Basic Concepts for Development of a National Strategy for Improvement of Agricultural and Rural Statistics  Statistics vs. Information  What is a Strategy?

Slides:



Advertisements
Similar presentations
Step 3: Strategy Development. Learning Objectives Define strategy/strategic approach Understand strategy development process Engage in informed dialogue.
Advertisements

New Challenges in M&E Lets go. Scaling Up Monitoring & Evaluation Strategic Information PROGRAM GUIDANCE RESULT NEEDS OPPORTUNITIES Resources New directions.
Strategic Management & Planning
Planning: Processes and Techniques
Cartagena, Colombia, 11 March 2010 Designing and Evaluating a National Strategy for Financial Literacy Annamaria Lusardi Joel Z. and Susan Hyatt Professor.
1 Knowledge Objectives 1.Define the term strategic management and explain components of strategy formulation and implementation 2.Understand synergy and.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 12 Integration Management Practising a common, coordinated.
1 PROGRAMME FOR THE 2010 ROUND OF CENSUSES OF AGRICULTURE J A Colwell November 2005 INTEGRATION OF SURVEYS.
Assessing Statistical Systems Graham Eele – World Bank, Development Data Group.
Mukesh K Srivastava FAO Statistics Division, Rome
Integrated household based agricultural survey methodology applied in Ethiopia, new developments and comments on the Integrated survey frame work.
Planning MRK 151 Chapter 2. Planning Planning is deciding in advance what to do, how to do, when to do and who is to do. Planning bridge the gap from.
Strategic Management the art and science of formulating, implementing and evaluating crossfunctional decisions that enable an organization to meet its.
United Nations Statistics Division
Dr. István Fekete: The Role of Integrated Risk Management in Organizations April11th, Budapest.
1 Overview of the Global Strategy to Improve Agricultural and Rural Statistics Seminar on developing the capacity to produce economic statistics Part II.
CS-QI (1/4) R.2Cad & SoftA4 (290 X 217 mm) CEO Survey Sample data.
Capacity Building for Better Agricultural Statistics Misha Belkindas and Graham Eele Development Data Group, World Bank.
Strategic Planning Process for Affiliates [Insert Chapter or State Council Name Here] © SHRM 2009 Planning Today for Tomorrow’s Challenges Presented by.
Copyright 2010, The World Bank Group. All Rights Reserved. Integrating Agriculture into National Statistical Systems Section A 1.
“UNDG Toolkit” - Improved Functioning of the UN Development System at country level - – An overview of the “UNDG Toolkit” - UNDG Meeting, 30 January 2009.
Globalisation processes in the field of statistics Discussion DGINS, Budapest, 2007 Irena Križman Director-General of the Statistical Office of the Republic.
Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Planning and Strategic Management Chapter 04.
Information ITIL Technology Infrastructure Library ITIL.
Fundamentals of Planning
1 Informing a Data Revolution Getting the right data, to the right people, at the right time, on the right format Johannes Jütting, PARIS21 Tunis, 8 Decemeber.
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
Global Strategy to Improve Agricultural Statistics Food and Agriculture June 22, 2009 Organization.
FUNCTION 2 – ‘INFORMING STRATEGIC DECISION-MAKING’: Needs assessment and response gap analysis across sectors and within the sector MODULE 2 – S1.
Copyright 2010, The World Bank Group. All Rights Reserved. Planning and programming Planning and prioritizing Part 1 Strengthening Statistics Produced.
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 13: Assessing Maternity Protection in practice Maternity.
1 MANAGING AGRICULTURAL STATISTICS IN THE CONTEXT OF THE NSDS THE EXPERIENCE OF UGANDA EXECUTIVE DIRECTOR UGANDA BUREAU OF STATISTICS ISI Satellite Meeting.
Regional Developments for Improving Statistics in the Pacific Islands Presentation by the Pacific Islands Forum Secretariat, Luxembourg, 6 May 2008.
IAOD Evaluation Section, the Development Agenda (DA) and Development Oriented Activities Julia Flores Marfetan, Senior Evaluator.
Data Users Needs & Capacity Building International Programs National Agricultural Statistics Service United States Department of Agriculture November 2009.
1 Improving Statistics for Food Security, Sustainable Agriculture and Rural Development – Action Plan for Africa THE RESEARCH COMPONENT OF THE IMPLEMENTATION.
How to use the VSS to design a National Strategy for the Development of Statistics (NSDS) 1.
Copyright 2010, The World Bank Group. All Rights Reserved. Sources of Agricultural Data Section A 1.
1 Integration of Census and Surveys: Concepts related to Agricultural Holding Mukesh Kumar Srivastava FAO Statistics Division Roundtable, Samoa, March.
National Strategy for the Development of Statistics (NSDS): A Framework for Building Statistical Capacity Presented by Pali Lehohla, Statistician General,
6 th Regional Statistics Seminar November 1 st, 2013 St. Kitts Marriott, Frigate Bay Beverly Harris 6 th Regional Statistics Seminar November 1 st, 2013.
Formulating a Simulation Project Proposal Chapter3.
Project Management Learning Program 7-18 May 2012, Mekong Institute, Khon Kaen, Thailand Writing Project Report Multi-Purpose Reporting.
1 Strategic Thinking to Align Initiatives and Integrate Management, Supervision, and Practice Melody Roe, MSW Associate Director NRC for Organizational.
MONGOLIA COUNTRY CONTRIBUTION PAPER “The Availability, Timeliness, and Quality of Rapid Estimates in Case of Mongolia” Presenter: G. Gerelt-Od, First Vice-Chairman,
Consideration of the agricultural statistics assessment at national level WANG Pingping National Bureau of Statistics of China Aug. 13, Maputo.
Practical Survey Design Strategies for Minimizing MSE Lars Lyberg and Bo Sundgren Statistics Sweden
PLANNING CYCLE An Overview. CONTENT Expected achievements Expected achievements Why IWRM Planning? Why IWRM Planning? Why a strategic approach? Why a.
Kathy Corbiere Service Delivery and Performance Commission
1 Statistical business registers as a prerequisite for integrated economic statistics. By Olav Ljones Deputy Director General Statistics Norway
Copyright 2010, The World Bank Group. All Rights Reserved. Managing processes Core business of the NSO Part 1 Strengthening Statistics Produced in Collaboration.
1 SAMPLING FRAMES FOR/FROM AGRICULTURAL CENSUS Mukesh K. Srivastava FAO Statistics Division Roundtable, Samoa, March 2009.
Chapter 7 Planning and Decision Making. Planning Planning is the process of creating a direction for one or more parts of the organization. The purposes.
Framework and assessment methodology for policy coherence for development: Draft Report for OECD 16 th June, Paris Nick Bozeat.
Ce projet est financé par l’Union européenne PAGE 1 Regional Workshop on Sampling for Census of Agriculture 2010 and Agricultural Surveys October.
1 The World Census of Agriculture 2010 Programme : a Modular Approach Jack Colwell Hiek Som FAO Statistics Division MEXSAI, November 2004.
UN ECE Seminar on New Frontiers for Statistical Data Collection 31 Oct – 2 Nov 2012 Beyond 2011 The future of population statistics Andy Teague, Office.
1Your reference The Menu of Indicators and the Core Set from the South African Point of View Moses Mnyaka 13/08/2009.
Road Investment Decision Framework
Information ITIL Technology Infrastructure Library ITIL.
Short Training Course on Agricultural Cost of Production Statistics
Developing reporting system for SDG and Agenda 2063, contribution of National Statistical System, issues faced and challenges CSA Ethiopia.
Session 2: Institutional arrangements for energy statistics
UNDG Coordination Toolkit
Strategic Management & Planning
PARIS21 Workshop Strategic Statistical Planning GDDS and NSDS links July 27-28, 2005 Accra, Ghana Oliver J.M Chinganya, Regional Advisor, GDDS-Anglophone.
LIVESTOCK PRODUCTION AND PRODUCTIVITY
Technology Planning.
Power point presentation DR.Shareef Mahgoub
Presentation transcript:

Basic Concepts for Development of a National Strategy for Improvement of Agricultural and Rural Statistics  Statistics vs. Information  What is a Strategy? How do we proceed to develop this?  Integration Mukesh K Srivastava Statistics Division FAO, Rome

Challenges of a Statistician Key persons do not understand the importance of Statistics Demand is always more than the available resources can provide –human resources –financial resources Administrative processes or interested agencies continue to produce “some numbers” which are used as statistics for lack of an alternative. –lack of coordination between agencies. –turf protection

Statistics or information Is a Rapid Report on the persons affected by a natural calamity an statistics? –Level of Confidence/ Credibility –It is necessary to get this information rapidly even though it may be somewhat less reliable than that will be available from a door to survey. Administrative Reports: coming out of established systems (relevant for only short time but is needed urgently for quick intervention) –Crop Area sown –Crop condition Statistics from administrative sources –Export/ Import –Migration Historical Statistical Series: Census and Surveys – Many users different levels of tolerance of credibility The Statistics come with A Seal of Quality (confidence) Well established calendar (expectation) Neutral Source (unbiased)

Distinguish Official Statistics –multi-purpose –reliable, unbiased, produced by neutral agency Monitoring reports –special purpose –Limited to project areas Forecasts –based on assumptions, –available information Assessments Statistical methods can improve the quality of information generation.

¿What is a National Strategy?   It is a road map for development to achieve certain Goals Optimum: with in the constraints of budget and human resources Feasible: not ideal Flexible: could accelerate or decelerate inmplementation without changing the direction   It tell us: For whom to produce?: priority clients Who does what? Priority needs of the country How to do it?: sound methodology, best use of resources   A plan of action follows from the Strategy

 The Goals  The problems (Challenges) –Identification: real vs. imaginary –Define precisely the issues to be focused  Analysis of present situation –Strengths, –Weaknesses, –Opportunities and –Threats  Brain Storming involving all stake holders, without prejudice  Search for solutions (options)  Evaluations of options from different angles –(users, interest groups, donors, government, public, implementers...) Steps to develop a strategic vision

 Develop a shared National Vision  Strategy: a vision to follow for long term (10-15 years) –From where to begin? –What road to follow? –Consider scenarios (most favorable and the worst) –Flexibility: preparatory action for risks  Planning: for both scenarios (5 year) –Long term and short term –Concrete objectives and resources  Implementation: on the basis of available resources –year by year  Revision of Plans: according to changes in priority, maintaining the strategy (ex. high way, livestock)

¿What is an Integrated System? A set of similar objects

And this one? Savings of efforts and resource Move together in synergy and efficiently

Integration of Statistics ¿Why? –Cost-efective production and avoidance of duplication of efforts –Coherent Statistics –Greater Scope of Analysis ¿How? –Shared cartographic material, classification, standards, concepts, definitions…. –Planinning of all the surveys in an integrated manner: A national calender of surveys –Integrated Samping design for all the surveys in the calender.

¿Does there exist a ready made product ? The design is developed as per: - the national requirements and - the available resources

More benefits Flexibility  differnt agencies can implement the module in which they are interested,  at differnt times,  in differnt zones of their choice,  according to avaialbility of resources,  Leave the door open for  more survey modules to be added to the plan based upon already existing master sample frame, or  to drop modules in case of budget cut.

Shukaran Jazeelan.