PHIN Results Christoph Hessler, Eric Chevallay, Steffen Doebert, Valentin Fedosseev, Irene Martini, Mikhail Martyanov CLIC Workshop 2015, CERN 27.01.2015.

Slides:



Advertisements
Similar presentations
GaAs and CsKSb Photocathodes for DC Gun
Advertisements

PHOTOEMISSION STUDIES OF COPPER I. Martini, E. Chevallay, V. Fedosseev, C. Hessler, M.Martyanov 1 st Topical Workshop on Laser Based Particle Source (I.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Rong Xiang I I Photocathodes for Rossendorf SRF gun Rong Xiang for HZDR SRF-gun team 1 st Topical Workshop on laser based particle.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
AWAKE workshop, Greifswald, September 24 th -26 th, 2014Steffen Döbert, BE-RF AWAKE electron source update.
AWAKE electron source New Electron Source WP at CERN
EDMS No Photoinjector General + Photocathodes presented by Konrad Elsener (CERN-AB)
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
Low Emittance RF Gun Developments for PAL-XFEL
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
Study of Secondary Emission Enhanced Photoinjector Xiangyun Chang 1, Ilan Ben-Zvi 1,2, Andrew Burrill 1, Peter D. Johnson 2 Jörg Kewisch 1 Triveni S. Rao.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Tests of AWAKE spectrometer screen and camera at PHIN Introduction Layout Procedure Setup, results (runs 1 – 5) Conclusions L. Deacon, S. Mazzoni, B. Biskup.
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
Preliminary Results of PHIN Run Summer 2014 Christoph Hessler, Eric Chevallay, Steffen Doebert, Valentin Fedosseev, Irene Martini, Mikhail Martyanov CLIC/CTF3.
Laboratoire de Chimie-Physique CNRS – Université Paris-Sud UMR ORSAY Cs 2 Te photocathodes at ELYSE.
R&D opportunities for photoinjectors Renkai Li 10/12/2015 FACET-II Science Opportunities Workshops October, 2015 SLAC National Accelerator Laboratory.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Cs 2 Te Photocathodes for CTF3 Photoinjectors R. LOSITO - CERN 4/10/2006.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Rong Xiang I I Dark current measurements at the ELBE SRF gun Rong Xiang, Jochen Teichert, Pengnan Lu, Andre Arnold, Petr Murcek,
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
Photocathode based Electron Sources for Particle Accelerators – Yesterday, Today and Tomorrow B.L. Militsyn STFC ASTeC, UK European Workshop on Photocathodes.
S. Lederer & S. Schreiber (DESY Hamburg) L. Monaco & D. Sertore (INFN-LASA, Milano) Studies on the performance of Cs 2 Te photocathodes at FLASH and the.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
Cu,Mg Photoinjectors & LAL projects.
1 Roman Barday Plans for field emission studies at HZB for BERLinPro Unwanted Beam Workshop BERLinPro.
Photo injector dark current at FLASH and efforts for reduction at FLASH and XFEL Svem Lederer Unwanted Beam Workshop 2012 Berlin, Dec 18, 2012.
Development of High Brightness Electron Photoinjectors at ASTeC B.L. Militsyn Accelerator Science and Technology Centre Science & Technology Facility Council,
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
An Electron source for PERLE
CERN Alkali Antimonide Experience
Jun Feng Advanced Light Source Lawrence Berkeley National Laboratory
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Beam dynamics simulation with 3D Field map for FCC RF gun
The PHIN Photoinjector for CTF3
Photocathode analysis and characterization at DESY
UK-XFEL WP1 – Electron Injector Development
Status of the CLIC main beam injectors
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Operation of the High-Charge PHIN RF Photoinjector with Cs3Sb Cathodes
Have a chance to operate your own beam at CERN
Cesium Telluride Photocathode Preparation at Argonne
The Cornell High Brightness Injector
ELIC Injector Working Group High-P, high-I source issues (DC)
Injector: What is needed to improve the beam quality?
R. Suleiman and M. Poelker October 12, 2018
A high-repetition rate low-emittance thermionic RF gun
Advanced Research Electron Accelerator Laboratory
Electron sources for FCC-ee
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
BNL Photocathode R&D An overview of research on high quantum efficiency photocathodes and associated laser systems Andrew Burrill HPHB Workshop Nov 9,
Presentation transcript:

PHIN Results Christoph Hessler, Eric Chevallay, Steffen Doebert, Valentin Fedosseev, Irene Martini, Mikhail Martyanov CLIC Workshop 2015, CERN

Motivation for a CLIC Drive-Beam Photoinjector  A conventional system (thermionic gun, sub-harmonic buncher, RF power sources) is not necessarily more reliable than a photoinjector. At CTF3 e.g. the availability of the CALIFES photoinjector is high.  With a photoinjector in general a better beam quality can be achieved than with a conventional system.  Conventional system (thermionic gun, sub-harmonic buncher) generates parasitic satellite pulses, which produce beam losses.  Reduced system power efficiency  Radiation issues  These problems can be avoided using a photoinjector, where only the needed electron bunches are produced with the needed time structure. → Has been demonstrated for the phase-coding in C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov2 M.Csatari Divall et al., “Fast phase switching within the bunch train of the PHIN photo-injector at CERN using fiber-optic modulators on the drive laser”, Nucl. Instr. And Meth. A 659 (2011) p. 1.

Challenges for a CLIC Drive-Beam Photoinjector C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov3  Achieve long cathode lifetimes (>150 h) together with high bunch charge (8.4 nC) and high average current (30 mA)  Produce ultra-violet (UV) laser beam with high power and long train lengths (140 µs)  UV beam degradation in long trains  Thermal lensing and heat load effects?  High charge stability (<0,1%) → Vacuum improvement, new photoemissive materials, new cathode substrate surface treatment → Usage of Cs 3 Sb cathodes sensitive to green light → New UV conversion schemes with multiple crystals → Study the dynamics of laser system with full CLIC specs → Feedback stabilisation, new laser front end Photocathode R&D Laser R&DPhotoinjector optimization and beam studies

Challenge to Verify Feasibility of Drive-Beam Photoinjector  CLIC requirements far beyond PHIN specs:  One PHIN run per year with 3 cathodes to test. → No statistics possible under these conditions!  Photocathode lifetime measurements require long measurement periods, which are in general not available to the extend as needed C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov4 Different macro-pulse repetition rates: 0.8 – 5 Hz (PHIN) 50 Hz (CLIC)

Recent R&D Activities at PHIN  Since a strong negative impact on vacuum level is expected for CLIC parameters, the vacuum level in PHIN has been improved and its impact on photocathode performance studied:  Lifetime studies with Cs 2 Te cathode under improved vacuum conditions.  Lifetime studies with Cs 3 Sb cathodes and green laser light under improved vacuum conditions.  Focus on Cs 3 Sb cathodes sensitive to green light:  Lifetime measurements.  RF lifetime measurements.  Dark current studies.  Long-term measurement with Cs 2 Te under nominal operating conditions (2.3 nC, 1.2 µs)  Studies for AWAKE project:  Emittance measurement with low intensity beam to investigate PHIN’s suitability for AWAKE.  QE measurement of copper cathode for defining QE requirements for AWAKE C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov5

Improvement of Vacuum in PHIN C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov6 1/e lifetime 185 h 1 nC, 800 ns,  =524 nm, Cs 3 Sb 1/e lifetime 26 h 1 nC, 800 ns, =262 nm, Cs 3 Sb 7e-10 mbar 1.3e-10 mbar Dynamic vacuum level: 4e-9 mbar Static vacuum level: 2.2e-10 mbar March 2012March 2011 Activation of NEG chamber around gun Installation of additional NEG pump <2e-10 mbar 2.4e-11 mbar July /e lifetime ?

Photocathodes Used during PHIN Run C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov7 NumberMaterialAgeQE in DC gun QE in PHIN #198Cs 2 TeNew cathode, produced % after production ~10% #199Cs 3 SbNew cathode, produced % after production 4.9% #200Cs 3 SbNew cathode, produced % after production 3.9% 6A56CuCopper plug (Diamond powder polished) used for RF conditioning 2e-4 after PHIN run 3e-4  In 2014 the initial QE of Cs 2 Te and Cs 3 Sb cathodes in PHIN was in reasonable agreement with the measurements in the DC gun.  QE of Cu cathode was too high compared with best literature values (1.4e-4). Maybe contaminated with Cs. Test for AWAKE

Lifetime Measurement with Cs 2 Te Cathode  Under improved vacuum conditions:  Double exponential fit represents well the data  Lifetime similar to previous measurement.  Cs 2 Te is not ultra-sensitive against non-optimal vacuum conditions C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov8 Dynamic pressure: 3e-10 mbar 1.5e-9 mbar nC, 350 ns, Cs 2 Te # nC, 350 ns, Cs 2 Te #198  2 = 300 h

Lifetime Measurement with Cs 2 Te Cathode  Under nominal operation conditions (2.3 nC, 1.2 µs)  Strong pressure increase. Heating of (uncooled) Faraday cup?  1/e lifetime still 55 h C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov9 2.3 nC, 1.2 µs, Cs 2 Te #198

Lifetime Measurement with Cs 3 Sb Cathodes  Under improved vacuum conditions  Data can be partially fitted with a double exponential curve, with similar lifetime as 2012, however, measurement time is too short for reliable fit.  Klystron trip and phase jump changed slope drastically C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov10 Dynamic pressure: e-10 mbar ~9e-10 mbar 2.3 nC, 350 ns,  Cs 3 Sb #189 1/e lifetime 168 h 2.3 nC, 350 ns,  Cs 3 Sb #  2 = 154 h

Lifetime Measurement with Cs 3 Sb Cathodes  Under improved vacuum conditions:  Despite better vacuum level the lifetime is significantly shorter.  Strong QE decrease started after a phase jump C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov11 Dynamic pressure: 2.3e-10 mbar 1/e lifetime 185 h 7e-10 mbar 1 nC, 800 ns,  Cs 3 Sb #2001 nC, 800 ns,  Cs 3 Sb #  = 47.6 h

Lifetime Dependence on Vacuum  Cs 2 Te yields better than Cs 3 Sb, but not drastically better.  Measurements with different beam parameters but similar vacuum conditions yielded similar lifetimes. → It seems that lifetime is mainly determined by vacuum level. But the vacuum level is also a function of beam parameters C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov12

RF Lifetime of Cs 3 Sb Cathodes C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov13 Fresh cathode Cathode #200 (Cs 3 Sb) Used cathode Cathode #199 (Cs 3 Sb)  Fast and slow decay visible as during beam operation.  In both cases longer lifetimes as during beam operation.  Lower vacuum level than during beam operation. Dynamic vacuum level: 2.5e-10 mbarDynamic vacuum level: 3e-10 mbar

 Field emission contribution from gun cavity (Cu) and cathode.  Cs 3 Sb cathodes (  ~2 eV) produce higher dark current than Cs 2 Te (  ~3.5 eV) and copper (  ~4.5 eV). → Higher vacuum level for Cs 3 Sb than Cs 2 Te under same beam conditions.  The low dark current measured with copper confirms that the major contribution is coming from the cathode. Dark Current Measurements C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov14

Cathode Surface Studies 15  Surface analysis of photocathode materials with XPS and their impact on the cathode performance in collaboration with TE/VSC has started.  New UHV carrier vessel was commissioned to transfer cathode from production laboratory to the XPS set-up:  XPS measurement allows material characterization of the surface. Together with qualitative elemental composition also chemical and quantitative information can be obtained (not straightforward): Easy case: Cu (slightly oxidized) Complex case: Cs 3 Sb Peaks overlap! Courtesy Irene Martini

Upgrade of Laser System C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov16  Installation of new 500 MHz fiber front end with CLIC specs for PHIN. Decoupling PHIN and CALIFES laser systems, but keeping the possibility to switch back to the old front end for PHIN.  Delivery of new front end delayed, but expected in the coming weeks.  Preparation work (re-arrangement of current laser system) has started.  Planned studies:  Stability studies with new front end with improved stability.  Studies of heat-load effects and thermal lensing in laser rods at 50 Hz rep rate.  In parallel further studies on new harmonics generation schemes with multiple crystals to solve problem with UV generation for 140 µs long trains.

Outlook: Plans and Ideas for PHIN C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov17  Cathode lifetime studies with 2.5 µs long pulse trains (double of nominal PHIN train length) and tentatively 5 Hz repetition rate: → “old” 1.5 GHz time structure needed for obtaining conclusive results. → Vacuum window needed. → Long and probably painful RF conditioning required. → Using Cs 2 Te cathodes.  Measurement of RF lifetime of Cs 2 Te cathode  Study of impact of the longer bunch spacing with new laser front end on the photocathode lifetime. → Measurements with 1.05 µs (=3*350 ns) and 2.3 nC with Cs 2 Te  Study of charge stability with the new laser system.  Study the effect of surface roughness on cathode lifetime (Electro-polished cathode plugs).  Study the performance of three components cathodes in PHIN (e.g. K 2 CsSb).  Re-measure QE of uncontaminated copper cathode for AWAKE.  Many interesting ideas for a further PHIN run in 2015!

Ideas for Future CLIC Photoinjector Developments C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov18  It is clear that this question cannot be answered alone by extrapolating from PHIN experiments.  To verify feasibility of photocathodes for CLIC specifications, at some point a RF gun with full CLIC specs must be built.  If the environment will be not suitable for standard photocathodes, are there any fundamentally new ideas which could potentially solve the problem?  The main concern about a CLIC drive beam photoinjector is: Will the high bunch charge and average current create conditions (e.g. vacuum level), which are deadly for the photocathode?

Protective Layers for Photocathodes  Protective layer of alkali-halides (NaI, CsI, CsBr) can increase resistivity against oxidation: C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov19 A.Buzulutskov et al., Nucl. Instr. and Meth. A 387 (1997) 176  Graphene (2D material, monolayer) as a chemically inert diffusion barrier to prevent oxidation:  Works for metals. Is it also suitable for photocathodes? S. Chen et al., ACS Nano 5 (2011) 1321

Diamond Photocathodes  Chemical stable photocathode  Survives air-exposure  High QE, however in the deep UV (<190 nm), not achievable with conventional laser sources C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov20 A.S. Tremsin, O.H.W. Siegmund, Diamond & Related Materials 14 (2005) 48–53  Potential solution (first proposed by H. Tomizawa et al (JASRI/SPring- 8)): Z-polarized laser beam:  High Z-field (few GV/m) reduces work function due to Schottky effect.  Excitation with longer wavelength could be possible. H. Tomizawa et al., Proc. LINAC2012, 996

Diamond-Amplified Photocathodes  Concept developed at BNL: Diamond as a secondary electron emitter.  Due to robustness of diamond long lifetimes with high current seems to be reachable C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov21 [1] X. Chang et al., PRL 105, (2010)  In test setup at BNL a 35% probability of electron emission from the hydrogenated diamond surface was measured with an emission gain of 40 [1].  However, slow charging of the diamond due to thermal ionization of surface states cancels the applied field within it. → Generation of long pulses might be problematic.  Complicated setup (DC and RF acceleration)

Acknowledgement  Controls: Mark Butcher, Mathieu Donze, Alessandro Masi, Christophe Mitifiot  Beam instrumentation: Thibaut Lefevre, Stephane Burger  Vacuum: Berthold Jenninger, Esa Paju  RF: Stephane Curt, Luca Timeo  Wilfrid Farabolini  CTF3 operators  XPS studies: Holger Neupert, Valentin Nistor, Mauro Taborelli, Elise Usureau  Collaborators at LAL and IAP-RAS  … and many others … and thank you for your attention! C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov22

C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov23 Backup Slides

Layout of PHIN C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov24 FCT: Fast current transformer VM: Vacuum mirror SM: Steering magnet BPM: Beam position monitor MSM: Multi-slit Mask OTR: Optical transition radiation screen MTV: Gated cameras SD: Segmented dump FC: Faraday cup

PHIN and CLIC Parameters C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov ParameterPHINCLIC Charge / bunch (nC) Macro pulse length (μs) Bunch spacing (ns) Bunch rep. rate (GHz) Number of bunches / macro pulse Macro pulse rep. rate (Hz)550 Charge / macro pulse (μC) Beam current / macro pulse (A) Bunch length (ps)10 Charge stability<0.25%<0.1% Cathode lifetime (h) at QE > 3% (Cs 2 Te)>50>150 Norm. emittance (μm)<25<

Photocathode Lifetime Studies 2013  Lifetime studies under improved vacuum conditions were already planned for 2013, however due to many problems no comparable lifetime measurement could be performed at that time.  Problems in 2013 among others: “unknown” beam instrumentation, low initial QE, fast QE decrease, QE jumps, 24h drifts.  Problems with photocathodes could be potentially traced back to a wrong surface finishing of the cathode substrates and have been solved in C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov26 Photocathode surface after usage

Emittance Measurements for AWAKE Laser beam size: ~ 1 mm sigma, charge 0.2, 0.7, 1.0 nC, energy 5.5 – 6 MeV C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov27 Normalized emittance for 0.2 nC: 3.2 mm mrad ( big errors !) Charge dependence is roughly sqrt as it should be E n (0.2 nC): 3.2 mm mrad E n (0.7 nC): 4.6 mm mrad E n (1 nC): 5.5 mm mrad

QE Measurement for AWAKE  Copper plug 6A56:  QE(DC-gun) = 2e-4  QE(PHIN) = 3e-4  QE of Cu cathode was too high compared with best literature values (1.4e-4).  Possible explanation: Contamination with Cs. The plug was located in photocathode preparation chamber during a bake-out.  Copper plug 6A46 has not been in preparation chamber during bake-out and has a QE (DC gun) = 3e-5.  It is planned to test 6A46 also in PHIN C. Hessler, E. Chevallay, S. Doebert, V. Fedosseev, I. Martini, M. Martyanov28