BCM 210-L1 IMPACTS OF MATERIALS AND METHODS. DEFINE THE FOLLOWING MATERIALS METHODS ASSEMBLIES.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

3 Title Blocks and Part Lists Permission granted to reproduce for educational use only. Describe drawing sheet sizes and formats Identify marginal information.
A Match made in Heaven? Connecting you with a builder.
OBJECTIVES 1. Characterize the various stages leading to the production of finished blueprints. 2. Differentiate between an architectural schematic.
Overview - Title Slide An Overview of The United States National CAD Standard.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
July 11 th, 2005 Software Engineering with Reusable Components RiSE’s Seminars Sametinger’s book :: Chapters 16, 17 and 18 Fred Durão.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Quality Management – Cost and Time Management Initial Cost of Materials & Equipment Labor Cost Long Term Cost Time Management.
Project Close Out CTC-470.
Conditions of the Contract for Construction
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Construction Engineering 221 Drawings and Specifications.
Construction Engineering 221 Cost Estimating and Bidding.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Construction Contract Documents
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
Copyright © 2016 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Product Evaluation ACT Objective O Emphasize the importance of proper product evaluation and selection O Develop insight into effective procedures,
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Construction Specifications
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
3/11/2003CVEN Maxwell1 Types of Contracts, Ownership, etc. Module Follows Halpin Chapter 5 Updated: March 11, 2003.
Once the designer has decided to use and selected the Magna 3 pump for an application, they must communicate these decisions to the contractor. This communication.
Develop a Business Plan
Jay Bequette Keith Billingsley Bequette & Billingsley, P.A. 425 West Capitol Avenue, Suite 3200 Little.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
Project Diary Missouri Local Programs How to Develop and Use the Daily Diary and Payment Diary for LPA Inspectors.
Construction Construction is a discipline. It is a combination of Art Science S.W. Nunnally, Construction Methods and Management, 7th Edition, Pearson.
Hospital Facility Managers Association of Delaware Valley.
FLOW-SHEETING What we will cover here? PFD?
SUCCESSFUL BUSINESS PLANNING FOR ENTREPRENEURS © South-Western Thomson Chapter 2Slide 1 CHAPTER 2 Plan the Small Business OBJECTIVES 2-1Explain the importance.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
Chapter 30 Final Inspection, Contract Closing, and Project Transfer.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
Document and Record Keeping CTC-470. Project Files Important tools –Indispensable for managing project –Must have a logical organization –Must have documents.
Formats ACT 380.
Chapter 43 Construction Supervision Procedures. 2 Links for Chapter 43 Contracts Completion Notices Bids Inspections Loans Appraisals Change Orders Building.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 9 Slide 1 Unit 9 Specifications and Commercial Construction.
Chapter 13 Title Records The recording of property ownership is a serious undertaking, and the storage and maintenance of ownership and title records is.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
What are they? How can I do them too? Construction + Materials IV: Construction Documents.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Graphical Detailing in Construction and the Built Environment
Once the designer has decided to use and selected the correct Magna 3 pump in a specific application they must communicate these decisions to the contractor.
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
Lecture(3) Sequence of Studies for a Single Major – Infrastructure Projects 1 A preliminary (or reconnaissance) report. 2 A feasibility report.
Develop a Business Plan
BTEC Nationals – Unit 5 Construction Technology and Design in Construction and Civil Engineering.
Construction Planning and Estimating Construction Technology I Module 2 part 2.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
Chapter 7 Computer-Aided Design and Drafting in Architecture.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Architectural Drafting Equipment
Construction Documents
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
Detail Drawings and Assembly Drawings
Presentation transcript:

BCM 210-L1 IMPACTS OF MATERIALS AND METHODS

DEFINE THE FOLLOWING MATERIALS METHODS ASSEMBLIES

DEFINE COMMERCIAL OCCUPIED BY GENERAL PUBLIC PRIVATE SECTOR PUBLIC SECTOR

SYSTEMS SELECTION CRITERIA CODES AESTHETICS COSTS APPROPRIATE USE DURABILITY MAINTENANCE WEATHERABILITY AVAILABILITY

IMPACTS OF MATERIAL AND METHODS SELECTION CONSTRUCTION OPERATIONS SEQUENCE OF ACTIVITIES DURATIONS/LENGTH OF TIME EQUIPMENT LABOR SAFETY QUALITY COSTS

BCM 210 L2 Fall 2000 Contract Documents Overview for Commercial

Contract documents (seven documents) Identified/purpose of each Drawings Specifications Contract General Conditions Supplementary Conditions Addenda Modifications

Prepared by? Legal Status? Relationships and Conflicts in CSI Specification system

Drawings - Purpose Modeling Tool Communication Tool

Who Uses Drawings Lenders - Financing Bidding - Competitive Approvals - Building Departments, Owners, Construction Managers (Constructability Review) Construction

Drawings Show Location of Materials Size and Dimensions Relationships and interface of various materials and components Reference to specifications Contract Limits (Sometimes Specification Notes and Information)

General Items Ownership of Documents Copy Rights Reproduction Systems Drawing Standards (Lack of requirements in the U.S. - many offices use different symbols and standards) CON DOC System Errors in Drawings (Why) How to roll Drawings Protect Drawings From Ultraviolet Rays

Plan Reading Sheet Order Sheet Arrangement Bound Left Edge Critical Info To Right of Sheet Letter Designation (L-1,M,S, etc.)

Cover Sheet Architects Title Block Project Number (8609 explain) Index to sheets Abbreviations ( Sometimes placed in the project manual) Site and Project Overview Contract Limits