Project Highway: Ramp Metering Isaac Quaye Junior Jared Sagaga Junior Emma Hand Sophomore.

Slides:



Advertisements
Similar presentations
Overview of a Timely Publication. Transportations importance has been recognized since colonial times National defense Economic vitality Quality of life.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
1 Innovative Tools October 27, 2011 Chi Mai. 2 Presentation Overview VISSIM Corridors VISSIM Protocol Hours of Congestion.
Transportation leadership you can trust. presented to ITS Georgia 2005 Annual Meeting presented by Kenny Voorhies Cambridge Systematics, Inc. August 29,
Submitted by: Javaneh Noorparvar Civil Engineering, Cal Poly Pomona.
Byron Becnel LA DOTD June 16, Microscopic simulation models simulate the movement of individual vehicles on roads It is used to assess the traffic.
Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott.
Office of Highway Safety Simulations. Purpose of Simulations Evaluation of Vehicle speeds Drivers’ statements Pickup truck sensing diagnostic module (SDM)
Project 3 Agent Smith Proposal Due: April 10 th Project Due: April 20 th.
Interchanges, Arterials, And Networks Last Week. Interchanges Freeway – Multilane highway Ramps and weaves are the same Problem comes in when you have.
3/3/06Michael Dixon1 CE 578 Highway Traffic Operations Freeways Merge Influence Areas.
Project 3 U-Pick – A Project of Your Own Design Proposal Due: April 2 nd (earlier ok) Project Due: April 11th.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
1 1 Incident Management Incident Management Transportation Research Center University of Nevada, Las Vegas UTC Technical Day September 8, 2009.
1 Adaptive Kalman Filter Based Freeway Travel time Estimation Lianyu Chu CCIT, University of California Berkeley Jun-Seok Oh Western Michigan University.
Highways & Transportation I (ECIV 4333) Course Outline 1 The Islamic University of Gaza Faculty of Engineering Highways & Transportation I (ECIV 4333)
3/6/06Michael Dixon1 CE 578 Highway Traffic Operations Freeways Ramps and Ramp Junctions Examples and Special Applications for Merge Areas.
3/6/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 21: Freeway Ramps and Ramp Junctions Diverge Areas.
Project 3 U-Pick – A Project of Your Own Design Proposal Due: Nov 29 th (earlier ok) Project Due: December 8 th.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic Programming Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic.
CE 578 Highway Traffic Operations Freeway Merge and Diverge Segments.
Managing Projects and Clients Senior Consultant Training 23 September 2005.
DESIGN AND EVALUATION OF THE SUMMER UNDERGRADUATE RESEARCH PROGRAM IN GEOSCIENCE AND ENGINEERING (SURGE) Tenea Nelson, PhD Assistant Dean, Office of Multicultural.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Task 4: Pilot Study July 31, 2006 Robert Bertini.
Project 5: Ramp Metering Control in Freeway System Team Members: Faculty Mentor: Isaac Quaye Dr. Heng Wei Junior GRA: Emma Hand Kartheek K. Allam Sophomore.
Project 5: Ramp Metering Control in Freeway System Team Members: Faculty Mentor: Emma Hand Dr. Heng Wei Sophmore GRA: Isaac Quaye Kartheek K. Allam Junior.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
Integrated Corridor Management (ICM)
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System TAC Meeting December 13, 2006 Robert Bertini.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
TRANSPORTATION ENGINEERING Planes, Trains, Automobiles and More Ardrey Kell High School February 23, 2012.
Unit 2: Signs, Signals, and Roadway Markings
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
1 Operations Academy Senior Management Program Next Offering September 16-26, 2008.
Company LOGO Ramp Meters. Company LOGO What are Ramp Meters? Part of NaviGAtor, Georgia DOT’s Intelligent Transportation System (ITS) Also includes electronic.
Traffic Flow Nora Shora Laura Tatsch. Traffic Flow Exploring dynamic vs. static toll pricing in a traffic network simulation model.
For the PowerPoint – under “What We Stand For” –
Project 5: Ramp Metering Control in Freeway System Team Members: Faculty Mentor: Isaac Quaye Dr. Heng Wei Junior GRA: Emma Hand Karteek K. Allam Sophomore.
Capacity and Service to Road Users Task 05: To optimise the capacity of the road network Mike Wilson, Bristol 27 January 2006.
DEPARTMENT OF CIVIL & ENVIRONMENTAL ENGINEERING Proactive Optimal Variable Speed Limit Control for Recurrently Congested Freeway Bottlenecks by Xianfeng.
“First In the Nation” Diverging Diamond Interchange IS 44 and MO 13 - Springfield, MO Joseph C Rickman, PE, ACTAR District Traffic Engineer MoDOT – Springfield.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Project 1 : Qualifying and Quantifying Noise from Different Types of Guns (Vehicles) Brad Keserich, Senior, Computer Engineering College of Engineering.
Towing Professionals In Highway Scene Management.
SHRP2 Project C05: Final Report to TCC Understanding the Contribution of Operations, Technology, and Design to Meeting Highway Capacity Needs Wayne Kittelson.
Expressway Driving Legacy High School Drivers Education.
(is it necessary?) By: Tim Torrini per. two Ramp meters are the “stop and go signals located at the entrance ramps of freeways to regulate the amount.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Use of the Probability of Breakdown Concept in Ramp Metering Clark Letter Dr. Lily Elefteriadou October 30, 2012 University of Florida Transportation Research.
Performance Evaluation of Adaptive Ramp Metering Algorithms in PARAMICS Simulation Lianyu Chu, Henry X. Liu, Will Recker California PATH, UC Irvine H.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Brian Choi, Emmanuel Peters, Shou-pon Lin E6778 March 7, 2012.
Write down what you know about man reaching the moon.
Noah likes ramp meters And you should too Introducing Ramp Meters Ramp metering - the process of facilitating traffic flow on freeways by regulating.
Traffic Signals NV Driver Education Curriculum Unit 2: Signs, Signals, and Roadway Markings Presentation 2 of 3.
Delaware River Port Authority VISSIM Presentation Presented by: Michael Howard P.E. Senior Engineer Delaware River Port Authority.
Corridor Management Planning in California Jeff X. Ban CCIT, UC-Berkeley Rensselaer Polytechnic Institute (RPI)
Higher PE 2010/11 Introduction. Learning Outcomes By the end of this lesson you should all: 1.Be aware of the timeline for higher PE 2.Have recapped the.
Short-term Travel Time Prediction with Neural Network Models Wonjae Jang Civil & Environmental Engineering ECE 539 Term Project.
Dynamic Traffic Management Traffic control Prof. Dr. Henk J. van Zuylen 汉克. 范少伦 教授 荷兰 德尔夫特理工大学.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Unit 5 The American Revolution Timeline
Internal Assessment IB Biology Year
How will the new courses be assessed?
Challenge Based Learning
Ramp Metering Katie Schueler.
Project 7: Modeling Social Network Structures and their Dynamic Evolutions with User- Generated Data from IoT REU Student: Emma Ambrosini Graduate mentors:
Project 5, Fluid Flow Separation Control
Sponsored ByThe National Science Foundation Grant ID No.: DUE
Presentation transcript:

Project Highway: Ramp Metering Isaac Quaye Junior Jared Sagaga Junior Emma Hand Sophomore

Project Outline What are ramp meters? - Traffic controls that regulate traffic flow entering a highway - Reduce congestion, travel time, accidents - Increase freeway speeds around on-ramp - Two ramp meters on I-74 - Minnesota 1

Project Outline Goals  Gain background knowledge and training for research project  Investigate  Effectiveness of ramp meter placements  Number of installations needed on highway  Successfully run simulations on VISSIM  Present completed project and findings 2

Project Outline Tasks  Equipment training and VISSIM use  Attend workshops and seminars  Read materials  Complete progress reports 3

Project Outline Timeline Week 1-2: Ramp metering training, learning VISSIM, methods of evaluation and setting up research structure Week 3: Gather data, process and analysis Week 4: Use acquired data to develop PowerPoint, poster, and reportsr Week 5- 6: Create and run ramp metering simulation model in VISSIM Week 7: Complete final presentation, report, and summary 4