progress to produce an application specific version of the SEQSI simpler operation longer RAM pipeline clean/synchronous stop from VME possible stepping through

Future Work Have 1 (untested) Opto-Rx emulator to drive the analogue stage of the FED directly over copper (I.e. eliminating the optical link) Verify DAC Linearity: Summer student(?) More thought into a test vectors and their comparison with the FED output CMS FED Testing