Assets Returned From Lease Project: 0307-01-003 Bill Cody Black Belt Week 3 Report Out.

Slides:



Advertisements
Similar presentations
CI Basics Super Sponsor DMAIC The Value Stream 6σ6σ.
Advertisements

Project Storyboard Template
Strategy, Balanced Scorecard, and Strategic Profitability Analysis
Business Performance Management (BPM)
Chapter 3: The Project Management Process Groups
Barry Murash MBBit Nortel 2007
Premium Reduction & Delivery Improvement
Six Sigma What is Six Sigma?
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Development of Six Sigma
Managing Project Quality
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
“Safety is a Measure of Success”
Six Sigma Green Belt Project
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
1-1 1 Quality Management Chapter Total Quality Management (TQM) Total quality management is defined as managing the entire organization so that.
By: Nick Blank March 1, Six Sigma Definitions Goals History Methods Roles Benefits Criticism Software Development.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
2 FOR INTERNAL USE ONLY Project Chartering  Define the components of a project charter  Develop a project idea into an effective project charter  Review.
Items Required for Process Hand-off
Goals 1.Reduce inventory 25% 2.Improve productivity 25% 3.Create Standard Operations September , 2005 Quality Control Lab Kaizen Event.
PRIMO Limited & 6 Sigma By HKU SPACE 6 Sigma Consultant Firm 30-May-2006.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
© 2002 Six Sigma Academy0 Define Point one Point two Point three Increase Market Share.
Price Support (Vendor Rebates) Outside Vendor Window Black Belt: Debbi Youmans-McCreary Division: INA - eIKON BU – Ops/Vendor Credits/Southeast.
Assets Returned From Lease Project: Bill Cody Black Belt September 25, 2003.
Operations Fall 2015 Bruce Duggan Providence University College.
Inconsistent Administration of Sales Commissions Status Report August 28, 2003 Norcross, GA.
Unapplied Cash: eIKON Dealer Compensation Joyce Darson NE Region CCC.
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Operations/Northeast BU – Steering Comm Presentation.
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
IT Asset Reassignment / Moves David Levine Information Technology IKON Network Center.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Chapter 21 Measurement Analysis. Measurement It is important to define and validate the measurement system before collecting data. –Without measurement.
Project Update Effective Product Launch Vendor Integration Inga Broerman Black Belt Marketing - Corporate.
Project Charter Revenue/Sales Implications of Trials Black Belt Jack Thackrah NE Region BS – Malvern PA.
Canon Strategic Marketing Plan - Supply Credits
Working Capital - > 90 Day Delinquency Project – Heath Peacock Finance Tempe, AZ - CCC.
Meter Reads-Method Project Number Black Belt Rob Zinsky Northeast region.
Product Promotions Effectiveness Chris Tantakis Canada.
Sales Forms Package Art Zieky INA-Sales Operations Macon, Malvern.
David Pasquarello Ikon Office Solutions
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
Project Chartering & Approval Process
Assets Returned From Lease Project: Bill Cody Operations Columbus OH.
Six Sigma Black (& Blue) Belt: Jeanette Wall. Unapplied Cash-Calculation Error Jeanette Wall Operations Location- Company-wide CANCELLED!
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
Meter Reads-Optimum Calling Process Project Number Black Belt Rob Zinsky Northeast region.
Price Support (Vendor Rebates) Outside Vendor Window Black Belt: Debbi Youmans-McCreary Division: INA - eIKON BU – Ops/Vendor Credits/Southeast.
Unapplied Cash: eIKON Dealer Compensation Joyce Darson NE Region CCC.
Collections Accountability Leases that Terminate into Term Code TMDCR Tom Merry October 23, 2003 Week 4 Presentation.
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Northeast BU – Forecasting/Service/ Revenue/Base/Type of Machine.
Contract Setup Project Black Belt: Rob Vaughn Week 3 Presentation Houston, TX.
Unapplied Cash – Canon & Ricoh Credits, Discrepancy in System Project # Black Belt - Jonathan Williams Division- Service/ Order Entry/Vendor.
Collections Accountability Leases that Terminate Following Automatic Renewal Tom Merry September 24th, 2003.
Canon Strategic Marketing Plan - Supply Credits Marcus Downey South Region.
Meter Reads- Web Meter Effectiveness Project Number Black Belt Cathy Delvalle Atlanta CCC.
TM 720: Statistical Process Control DMAIC Problem Solving
Six Sigma.
Six Sigma.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Practical Assessment Project Template
DMAIC Project Template
OPS/571 Operations Management
Quality Management Six Sigma
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
OPEX DMAIC Routemap Slides
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Assets Returned From Lease Project: Bill Cody Black Belt Week 3 Report Out

2 Project Characteristics n IKON assets remain at customer locations after lease obligations are met n Nationally, 84,000 assets are tied to contract terminations yearly; 24,600 are in the West Region n Recovery rate in West Region is 88%, translating to 2,961 assets not being recovered. n Assets remaining (Unrecovered) at customer locations after lease termination represent lost revenue opportunity from a wholesale and retail perspective n Six Sigma will focus on improving the recovery rate for the West to 95% providing IKON with incremental revenue

3 Performance Standards n Definition of Y Process Metric n % of Assets Recovered after Lease Termination This encompasses IOSC Leases where: n Terminated assets are recovered through normal lease expiration n Terminations where customers maintain assets (rewrites, outright purchase, or term renewals) after lease expiration n Early lease terminations due to Bankruptcy/Bad Debt (non-pay) n Recovery opportunity starts with Lease Termination and ends with Equipment Disposition and all Systems Updated and Reconciled to reflect Recovery

4 Measurement System Analysis n Data is extracted from both OMD and IKONIC’s n Details by Marketplace, by Customer, by Equipment Serial Number, Term code, etc. are utilized for Asset Recovery Opportunity and Reconciliation n Measurement System Analysis (MSA) is Required to Validate Baseline Accuracy of the Data within the Focus Area (Terminated Assets) n 317 Samples were extracted from OMD n If “Recovered” - customer signature to be validated n If “Unrecovered” - no customer signature should be on file For Purposes of Success - OMD is the Master Record

5 MSA Validation Date of study: October 13, 2003 Reported by: Bill Cody Name of product: Attribute Gage R&R Study Misc: Assets Returned from Lease Each Appraiser vs Standard Assessment Agreement Appraiser # Inspected # Matched Percent (%) 95.0% CI POD on File? ( 95.1, 98.9) # Matched: Appraiser's assessment across trials agrees with standard. Attribute Gage R&R indicates Data is VALID - Recovery Receipts on file for Equipment that has been Recovered and so Coded within OMD

6 Product Capability n Capability can be Expressed as: Non-Recovery Total (NR T ) = NR Recoverable +NR Bankruptcy +NR Customer Keep 210,140PPM = 114,950 DPMO + 5,450 PPM + 89,740 PPM Project Focused to Eliminate & Drive Revenue (Data Validated by Serial Number and Termination Code) Recovery Data as of 9/30/03 (September West Recovery Data.xls)

7 Product Capability - NER Process n Capability in the Northeast can be Expressed as: Non-Recovery Total (NR T ) = NR Recoverable +NR Bankruptcy +NR Customer Keep 143,267PPM = 65,842 DPMO + 6,579 PPM + 70,846 PPM 114,950 DPMO From the West: To the East: 65,842 DPMO Initial Entitlement will achieve 3.0 Sigma Level

8 Product Capability -Baseline Data Asset Recovery Opportunity Bankruptcies - IOSC Controls Customer Maintained Source: September West Recovery Data.xls

9 Performance Objectives- Baseline Data Source: Steve Hamil - Blended Wholesale Values Objective Validation.xls West Region - Unrecovered Asset Opportunity: $3.9 Million is the Opportunity at Hand!

10 Performance Objectives n If 100% recovery for all assets that can be returned, $3,880,000 in incremental revenue will be achieved based on wholesale/used market assumptions by equipment segment. n if only 95% are returned and sold - $3,690,000 n if only 70% are returned and sold - $2,720,000 n if only 50% are returned and sold - $1,940,000 n if only 20% are returned and sold - $776,000 Incremental Revenue is Achievable!

11 Variation Sources Significant Inputs: OMD Updated IKONIC’s Updated Termination Codes Term Requests Marketplace Processing OMD/IKONIC’s Reconciled _CodyC&E_matrix.xls

12 Variation Sources Process Inputs that Impact Recovery: Data Reconciliation between OMD/IKONIC’s Communications with and between - too many assumptions: Customers Marketplaces CCC CC’s

13 Potential Causes Test and CI for Two Proportions Sample X N Sample p Estimate for p(1) - p(2): % CI for p(1) - p(2): ( , ) Test for p(1) - p(2) = 0 (vs not = 0): Z = P-Value = Northeast Data West Data Hypothesis: H o : West Region Process is as Successful as the NER H a : West Region Process is not as Successful There is Statistical Evidence that the NER Recovery Process is Significantly more Successful

14 Potential Causes CCC Process: Marketplace Process: CC Process: No Centralized Ownership/ Accountability….. Individual Processes Provide Too Many Areas of Opportunity for Assets to be Missed

15 Potential Causes Marketplaces Identified to Go Get!! Minitab - September.mpj Defects by Marketplace

16 Termination Codes Identified to Go Get!! Minitab - September.mpj Potential Causes Defects by Term Code

17 Next Steps n Continue Variable Relationship Analysis - Impact of each Significant Variable to the Process Output n What is different and successful in the Northeast? n Submit New Charter Request based upon Process Discovery to run Concurrent: n LEAN Process Review Identified Redundant Activities that when Eliminated Should Provide for Fewer Associates in the Process (Multiple Machines in Same Location - Separate Orders Required) n Establishment of Cycle Time Requirements to Reduce Process Time and Recognize the Revenue Sooner n Review Project Status and Projected Change Requirements with Process Owner (John Totah) n Target Date for Roll-out => by 12/31/03

18 Project DMAIC Checklist/Status X X X XX

Appendix

20 System Variation

21 Process Map - Asset Recovery Northeast Region (Baseline)

22 Current Process Map - Phoenix - Asset Recovery Team Activity requires redundant action

23 Current Process Map - Phoenix - Logistics Team

24 Current Process Map - Phoenix - System Updating

25 Multiple machine impact Current Process Map - Midwest Region (Cincy CC) - Logistics Process

26 Process Capability: Detailed NER Process - Lease Recovery

27 C&E Diagrams

28 C&E Diagrams

29 C&E Diagrams

30 C&E Diagrams

31 C&E Diagrams

32 C&E Diagrams

33 C&E Diagrams