1 S1Global Experiment Writeup Outlining WIP 20110902A N.Toge +

Slides:



Advertisements
Similar presentations
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
Advertisements

EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
R&D on Cavity Integration and Test H. Hayano,
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
1 S1Global Experiment Writeup Outlining WIP B J. Kirby, R. Paparella, W.-D. Moller, N.Toge +
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
1 LCWS10 in Beijing DRFS Development (S. Fukuda) 27/03/2010 DRFS Development KEK S. Fukuda Introduction : DRFS R&D Plan Talks concerning with DRFS in LCWS10.
Control configulation for S1G module operation H. Hayano version 1.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
The ILCTA_MDB Horizontal Test Stand for SRF Cavities Andy Hocker FNAL-TD AEM, 25-JUN-2007.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
LCWS08 (Nov.18, 2008) 18/11/ Proposal of Distributed RF-source Scheme (DRFS) Shigeki Fukuda (KEK) Introduction Consideration of the cost Possible.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
E. KAKO (KEK) 2011' May 15 S1-Global Test 1 Fact Test Schedule of S1-Global Cryomodule (June, 2010 – Feb. 2011)
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
Status of KEK STF-HLRF S. Fukuda KEK. October 1 HLRF KOM S.Fukuda 2 Stuffs of HLRF&LLRF(RF group in KEK Linac team) Leader S. Fukuda Modulator M. Akemoto,
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
E. KAKO (KEK) 2010' April 20 meeting Global Design Effort 1 Eiji Kako (KEK, Japan) Cavity Test Plan in S1-Global Cryomodule.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
28/Jul/ Test Results of the International S1-Global Cryomodule Kirk.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
On S1Global Writeup S1G Writeup Meeting Nobu Toge 1.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
TDR Snapshot Review SCRF in TDR1 and TDR2 K. Yokoya
Recent Result for the STF-2 Cryomodule Operation
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
Meeting for S1-Global module design Cryomodule and Cryogenics
S1-G Webex meeting Global Design Effort
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
XFEL cavities and cryomodules measurements at AMTF
WG3: Main Linac SCRF(cavity,cryomodule)
IHEP Cryomodule Status
Construction and First Coo-down Test of cERL Injector Cryomodule
FRIB summary of performance degradation - VTA to cryomodule
TTC meeting, Milano Global Design Effort
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

1 S1Global Experiment Writeup Outlining WIP A N.Toge +

Chapter TitleContributorEditor 1PrefaceYamamotoToge 2IntroHayano, Jim, RoccoToge 3CavityTug, Dennis, KakoJim, WD 4CouplerTug, Dennis, KakoJim, WD 5TunerRocco, KakoRocco 6CryomodulePaolo, Serena, OhuchiRocco 7Cold mass assyTug, Kako, OhuchiJim 8CryogenicsNakaiToge 9HLRFFukuda, NantistaToge 10LLRFMichizonoToge 111-cavity operationKirk, Yuri, Dennis, RoccoToge+ 12Multi-cavity operationKirk, Yuri, Rocco, ToshiToge+ 13Cryomodule perf.Ohuchi, Peterson, NakaiToge 14DRFS operationToshi MatsumotoToge 15AlignmentHayano, TsuchiyaToge 16SummaryHayano, Jim, RoccoToge 2

1. Preface Contributor: A.Yamamoto Editor: Toge 3

2. Introduction Contributor: Hayano, Jim, Rocco Editor: Toge Outline below is Toge’s invention, not examined yet by Hayano: 1.Scope of experiment –Layout –Short system description –Goals 2.Job sharing 3.Schedule / Time evolution 4

3. Cavity Contributor:Tug, Dennis, Kako Editor: Jim, WD Below is what Toge rec’ved from Kako (for TELSA-type and TESLA- like) 1.Cavity design 2.Cavity fabrication 3.Surface preparation 4.Vertical test results 5.Joining with He jacket 6.Shipping 5

4. Coupler Contributor: Tug, Dennis, Kako Editor: Jim, WD Below is what Toge received from Kako (for TTF-III and STF-2) 1.Coupler design 2.Coupler fabrication 3.Preparation for assembly 4.Conditioning at test stand 5.Conditioning in cryomodule at room temperature 6

5. Tuner Contributor: Rocco, Kako Editor: Rocco Below is what I received from Kako (for Blade, Saclay-type and Slide- jack) 1.Tuner design 2.Tuner fabrication 3.Tuner assembly 4.Tuner performance in low-power RF test, stroke, response, vibration modes…. 7

6. Cryomodule Contributor: Paolo, Serena, Ohuchi Editor: Rocco 8

7. Cold mass assembly Contributor: Tug, Kako, Ohuchi Editor: Jim 9

8. Cryogenics Contributor: Nakai Editor: Toge 1.2K cryogenics system at STF –Generation of 2K superfluid helium –Schematic diagram of 2K cryogenic system –STF plan 2.Upgrade of cryogenic system for S1-G –Additional vac pumps for increasing the cooling cap at 2K –PC-aided control and data acq system for long-term operation 3.Operation of cryogenic system –Cool-down curves –Warm-up curves 4.Summary –2 wks for cool-down of S1-G CMs –Stable operation –Sufficient cooling cap for keeping cavities at 2K 10

9. HLRF Contributor: Fukuda, Nantista Editor: Toge 1.General description of HLRF at S1G 2.RDR-type configuration –Overview –Specs for modulators –Specs for klystrons –Specs for power distr. System Tree-type PDS Linear-type PDS Waveguide components –Variable tap-off (SLAC-type) –Variable power divider –Phase-shifter and reflector –Q-variation and power variation in PDS –Circulator HLRF studies at S1Global 11

9. HLRF (cont) 3.DRFS-type configuration –DRFS configuration and the purpose –Specs for modulators –Specs for DRFS klystrons –Specs PDS –Performance of DRFS HLRF at S1G 12

10. LLRF Contributor: Michizono Editor: Toge 1.System overview (Stage 1 + Stage 2 + DRFS ) … –use Katagiri’s paper at J.Acc Phys Soc Mtg 2011/8 2.Interlock system … –use Michizono’s IPAC paper 3.Detuning and QL measurements … –use Michizono’s IPAC paper 13

11. 1-cavity operation Contributor: Kirk Yamamoto, Yuri, Dennis, Rocco Editor: ALL 1.Mostly from SRF11 paper by K.Yamamoto – 2.Long-term operation with FNAL-style LFD compensation 14

12. Multi-cavity operation Contributpr: Kirk Yamamoto, Yuri, Rocco, Toshi Matsumoto Editor: ALL 1.Cavity operation aspects (Kirk Yamamoto) – –Simultaneous 4-cavity operation –Radiation vs accelearting field 2.LLRF aspects (Toshi Matsumoto) –Stability of vector sum control … use Matsumoto’s J.Acc Soc Mtg 2011/8 –Long-term operational stability … Michizono’s IPAC –Quench detection … Michizono’s IPAC 15

13. Cryomodule performance Contributor: Ohuchi, Peterson, Nakai Editor: Toge No outline has been received yet. Expect that Ohuchi comes up with the text on the basis of presentations at IPAC11 and elsewhere. 16

15. Alignment Contributor: Hayano, Tsuchiya Editor: Toge 1.Intro and motivation 2.Wire-measurements 3.Laser-monitor measurements 4.Summary 17

Summary Contributor: Hayano, Jim, Rocco Editor: ALL 18

Toge’s Comments Should be upbeat and positive but should be forthcoming and open in identifying the problems encountered and countermeasures contemplated into the future. Need to start writing. Should aim at: Some, if not complete, real text + illustrations + tables to exchange and share toward Granada GDE meeting. 19