1 RRNR-TV (September 2008 Ghent)
2 Proponents NEC NTIA KWILL Yonsei
3 ILG CRC
4 Subjective Test Design Source selection: by CRC Test design: by CRC We had a number of unexpected problems with the test PVSs, resulting in substantial delays. Cares should be taken for future projects.
5 Subjective Test Lab NEC NTIA KWILL – 625 (NHK) Yonsei Each lab do the subjective test with exactly 16 evaluators (after screening) and the data from the same format will be combined. Some screening procedures will be applied to the subjective data to exclude problematic evaluators.
6 Schedule (tentative) Finalization of the test PVSs: done Subjective test: 15 Oct. Objective data submission: 10 Oct. Verification of objective data: 24 Oct. Data analysis: 31 Oct. Draft of the final report: 30 Nov ITU meeting: ITU-R 6C (May 2009), ITU-T SG9 (Feb. 2009, tentative) Note: the verification of objective data will be done by the proponents.