[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop (19.03.2009) Consolidation and major changes that have impact on the powering circuits.

Slides:



Advertisements
Similar presentations
. TYPICAL SUPERCONDUCTING MAGNET TEST SEQUENCE. PREPARATORY TESTS AT ROOM TEMPERATURE Lyre Test: Simulate Effect of Thermal Contraction in Cold condition.
Advertisements

Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
February 2009 Summary of Chamonix 09 Steve Myers.
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
For more info:
AT-MEL-MI Hardware Commissioning Review, , Suitbert Ramberger 1 The Normal Conducting Magnets and their Circuits Suitbert Ramberger, AT-MEL-MI.
Readiness of test stations for design validation Marta Bajko on behalf of the TE-MSC TF team CERN, 11 th December 2014 QXF design review, CERN.
R.Schmidt, Chamonix How do we keep track of upgrades / changes? Abstract Layout and electrical circuits of the LHC machine are well documented in.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Cryogenics Fault Tree A. Niemi & E. Rogova. Contents 1.Introduction of the current tree structure 2.Failure rates observed in 2015 failure data 3.Unsure.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
B. Todd, A. Apollonio, M. Kwiatkowski, R. Schmidt, S. Wagner, J. Walter a Risk-Based Approach 1v2 to Machine Protection Systems.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
S A Griffiths CM42 June 2015 Electrical & Control.
HL-LHC IT STRING and Series test of SC link
Cryogenic behavior of the cryogenic system
Powering LHC magnets version 30/3/2007.
Status of LHC installation & New Installation Schedule
The LHC - Status Is COLD Is almost fully commissioned
Consequences of warming-up a sector above 80 K
Powering the LHC Magnets
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
Powering from short circuit tests up to nominal
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Block 4 and Cluster D - Safety
Cryostat design Mechanical design: Thermal screens: Specifications:
TEST PLANS for HL LHC IT STRING
+ many slides from various colleagues (KH, Rudiger, Paul, …)
Hardware Commissioning
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits

I. Major changes Type of work / Type of sectorELQAELQA CRYOCRYO QPSQPS PCPC PICPIC PTPT Systems/ PT Details 1New overpressure relief valves installation (warm sectors) NYNNNN Will be done during PT  impact on test schedule 2New QPSYaYaNYNNYCommissioning to be integrated in the PT procedures 3Magnet exchangedYNNNNYRe-commission all the circuits concerned 4Bus Bar repair in connection cryostat (risk of shorts)  S56 (&S34 preventive t.b.c.) YNNNNYAdapt procedures (check circuits integrity) 5S34 (ARC+LSS+IT)  (special sector) YYYYbYbNYS34 is a new sector to be fully commissioned 6S12 & S67 (ARC+LSS+IT)  1+2+3YYYNNYRe-commission all the circuits concerned 7S56 (ARC+LSS+IT)  1+2+4YYYNNYAdapt procedures + re-comm. mains 8S23 & S45 (ARC T<100 K)  2YNYNNYRe-commission main circuits 9S81 & S78 (T < 5 K)  2YNYNNYRe-commission main circuits QPS Individual System Test (IST), PC IST, PIC IST PT: Powering Test a. Only Mains; b. PC Short Circuit Heat Run because of Sep19 2 May go > 100 K May go ~ 100 K IST

Miscellaneous Type of work / Type of sectorELQAELQA CRYOCRYO QPSQPS PCPC PICPIC PTPT Systems/PT Details 10Relocation of UPS and electronics from UJ76 to the TZ76 (PIC, WIC, PC, UPS) NNNNYYNormal procedures for PIC 11AUG issues + non conformities  f(issue, non conformity) NNYYYNAdapt procedures to test that everything is conform (H. Thiesen talk) 12S34 missing corrector in SSS, should be documented in the as- built database Systems concerned: FIDEL (TF generation), QPS (inductance calculation), DB, drawings 13Field quality of the newly installed magnets should be extracted using WISE to provide ABP with a up-to- date status of the machine Systems concerned: FIDEL must be updated, ABP simulations 3 IST

PC Type of work / Type of sectorELQAELQA CRYOCRYO QPSQPS PCPC PICPIC PTPT Systems/PT Details 14 Short Circuit Test (Heat Run) in S34 NNYYNN 15Installation of DC contactors for 8 RQS and for 8 RTQX1 power converters to improve protection NNNYNYCircuits concerned/Normal procedures (PIC, PCC, PNO) 16Water Cooled Cables repairs (UA63,UA43) YNNYNYCircuits concerned/Adapt procedures (cables IST + short circuit test on PCs) 17Exchange of DC cables for circuits powered from UJ33 (RQT4/5.R3) YNNY WICWIC YCircuits concerned/Normal procedures (+heat run) 18Desintallation/reinstallation of ALICE correctors YNNY WICWIC YCircuits concerned/Full commissioning 4 IST

PIC / WIC Type of work / Type of sectorELQAELQA CRYOCRYO QPSQPS PCPC PICPIC PTPT Systems/PT Details 19Modifications of the PIC (BIC interface modification - lab test) NNNNNYCircuits concerned/Normal procedures for PIC 20Modification of the WIC (Fast Module activation) NNNN WICWIC YCircuits concerned/Normal procedures 21Software interlock ACCESS-PICNNNNYNPIC-SIS-ACCESS dedicated test 5 IST

CRYO Type of work / Type of sectorELQAELQA CRYOCRYO QPSQPS PCPC PICPIC PTPT Systems/PT Details 23Thermo switch a (thermo switches on top of leads to mitigate the risk associated with soft. interlocks) NNNYYN 24Modification of the cryogenic link for 600A circuits powered from UJ33 YYNNNYCircuits concerned/Normal procedures a Thermo switches will be installed everywhere but only connected for the high current circuits in s78 and sector 81 (other later, due to short time for cabling) 6 IST

CRYO Type of work / Type of sectorELQAELQA CRYOCRYO QPSQPS PCPC PICPIC PTPT Systems/PT Details 25Consolidations on Stand-alone, priority: MQY and MQM, the level gauges will be replaced to improve the control of the Helium level NYNNNN 26Cryogenic cabling NYNNNN 27Repair of Y Line, in sectors 12 and 34 (S78 & S81if warms) NYNNNN 28Installation of Cu strips + thermometers in ITL5 and IR (outside of the cold mass in the insulation vacuum) NYNNNN 29Modification to DFBsNYNNNN Install additional pressure switches for the dry air system Improve LHe level regulation for DFBAC LCM Improve the configuration of the safety valves discharge outlet Add heaters on top plates of DFBXs to avoid heavy condensation 7 IST

New relief valve scheme Chamonix 09 V. Parma Quench valves on cold mass circuit QV  DN50 Insulation vacuum pressure relief devices SV  DN90 Vacuum barrier 8

Types of valves DN200 Chamonix 09 V. Parma Replacing clamps with spring-loaded clamps 9

nQPS Suspicious splice detection (UTH = 300 µV, 10 s) Detection of symmetric quenches Voltage to earth detection K. Dahlerup-Petersen 10

Exchange of DC cables for circuits powered from UJ33 (RQT4/5.R3) 11

Exchange of DC cables for circuits powered from UJ33 (RQT4/5.R3) 12

Exchange of DC cables for circuits powered from UJ33 (RQT4/5.R3) 13