Lyon Gantry Status CERN 15 Sept. 2003 D. Contardo Calibration Plates and Tools Readiness for production.

Slides:



Advertisements
Similar presentations
Production Summary Tony Smith (Production Coordinator)
Advertisements

23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
ATLAS Module building at Glasgow
Module Production Brussels Ê Problems with vacuum chambers in plate solved 4 Almost all plates back in Brussels (repaired in Aachen) Ë Problem with rotation.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Tracker Upgrade Week –Sensors Meeting Sensor Production 24. July 2014 Marko Dragicevic.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Situation with industry
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Thursday Sept 17, 2009CALICE week IPN Lyon1 EUDET Module Plans of integration and assembly Julien Bonis SLAB assembly : Process phases.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Status Brussels GANTRY Ê New measurements of pin positions 4 using short pins rather than long ones 4 improved the precision Ë Cross-check of precision.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
VELO Replacement Girish Patel University of Liverpool.
Status Brussels GANTRY
Status Brussels GANTRY
Vienna Module Production
CMS Perugia Modules Production Review
TEC Module Production Overview
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Module Production in Brussels
OGP Surveying & DB Entry
CMS Perugia Gantry Status Report
L.Fiore Gantry Meeting during the CMS TK week
Module Production in Brussels
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Presentation transcript:

Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production

A calibration was performed in May with the calibration plate re-measured on the Karlsruhe Mitutoyo at 21°. 8 R4 modules without hybrids where produced with this calibration within the specs (see DB) despite a not optimized teta calibration due to a Z-motor crash. The 4 assembly plate positions were used for the first time and it seems possible to correlate the precision with the position (leaving room for optimization of the calibration). Since then, the teta calibration has been improved. The 8 modules have been measured in Karlsruhe and in Aachen, we expect to re-measure the modules on the gantry and use all the results to possibly improve the calibration. Lyon Gantry : Calibration

Storage plates : - R1N, R1S, 2 x R4 and 2 xR7 available Assembly plates : - 2 x R4 available : 1 qualified, 1 to be measured - 1 x R7 available, qualification in progress; 3 x R7 waiting for surface milling - R1N, R1S, surface milling in progress Hybrid tools : - Available for all assembly plates (to be tested one by one) Lyon Gantry : Plates and tools

(not including possible design changes) R4 modules : Full procedure (4 modules) ready to be tested material available : 2 frames, 6 Hybrids, 34 sensors R7 modules : Full procedure should be ready for test end of this week material available : 3 frames, 3 hybrids, about 40 sensors of each type R1N, R1S modules : Plates should be ready end of the week, procedure for test end of the month material available : 2 R1N + 1R1S frames, 2 R1N + 2R1S hybrids, 27 sensors Lyon Gantry : Readiness for production

Other aspects : Vacuum for glue curing to be finalized Test of conductive glue on gantry to be done (performed by hand in the mean time) All plates should be ready by the end of September Thorough evaluation of all plates and tools will take one month Only few transport supports (R4) and old design boxes are available Conclusion : Production for R4 modules is ready to start, for R7, R1N, R1S it should be ready to start before the end of the month (priority to R7). Production will probably start at low rate (20 modules per week) to reach final yield beginning of next year. Lyon Gantry : Readiness for production