Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI Dubna, May 19-22, 2009
Dubna GSI, Protvino, Dubna Dubna, Protvino Moscow Kharkov St.Petersburg 7 institutes 3 countries Modules assembly Components Ladder assembly Radiation tests (SPb+?) In-beam tests GOAL:to organize an East Slavic cluster of teams for production of the CBM and MPD STS The Consortium Structure
The Starting Point Dubna, May 19-22, 2009
The Consortium tasks for 2008 Technical task definition for CBM STS ladder section (ALL) A pilot batch of Russian-made CBM STS Si sensors (SINP) Design and production of specific mechanics sample elements Development n-radiation site the CBM STS components (KRI Cyclotron Lab, SPb) Task Force interaction improvement (ALL) Infrastructure development of the Consortium sites (KRI,JINR) Support of microcable production team in Kharkov via JINR-GSI cooperation Dubna, May 19-22, 2009
CBM STS Ladder: Steps to Technical Task Definition (ALL) To agree of ladder design To agree of sensor topology To agree of connection to FEE Solution AGREED : flat semi-tiling of sensors on the 3D CF support ladder Dubna, May 19-22, 2009
CBM STS Ladder: Steps to Technical Task Definition To agree on central ladder design To agree on hybrid Back End Dubna, May 19-22, 2009
CBM STS Sensors: Pilot Batch (M.Merkin) Manufacturer RIMST– Zelenograd, Moscow region Active area x 60.0 mm2 Strips pitch on both sides of detectors - 58 µ Stereo angle - ±7.5degrees Number of strips on each side (8 readout chips) With bondning/test pads topology suitable for TAB bonding (standard for the whole CBM STS !) Status : Draft of the contract (three mile stones!) is ready, pending on baby-sensors photomask files accomplishment (Merkin). Expected time for the first batch is 30 April 2010 Dubna, May 19-22, 2009
CBM STS: CF sample prototypes (S.Igolkin) 1/2 Technical drawings of the 4-th station have been accomplished but found not to fit the magnet size ( currently passed for the ANSI calculations) Jigs and accessories (vacuum oven for the CF ladder processing) are under design and production Imitating samples for the 3-sensor module and sensor support pins manufactured and tried for the rigidity Dubna, May 19-22, 2009
CBM STS: CF sample prototypes (S.Igolkin) 2/2 Dubna, May 19-22, 2009
Radiation test KRI, SPb,RF (V.Jakovlev & S.Lashaev, KRI D.Karmanov, SINP ) 17 MeV pBe->n or DD->n? From 9Be(p,n)9B (g.s.) reaction; From 9Be(p,n)9B* reaction; 9Be + p 4He + 5Li + n – 3.5 MeV 8Be + p + n – 1.7 MeV 2 4He + p + n – 1.6 MeV Dubna, May 19-22, 2009
Task Force Interaction Improvement 1/3 To keep the teams having a clear joint goal each year (demonstrator test policy with tests in Protvino) To develop the infrastructure of the key sites (restoration of rooms and procurement of capital equipment) To Organize regular work Work Meetings Dubna, May 19-22, 2009
Task Force Interaction Improvement 2/3: In-beam tests in Protvino Thanks Thanks to Yuri Zaitsev, ITEP for funding! Dubna, May 19-22, 2009
Task Force Interaction Improvement 3/3 2-nd Work Meeting of Consortium in Protvino June, d Work Meeting of Consortium in Sortavala, Karelia, June 1-4, 2009 Dubna, May 19-22, 2009
2008 Achievements The Consortium chain started to operate as a whole Mechanical design of the ladder almost accomplished n-irradiation 20 MeV cyclotron evolved Preparations for prototype manufacturing KRI(CF production, bench for the C-I-V measurements), JINR (Assembling&Certification) First stage of organization of the CBM STS in-beam testing Protvino realized Additional funding for Kharkov and Dubna teams acquired for 2009 via JINR-GSI scientific cooperation Grants for the 3-d Work Meeting gained from RF focused funding agencies (ISTC) Dubna, May 19-22, 2009
Tasks to remedy in 2009 The mismatch of the STS size and the clearance of the Magnet n-XYTER FEBs supply for the JINR team CF Prepreg supply for Igolkin Mold manufacturing for Igolkin Other problems could be resolved locally Dubna, May 19-22, 2009
Basic Problem: Keep going on grants only Dubna, May 19-22, 2009
2009 Tasks and their sharing Demonstrator 1: A 3-sensor module prototype Organization of in-beam tests in Protvino, November, 2009 Formulating irradiation plan for KRI Cyclotron team for 2009 Testing bench with collimated Ru-106 JINR to operate with n- XYTER FEB read-out Production of CF parts for the full ladder prototype Cooling system definition work plan (additional funds application) Analogue long cable conceptual bench tests based on FEB and existing Demonstrator-0B and n-XYTER FEBs Attraction of new members to Consortium (Czech Republic for sensor production?) Dubna, May 19-22, 2009
Thank you for your attention! Acknowledgments to all many Consortium members not mentioned! Dubna, May 19-22, 2009