Interconnections Cryogenic Extensions and DSL Ivo Slits - AT/MCS 08.11.2006.

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
ColUSM #51 30 th January, 2015 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, Q. Deliege, V. Baglin, F. Savary.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Review of the Cryogenic By-pass for the LHC DS collimators Ph. Lebrun on behalf of the Review Committee CERN, Kjell Johnsen auditorium 26 May 2011.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
CRYOGENICS AND POWERING
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
HC review, A. Perin, 12-MAY DFB Project LHC hardware commissioning review May 2005 Hardware commissioning of the DFBs and DSLs and connection.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Interconnection work for the the QRL cryogenic extensions Ivo Slits - AT/CRI
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
CHAMONIX XV QRL installation and first experiences of operation G. Riddone on behalf of the QRL team AT/ACR-cd Acknowledgements to AT/ACR-op and AT/ACR-in.
AT-ACR B. VULLIERMECSOC Meeting 29 September Cryogenics for LHC Test Benches Safety Aspects Overview of the Test Station Overview of the Operation.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
LHC Machine Advisory Committee Meeting no.19 QRL status 16 June 2006 G. Riddone, AT-ACR On behalf of the QRL team.
A. Perin TE-CRG, 06 April LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs A. Perin, TE-CRG.
Overview of the ESS Linac Cryogenic Distribution System
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
B10 D19 Diode Repair March 29, 2016 Gary McIntyre.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
SIS 100 Vacuum chamber Recooler String system Components
Superconducting Links R2E and Avalilability Workshop
Project overview, boundary conditions, configuration, cost & schedule
LBNF CAD models, Drawings and Component list
IT-4189 Supply and installation of a cryogenic distribution system
LEP cryostat Procurement strategy and plans
LS1 Committee January 24th, 2014
Cryostat design Mechanical design: Thermal screens: Specifications:
Transfer lines status 10/11/2016 O.Crespo-Lopez.
Cryogenics for sc links, a short update
Warm structure requirements :
Flexible lines assembly
Y. Muttoni - J.P. Corso TS Workshop Archamps
Parts exchange for HL-LHC AUP Q1&Q3
The 11T cryo-assembly: summary of design and integration aspects
K. Foraz on behalf of OSS members
Cryostat design Mechanical design: Thermal screens: Specifications:
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
LHC Machine Advisory Committee Meeting no. 19, June 2006 DFB status
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Interconnections Cryogenic Extensions and DSL Ivo Slits - AT/MCS

Ivo Slits, AT/MCS-IC, Introduction A cryogenic extension allows to link the QRL jumpers to different clients (DFBA, DFBL, Q6, ACS). The diameter of the cryogenic extensions is mm QRLXD-Q6 - 8R - QRLXE-DFBLA - 1L - QRLXH-Cavité - 4L - Q6 Jumper QRL DFBL Cavité Jumper QRL

Ivo Slits, AT/MCS-IC, Introduction They are composed of several interconnection pipes (between 4 and 9 pipes) with different internal diameters (from 10 mm to 80 mm) Interface of the cryogenic extension element QRLXD (sector 8-1) Interface of the cryogenic extension element QRLXE (sector 8-1)

Ivo Slits, AT/MCS-IC, QRLXE with DFBLA (1L) DFBLA Jumper QRL MLIPersistant ring MLI

Ivo Slits, AT/MCS-IC, Overview of cryogenic extensions

Ivo Slits, AT/MCS-IC, Activities and responsibilities Design and Manufacturing of elements and external supports => AT-ACR / Airliquide Installation of ext. support and elements => AT-ACR Interconnection drawings, some IC components (welding rings and MLI), tooling and interconnection activities in tunnel with IEG => AT-MCS Leak-testing => AT-VAC Final testing (pressure/cold test) => AT-ACR

Ivo Slits, AT/MCS-IC, Flowdiagram interconnections cryogenic extensions

Ivo Slits, AT/MCS-IC, Status Note: QRLXA and QRLXC are not accessible due to electrical tests and cabling QRLXJ, QRLXK, QRLXL -> QRL not released in sector 1-2

Ivo Slits, AT/MCS-IC, DSL (superconducting link) DSLA (1L)

Ivo Slits, AT/MCS-IC, DSLC (point 3) Interconnections: 2x interne dans la DSLC 1x avec DFBLC 1x avec DFBAF

Ivo Slits, AT/MCS-IC, Drawing Q5/Q6-DSL

Ivo Slits, AT/MCS-IC, Drawing Q4-DSL

Ivo Slits, AT/MCS-IC, Drawing DFBL%-DSL (%=A,B,D,E) Réalisation de plan en cours 12 x 600A

Ivo Slits, AT/MCS-IC, Drawing DFBL% (internally) - DSL (%=A,B,D,E) 9x 6kA 2x 4kA

Ivo Slits, AT/MCS-IC, Drawing DSLC internally 48x 600A Note: feedthrough for voltage taps to add

Ivo Slits, AT/MCS-IC, Drawing DSLC - DFBLC

Ivo Slits, AT/MCS-IC, Activities AT-MCS Interconnection drawings (support TS-MME); Procurement of interconnection components (sleeves, flanges, MLI, electrical insulation) except for plug (supply AT-ACR); Procurement tooling; Realisation of DSL interconnections with magnets/DFBs in the tunnel.

Ivo Slits, AT/MCS-IC, Activities in the tunnel

Ivo Slits, AT/MCS-IC, )Interference with supports of vacuum chambers -> AT-VAC will do modifications 2)Support for DSL- flexible that will be fixed to the support of the vacuum chambers (AT-MCS) or individual support. 3)VAB supports are adapted to pass the DSL-flexible 4)Interference between DSL flexible and support BPTX at 5R. AB-BI will do the modification. Note: The interconnection DSL/magnet shall be done before the installation of VAB supports and vacuum chambers in the adjacent zone. Integration

Ivo Slits, AT/MCS-IC, Planning interconnection drawings

Ivo Slits, AT/MCS-IC, Planning Q6L1-DSL Some delay due to 7-8