Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University.

Slides:



Advertisements
Similar presentations
System Administrator Roles in Supporting Site Customizations Lynn Ritger Software Integrations Coordinator, FASTER Asset Solutions.
Advertisements

3 Oct Cost and Schedule Update Craig Ogilvie, Iowa State University Analysis of system risks Update schedule  Critical path.
1-2 Training of Process FacilitatorsTraining of Coordinators 3-1.
Software Engineering Institute Capability Maturity Model (CMM)
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
FVTX Power and cabling – a work-in-progress Task 1.0 – Pre-populate the Racks (Boose/Lenz/Jimmy) Low Voltage Racks2 (on order) Bias Voltage Rack1 (shared.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Effective Methods for Software and Systems Integration
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Coordinating the IT in ITS Galen McGill, PE ITS Manager August 18, 2009.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
SUKESHI MEHTA COORDINATOR, CHEMICAL SAFETY OFFICE OF RADIATION, CHEMICAL & BIOLOGICAL SAFETY FRIDAY OCTOBER 3 RD,
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
Columbia University IN THE CITY OF NEW YORK ROC3' / preproduction ROC Design Status E.J. Mannel StriPixel Review October 1, 2008.
FVTX Review Nov FVTX Review Homeworks. FVTX Review Nov When is Project Complete; how will it be determined?
Robert Pak 1 DOE VTX Review June 2, 2009 Mechanical Integration & Safety Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
The IT Quality Assurance FDA Validation Specialists Phone: 877-MGD-TEST ( ) n n n n Web Site:
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
1 1/27/2011 PHENIX WEEKLY PLANNING 1/27/2011 Don Lynch No Meeting Today Lab Closed due to 2011 Snow Storm # 7.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
1 3/3/2011 PHENIX WEEKLY PLANNING 3/3/2011 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
Robert Pak, FVTX Annual Review Nov Mechanical Integration WBS Robert Pak Brookhaven National Laboratory.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
Robert Pak, FVTX Annual Review, Nov WBS Mechanical Integration Personnel: Walt Sondheim: Mechanical Project Engineer Don Lynch: PHENIX Chief.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
CSC 480 Software Engineering Team Issues. Essence of a Successful Team To be successful, teams must  Plan their projects  Track their progress  Coordinate.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Huntsville City Schools Centralized Registration
WBS 1.03 Readout Systems Scope, Cost and Schedule
GLAST Large Area Telescope:
Process for Organising Software Development Activities
Ian Evans SSRL Safety Office
11 iii. Define management and supervision roles and responsibilities
GLAST Large Area Telescope:
Presentation transcript:

Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University

IN THE CITY OF NEW YORK 02/12/07E.J.Mannel2 Electronics Engineer Responsibilities Coordinate Electronics Integration into PHENIX Coordinate Electronics Integration into PHENIX Work with PHENIX DAQ group developing: Work with PHENIX DAQ group developing: On-line software and system control On-line software and system control Run procedures Run procedures Run databases: (Thresholds, Voltages, etc) Run databases: (Thresholds, Voltages, etc) Coordinate integration with VTX detector Coordinate integration with VTX detector

Columbia University IN THE CITY OF NEW YORK 02/12/07E.J.Mannel3 Electronics Engineer Responsibilities Oversight for electronics development Oversight for electronics development Schedule regular sub-group meetings to review status of electronics development. Schedule regular sub-group meetings to review status of electronics development. Schedule and run reviews of electronics designs prior to pre-production and production fabrication- based on VTX model. Schedule and run reviews of electronics designs prior to pre-production and production fabrication- based on VTX model. Work with Electronics subsystem manager to resolve time critical issues and ensure that project is “on schedule” Work with Electronics subsystem manager to resolve time critical issues and ensure that project is “on schedule” Work with PHENIX Management to schedule all required PHENIX/BNL safety reviews Work with PHENIX Management to schedule all required PHENIX/BNL safety reviews

Columbia University IN THE CITY OF NEW YORK 02/12/07E.J.Mannel4 Electronics Engineer Responsibilities Work with Subsystem managers to develop Q/A procedures and Benchmarks: Work with Subsystem managers to develop Q/A procedures and Benchmarks: Assist developing Q/A plans for pre-production and production modules Assist developing Q/A plans for pre-production and production modules Verify that electronics meets all PHENIX DAQ requirements Verify that electronics meets all PHENIX DAQ requirements Assist with developing and scheduling benchmark tests Assist with developing and scheduling benchmark tests

Columbia University IN THE CITY OF NEW YORK 02/12/07E.J.Mannel5 Electronics Engineer Responsibilities Assist Mechanical Engineer and Integration manager with Electro-mechanical integration Assist Mechanical Engineer and Integration manager with Electro-mechanical integration Electronics mounting: Electronics mounting: Enclosure Enclosure IR Region IR Region Rack Room Rack Room Signal and Power cabling Signal and Power cabling Interlocks and safety issues Interlocks and safety issues

Columbia University IN THE CITY OF NEW YORK 02/12/07E.J.Mannel6 Electronics Engineer Responsibilities Power systems. Power systems. Work with electronics subsystem group and PHENIX engineering group to design and implement low voltage and bias voltage systems. Work with electronics subsystem group and PHENIX engineering group to design and implement low voltage and bias voltage systems. Work with the electronics subsystem, the VTX group, and PHENIX engineering group to develop and implement a global grounding plan for the VTX/FVTX detectors. Work with the electronics subsystem, the VTX group, and PHENIX engineering group to develop and implement a global grounding plan for the VTX/FVTX detectors.

Columbia University IN THE CITY OF NEW YORK 02/12/07E.J.Mannel7 Electronics Engineer Responsibilities Documentation Documentation Work with electronics subsystem group to develop and maintain necessary documentation necessary to build, run and maintain the FVTX electronics Work with electronics subsystem group to develop and maintain necessary documentation necessary to build, run and maintain the FVTX electronics Work with project manager and deputy manager to ensure that all work meets ES&H requirements. Work with project manager and deputy manager to ensure that all work meets ES&H requirements. Work with project manager and deputy project manager to provide documentation and presentations for reviews. Work with project manager and deputy project manager to provide documentation and presentations for reviews.

Columbia University IN THE CITY OF NEW YORK 02/12/07E.J.Mannel8 Conclusions Close Oversight of FVTX integration necessary Close Oversight of FVTX integration necessary Closely coupled with the VTX detector Closely coupled with the VTX detector Tight space constraints with in the PHENIX IR Tight space constraints with in the PHENIX IR E.J. Mannel (Columbia University) currently assigned this task. E.J. Mannel (Columbia University) currently assigned this task. Currently has similar role for VTX project Currently has similar role for VTX project Has working knowledge of electronics issues related to the VTX/FVTX detectors Has working knowledge of electronics issues related to the VTX/FVTX detectors Has working relationship with associated VTX/PHENIX groups Has working relationship with associated VTX/PHENIX groups