PPC Industry Forum, 03 December 2009. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Slides:



Advertisements
Similar presentations
BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
Advertisements

1G MSIL SFOA1 Trial Update Week Ending: 04 April 2008.
Ofcom Consumer Switching
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Geoff Hammond Head of Revenue Assurance. Agenda Revenue Assurance & CRAB Focus PPC Circuit Validation PPC Radial Distance Validation Questions.
Always consult the current Carrier Price List. Examples based on 10 March 2010 Price List Uncontrolled when downloaded
STANDARD CONTRACT FORUM MONDAY 13 TH DECEMBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
Thank you.
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
©OTA O TA Office of the Telecommunications Adjudicator 1 11/10/20041 High Level Review and Status of Activities under the Telecommunications Adjudicator.
Standard Contract Forum 24 April Customer Suite, BT Centre, London.
PPC Industry Forum, 06 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Forum, 1 st March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Standard Contract Forum 04 December Customer Suite, BT Centre, London.
PPC Industry Forum, 4 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
TARGET2 Information Session September 3rd, 2009 Geert Bakker – Project Manager NL.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
PPC Industry Forum 2 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Forum, 5 March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Forum, 7 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Forum 16 September Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Partial Private Circuits Kalpesh Brahmbhatt 31 October 02.
Business unit (if required) business unit (if required) SDH Serving Nodes Determination at the Point of Handover.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
Update to NLAG board 22 nd December Sep Jan MCE Workforce and OD Oct Nov Dec IM&T Estates Finance In hospital Model Out of hospital Model Progress.
Agency Charging Statement Overview of Consultation 11 th February 2008.
CPS LOCAL EXCHANGE CALLS BT WHOLESALE UPDATE 2 SEPTEMBER 2004 TIM HOWSON PRODUCT DEVELOPMENT MANAGER The information in this presentation.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
PPC Industry Meeting 24 th February Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005.
1G and 10G MSIL SFOA1 Trial Updates Week Ending: 13 June 2008 Beatrice Osborn Product Development, BT Design.
EU Implementation Programme
Inventories and the Cost of Goods Sold
Inventories and the Cost of Goods Sold
Amendment Invoice Task Force Progress Report
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Exit Capacity Substitution and Revision
McDonald’s calendar 2007.
Amendment Invoice Task Force Progress Report
Release 3 Scope Selection and Plans
Amendment Invoice Task Force Progress Report
Timeline Overview Planned Timescales
McDonald’s calendar 2007.
KVI Analysis for period 1st May 2018 to 31st March 2019
KVI Analysis for period 1st May 2018 to 31st March 2019
2015 January February March April May June July August September
Presentation transcript:

PPC Industry Forum, 03 December 2009

Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information contained in the following slides was accurate at time of publication. Any price indications or timescales contained within this presentation are estimates for information purposes only and do not constitute any contractual or other obligation. In relation to any products/services referred to in this presentation which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available BT reserves the right to make changes to the information in this presentation at any time without further notice Exclusive reliance on the information in this slide pack is at your own risk Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Agenda Introductions – All Efficient use of PoH Infrastructure - John Morden/Ed Pigott 21C Update-Becky Hewlett Wholesale Customer Reporting (WCR) Demo-Sheila Mason/Mitesh Tailor Review of previous actions– Leslie Hurrell-Smith Product Development Update– Pauline Cowie Product In Life Update – Jeneva Hibbert QoS Reports Communications/Notifications BCMR Update AOB – All Forum Review -Leslie Hurrell Smith Date of next meeting - All Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Industry Forum Introduction

business unit (for internal use only) / url (for external use) PPC Industry Forum PPC Point of Handover Pricing 3 December 2009

Managed Bandwidth Services BTW Products and Strategy Background The basis of the new PoH pricing was set out in and of the Leased Lines Charge Control Statement dated July The third alternative set out in was “Introduce a cost recovery mechanism that would incentivise migration to new, aggregated PoHs. Under this approach, circuits handed over new PoHs would not attract the separate new PoH charges we are imposing. This would incentivise CPs to migrate to the new efficient PoHs as it would allow them to reduce (and ultimately avoid) the new PoH rental charges. Of the three further alternatives we discussed above, BT has proposed to implement the third one. We expect BT to implement this within three months following implementation of the charge controls.”

Managed Bandwidth Services BTW Products and Strategy Progress of Consultation Following the Ofcom Statement, BT has met with Industry twice to discuss the proposals: a)At an Industry meeting on 21 th August, where the pricing approach was first explained to Industry, and early indicative prices shown. b)At a PPC Industry Forum on 17 th September 2009, improved illustrative prices were presented. A set of proposed prices were communicated to members of the PPC Industry Forum on 27 th November To date BT has received no formal response to its proposals.

Managed Bandwidth Services BTW Products and Strategy How prices were calculated a)Number of PPC Muxes used for Point of Handover identified b)Volume of PPCs handed over Points of Handover measured using July 2009 data c)The number of 64k and n64k PPC circuits handed over aggregate 2M bearers was identified using data from November d)The total cost of PPC 3 rd Party PoH charge was calculated for these circuits and divided by the volume of PPC muxes to get an underlying charge per mux. e)The calculation was stratified by Mux size. f)The resultant charge by Mux is consistent with the per circuit charge and is an Industry average.

Managed Bandwidth Services BTW Products and Strategy How new pricing will work The charge will apply to each PPC point of handover SMA mux. Charges will apply to both PPC PoH and former Retail PoH that have been redesignated as PPC PoH. All PPC circuits delivered over the PoH will have the 3 rd Party PoH Rental charge dis-applied. This includes the charge for 64k and n64k PPCs delivered over aggregate bearers carried over the PoH mux. 3 rd party PoH charges will continue to be charged on those PPC circuits that are not handed over at a PPC PoH. Operators can reduce their PoH costs by achieving an improved fill rate on their PoH, rewarding improving efficiency with lower aggregate PoH charges.

Managed Bandwidth Services BTW Products and Strategy Proposed Point of Handover price: Indicative Prices at September Industry Forum Proposed Prices Rental p.a. (£) SMA – 16,8176,192 SMA – 411,19710,837 SMA – 1614,60513,643

Managed Bandwidth Services BTW Products and Strategy Practical Details Systems development work - Q1 2009/10 (January to March 2010) Live billingQ2 2010/11 (April to June 2010) There are additional costs that CPs will bear resulting from the rearrangement of these circuits. (This is set out in of the Ofcom Statement).

Managed Bandwidth Services BTW Products and Strategy Next Steps Any responses to these proposals to be made formally to BT in writing. Reponses can be made to Product Line (Pauline Cowie or Jeneva Hibbert) or through Account Team. The closing date for responses is 5pm on Friday 8 th January BT and Communications Providers to work together to develop necessary systems to implement new pricing proposals. This work must be completed in Q4 2009/10 (January to March 2010). BT to formally notify new product and prices on Carrier Price List with usual notice periods.

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits 21CN Update

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Wholesale Customer Reporting (WCR) Sheila Mason / Mitesh Tailor

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Review of Previous Actions (in conjunction with Action List)

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Action Point 04/12 (04/12/08) RFT T2R Initiatives Presentation: Validation Rules

Managed Bandwidth Services BTW Products and Strategy Action Point 01/03 (05/03/09) Exchanges taken off the Closure List Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 04/06 (04/06/09) Provisioning Stats – Inclusion of Provision against Customer Required by Date (CRD) Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 05/06 (04/06/09) Provisioning Stats – Requirement for Mean Time to Provide is shown in Working Days instead of Calendar Days Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 06/06 (04/06/09) Repair Stats – Matters Beyond Our Reasonable Control (MBORC) Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 09/06 (04/06/09) Excess Construction Charges (ECC) 1)Mapping Service 2)Identification of costs for dual provision at same site Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 10/06 (04/06/09) Excess Construction Charges (ECC) 1)£350 Planning and Admin Charge 2)Copper Out of Limits Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 01/09 (17/09/09) Central Birmingham Zone (CBZ) Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 02/09 (17/09/09) Birmingham Metro Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 03/09 (17/09/09) Enhanced Care Plus (EC+) Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 04/09 (17/09/09) B End Shift Price: Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 05/09 (17/09/09) BCMR SLG: Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 06/09 (17/09/09) SLG Payment Reports Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 07/09 (17/09/09) Central London Zone (CLZ) Exchange Review Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 08/09 (17/09/09) PPC CP2CP Managed Move Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Product Development Update

Managed Bandwidth Services BTW Products and Strategy PPC Development Roadmap Q4 2010/11 Q1 Q2 – Q3 Rapid Restore – Go/No Go 9 Dec 2009 High Band FOC Improvement Q4 Leased Line Charge control – Final Doc Received 2 nd July 09 High Band FOC Improvement Cust, Trial Q2 – Q4 Leased Line Charge Control – Rental Prices Implementation 1st Sept 09 CP to CP Managed Move - Tactical 14 th Sep 09 Birmingham Reduced Lead Time 27 th July 09 PPC Contract Review 1 st Oct 09 BCMR Aggregation Node Phase 3 March 2010 Enhancecare Plus (Fibre) 1 St Oct 09 Leased Line Charge Control – Infrastructure & PoH Prices Implementation 1 st Oct 09 BCMR Aggregation Node Phase 2 Q2 – Q3 3 rd Party Infrastructure Sharing Withdrawn B End Shift Charge TBC Term Discounts TBC 2009/10 Q2 Q3 CP to CP Managed Move - Automated 18 Dec 09 Enhancecare Plus (Copper) March 2010 Ethernet over TDM 30 March 2010 Geo Lead-Time Reductions Metro Access 30 Days Q1 PPC Price Control RPI-X 1 October 2010 PPC Annual Price Control Review RPI-X 1 March 2010 CELA Discount February 2010

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Product In-Life Update QoS Reports Communications & Notifications Business Connectivity Market Review (BCMR)

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits QoS Reports

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision Stats

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision– Early Life Failures (ELF)

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision to Customer Required by Date (CRD)

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision – Mean Time to Provide

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision Stats - Chart

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Repair Stats

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Repair – Repeat Faults

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Mean Time to Repair – Including Intermittent Faults

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Mean Time to Repair – Excluding Intermittent Faults

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits –Repair Stats - Chart

Managed Bandwidth Services BTW Products and Strategy Communications: 012/09PPC Contract Review Completion Notification – 23/09/ /09PPC Data File – 30/09/ /09PPC Excess Construction Charge (ECC) Mapping – 14/10/ MBORC declaration due to recent severe weather – 23/11/2009 Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Pricing Notifications: No price notification since last Industry Forum Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy BCMR Update Phase 1 – Completed to meet 1 April 2009 Phase 2 - Completion of amendment to existing circuit as at 8 th December Adjustment made to circuit inventory bill affecting wef 1 st September 09 Phase 3 - Distance adjustments to circuits moved or ceased between 8 th December 2008 – 31 st April 2009 Pricing Adjustments to 8 th December 08 in progress, target completion March 2010 Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits A.O.B Feedback on PPC Comms & Website.

Managed Bandwidth Services BTW Products and Strategy Forum Review Next Meeting Scheduled 4 March 2010 Venue: TBC Partial Private Circuits