Shutdown plans for the FPIX 27/01/2009 Mauro Dinardo University of Colorado – Boulder, USA Mauro Dinardo University of Colorado – Boulder, USA Pixel General.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Arndt & Shipsey - PurduePixel Upgrade Discussion 9-Oct FPIX Material Reduction & Module Development A few alternative layouts of modules on disks.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Simon Kwan - FermilabCMS Tracker Upgrade Workshop – June 3, Update on the Phase 1 FPIX Half Disk Design Simon Kwan Fermilab on behalf of the USCMS.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
Phase 1 FPix Cooling Tube Testing Erik Voirin, C.M. Lei, Harry Cheung, Stefan Gruenendahl (FNAL) Kirk Arndt, Qiuguang Liu (Purdue) Phase 1 FPIX cooling.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Thermal Screen Grounding CERN - Dec. 10 th, 2003 Enzo Carrone The thermal screen grounding and the tracker: a scary concert Enzo Carrone.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
7/8/20161 Pixel detector status and infrastructures Pixel detector status and infrastructures G. Bolla.
Installation of the T600 at Fermilab
LKr status R. Fantechi.
Service channels between Tracker and PP1
Micro-channel Cooling
Christian Veelken last updated 11/09/06
Tracker Outer Barrel COOLING Antti Onnela, CERN.
ROD assembly and test in US
ScECAL+AHCAL+TCMT Combined Beam FNAL
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Pixel Detector System (Barrel & Forward)
Silvan Steuli Roland Horisberger Stefan König CMS Upgrade Workshop
Tests on a dummy facet of PIX upgrade using CO2 cooling
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Limited Streamer Tube Project Summary
Presentation transcript:

Shutdown plans for the FPIX 27/01/2009 Mauro Dinardo University of Colorado – Boulder, USA Mauro Dinardo University of Colorado – Boulder, USA Pixel General Meeting

Work needed to be done on FPIX 2 1.Purge cooling lines 2.Un-cable & removal BCM 3.Un-cable BPIX pipes & power cables 4.Un-cable & removal FPIX 5.Transport FPIX to Meyrin building 186 (same place where I performed the commissioning of FPIX – everything is ready to host FPIX): 1.Substitute current Silicon tubes with more robust Silicon tubes which can withstand higher pressures 2.Fix the broken 6% 3.Put the cold finger to stabilize the AOH temperature during operation 4.Improve humidity monitor 5.Quick checkout (particular attention to sectors with apparently flaky HV connection and high baseline drift) 6.Photogrammetry 6.Transport FPIX back to P5 7.Re-insert & re-cable FPIX 8.Re-cable BPIX power cables and pipes 9.Re-insert & re-cable BCM

Silicon tube replacement 3 Silicon tubes have been used inside the forward pixel detector to make the connection between the Aluminum pipes and the Half-Disk hose barbs They need to be replaced with more robust tubes (same as those used by BPIX): Current Silicon tubes are rated up to 1.7 bars New Silicon tubes are rated up to 10 bars  the limit will set by something else (Aluminum pipes and brazed cooling channels) will be able to run at 2.4 barg instead of 1.9 barg (big difference in terms of effectiveness of establishing flow)

Fix for the broken 6% 4 To be repaired: 1.BmI (HC-Z1) – Disk 1 – Blade 1 – Panel 2 – Plaquette 2 (2x4)  Broken HV wirebond (8 ROCs) Broken during transportation or insertion Needs from FNAL: 3L panel 2.BmI (HC-Z1) – Disk 1 – Blade 10 through 12  Short on HV outer radius (93 ROCs) Occurred ~1 month after installation (3/9/2008) Needs from FNAL: 3R and 4L panels and –Z-In adapter board Problem 1: obviously located on the panel Problem 2: from measurements of resistivity it can be located at the level of the power filter board or on the power cable Problem 1: obviously located on the panel Problem 2: from measurements of resistivity it can be located at the level of the power filter board or on the power cable

Fix for the broken 6% 5 To be repaired: 3.BmO (HC-Z2) – Disk 1 – Blade 9 – Panel 2  Low analog signal amplitude (24 ROCs) Occurred ~1 month after installation (11/9/2008) Needs from FNAL: 3x panel and –Z-In adapter board 4.BmO (HC-Z2) – Disk 2 – Blade 4 through 6  Short on digital voltage (135 ROCs) Occurred ~10 days after installation (11/8/2008) Needs from FNAL: 3x and 4x panels and -Z-Out adapter board Problem 3: is likely located at the TBM level Problem 4: from measurements of resistivity it can be located at the level of the adapter board or on the panels Problem 3: is likely located at the TBM level Problem 4: from measurements of resistivity it can be located at the level of the adapter board or on the panels

AOH cold finger and humidity monitor improvement 6 We want to put a “Cold fFnger” to perform a thermal contact between the AOHs and the cooling pipes in order to better stabilize the temperature during operation: We studied the best design to implement … see next sides ! The humidity reading at P5 has been difficult to interpret ! We convinced ourselves that there was a pretty big leak inside the pixel volume that didn’t allow us to have a dew point below -8 on +Z-side and below +2 on the –Z-side. We performed tests with the pilot run detector at TIF (docdb #2347) in order to better understand our HMX calibrations and the data that we measured at P5: 1.We should place the RTD much closer to the HMX 2.We should place the HMX in a spot which has a small temperature gradient: far from heat loads and heat sinks 3.We should follow up the work that is being done by Paolo&Machi in order to put reliable dew point meters with which we can cross check our HMXs

Origin of the Problem (e.g. Run #67838) FPIX – FED36 – BmO – ROG1-2 FPIX – FED37 – BmI – ROG1-2 BPIX – FED00BPIX – FED12 BPIX has better stability and uniformity with time Within the hypothesis that the FED automatic baseline correction is working properly, the backend readout system can tolerate +/-3°C temperature variation (+/-150 ADC counts)

Pyrolytic Graphite: 5 Layers (500 μm) 8 We made a “sandwich” of: ultra thin Kapton foil (for electrical insulation) + 5 foil of PGS, total thickness 500 μm (for heat removal) + G10 (to keep the PGS in contact to the AOH PCB) Problem: delamination of the foils (PGS is electrically conductive)  a small vacuum cleaner should be used during installation Pyrolytic Graphite Sheets (PGS): density: ~1 g cm -3 (= 1/9 th of the Copper) thermal conductivity: W m -1 K -1 along the plane and 15 W m -1 K -1 perpendicular to the plane

Pyrolytic Graphite: 5 Layers (500 μm) + encapsulation 9 The stability is improved by ~70% and the uniformity within the channels is very good With Cold Finger Black lines: AOH with cold finger (500 μm) + encapsulation Colored lines: AOH with cold finger (200 μm) Reference condition: without Cold Finger In the Pilot Run Detector there are two portcards = two AOHs: Black lines: first AOH Colored lines: second AOH Oscillations due to the conditioning of the clean room: +/-1°

HMX Placement Scenario 10 Attached to the fibre bundles. Easy also for an Honeywell sensor Close to the disk in the center. Not so easy for an Honeywell sensor Attached to the end-flange. Not so easy for an Honeywell sensor

Aside work 11 Substitute the rear foot on all the four half cylinders: Greg Derillo Check for high baseline drift: BmO-DISK1-ROG1 (FED36 chn. 1,6)  serious BmO-DISK2-ROG1 (FED36 chn. 10,12)  serious BpI-DISK1-ROG1 (FED32 chn. 1,2)  less serious BpI-DISK2-ROG1 (FED32 chn. 7)  less serious BpI-DISK1-ROG3 (FED35 chn. 1)  less serious Check sector that might have flaky high voltage connection: FPix_BmI_D1_BLD[1,2,3]_PNL1_PLQ1 FPix_BmI_D1_BLD[1,2,3]_PNL1_PLQ2 FPix_BmI_D1_BLD[1,2,3]_PNL2_PLQ1 All belongs to the inner radius

Work Flow for +Z 12 1.Substitute the tubes 2.Place AOH Cold Finger 3.Place rear foot 4.Full re-test: usual sequence of tests up to Pixel-Alive Check if the AOH Cold Finger is working properly Particular care to those sectors for which the baseline fluctuations were wider 5.Photogrammetry 1 to 3 can be done almost in parallel

Work Flow for -Z 13 1.Understand problem of broken 6% and fix it 2.Substitute the tubes 3.Place AOH Cold Finger 4.Place rear foot 5.Full re-test: usual sequence of tests up to Pixel-Alive Check if the AOH Cold Finger is working properly Particular care to those sectors for which the baseline fluctuations were wider Particular care to those sectors for which we experienced flaky high voltage connection 6.Photogrammetry 2 to 4 can be done almost in parallel

Teams involved in the maintenance and repair 14 1.Cabling/un-cabling: Mauro, Lorenzo, Pasquale 2.Removal/re-insertion: Max, Ricardo, UC-Davis fellows 3.Transport: Max, Ricardo, UC-Davis fellows 4.Repair/re-check of the detector at TIFF: Mauro, Lorenzo, Pasquale, Dave, FNAL technicians … 5.Re-check at P5: anyone available on site at CERN to perform pixel shifts I strongly recommend to have the experts on site at CERN: e.g. software and DCS

Allocated time window for removal and re-insertion 15 1.Extract FPIX +Z side on 05/03 2.Extract FPIX –Z side on 18/03 3.Re-insert FPIX +Z side on 30/03 4.Re-insert FPIX –Z side on 08/04 Only ~9 days of overlap between extraction of –Z side and re-insertion of +Z side !!! From the extraction (un-cabling + transportation included) to the re-insertion (transportation + re-cabling included, check out at P5 not included) we have: 5 weeks and 4 days – It’s going to be really tight if we want to do everything !!!

24/02 05/03 16/0318/03 23/0329/03 30/03 06/0408/0409/04 +Z extraction and transportation Schedule 16 MondaySaturday Sunday + Z: Tubes / AOH / Rear foot / Baseline check / Full re-test – Z extraction and transportation +Z packing / transport – Z: Repair / Tubes / AOH / Rear foot / Baseline check / Full re-test – Z insertion (4 days) – Z packing / transport +Z insertion (4 days)

Backup Slides 17