ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for.

Slides:



Advertisements
Similar presentations
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Advertisements

IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
IPBSM status and plan ATF project meeting M.Oroku.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
For Draft List of Standard Errors Beam Dynamics, Simulations Group (Summarized by Kiyoshi Kubo)
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Stabilization of Focus at ATF2 David Urner University of Oxford.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
BPM support and beam pipe length FD support status A.Jeremie.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
ATF2 Magnets Results of the Field Measurements of three ATF2 DEA Dipoles by Single Stretched Wire and Hall Probe at IHEP over past 2 months: updated report.
ATF2 Magnets ATF2 Magnets 7 Oct 08,ATF2 weekly meeting Cherrill Spencer Report ATF2 FD Quads: Mech Msts 1 Report on the mechanical measurements of ATF2.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Plan in summer shutdown Magnet -SF1FF -Swap of QEA magnet - Multipole field of Final Doublet IP-BSM improvement.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
Beam Dynamics IR Stability Issues Glen White / SLAC September IRENG07 Vibration tolerances for final doublet cryomodules Settlement of detector.
MONALISA Update David Urner ATF2 Meeting Dec
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
Integrated ATF2 Dynamic Tuning Simulations Glen White, LAL/SLAC ATF2 Software Workshop June 2008 Simulation overview. Tuning for 37nm IP vertical beam.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
IP Tuning Task Updates Glen White, SLAC January
Alignment and stability session
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Summary FD Support System
ILC BDS Alignment, Tuning and Feedback Studies
Emittance Diagnostics
Tolerances & Tuning of the ATF2 Final Focus Line
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
ATF2 IP Tuning Task Simulation Updates
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy
Brief Status Report on Fabrication of ATF2 Quads
IP configuration session
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Presentation transcript:

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for discussion Cherrill Spencer, SLAC Member of ATF2 Magnet Team

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 2 Main issues to be brought up today- not expecting to find resolution today Are 3 sets of ATF2 magnets that are being “made from” old SLAC magnets: –Final doublet quads: QF1 and QD0 –Final doublet sextupoles: SF1 and SD0 –Final focus sextupoles: SD4,SF5 and SF6 These 3 sets cannot be modified to fit in with the KEK way of aligning magnets (problem will be described in detail in this presentation)

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 3 Main issues continued The magnet roll tolerances given in figure 3.6 on page 16 of chapter 3 of the ATF2 proposal are extremely tight and probably not achievable: –Approx 40 μrads for the FF quads & sexts –Approx 5 μrads for QF1 and QD0 –Between 0.5 and 2 μrads for FF bends :B5,B2,B1 Magnets must be aligned with smaller rolls than this else the spot size will increase by 2% I have been consulting with Glen White who is running detailed simulations of the ATF2 beamline and tracking 1000s of particles passing through the magnets which have a variety of alignment errors and then he sees if he can tune the beamline to get the desired spot size- will show his alignment errors/tolerances later

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 4 Conventional Alignment Optical tooling balls are secured on the magnet: at SLAC we “fiducialize” all the tooling balls: work out how far from each tooling ball center to the magnetic center or mechanical center. Robert Ruland, SLAC

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 5 SLAC’s process of aligning a magnet- more info This sphere has a specially shaped reflector – center of reflector is at center of the sphere. Beam of laser light is bounced off reflector and can work out where ball is to a few microns. Spheres are placed without any precision on the outside of all magnets. Using pulsed stretched wire to find magnetic center and a coordinate measuring machine (CMM) to make mechanical measurements, can relate the spheres’ positions to the magnetic center. This process is called FIDUCIALIZATION. Every magnet has to be fiducialized BEFORE it is put in the beamline- each magnet has a unique identity. The fiducialization data is kept in a DATABASE “for ever”; alignment crew refer to it whenever they align a magnet.

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 6 KEK’s method of aligning magnets uses a reference alignment base- is placed VERY PRECISELY on top of magnet so a target inserted in central hole lines up with the magnetic center to within the alignment tolerance Drawings of alignment base made for the ATF2 QEA quads and DEA dipoles (are brand new magnets). Units are inches – so quite large item

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 7 ATF2 QEA quad with alignment plate and target.

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 8 Measurement system at KEK Ceramic coil for rigidity, smaller thermal expansion Bobbin is made of Macor. Air bearing, for smoother rotation Reference plate (基準面) for alignment Room & water temperature are controlled. Electronics (Integrator etc) are kept on all the time.

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 9 Big problems with magnet & alignment base machining : 3 cases –from Masuzawa talk on QEA measurements Correct case Alignment base center Split line between the cores Bore center Must be aligned. (1) Magnet bore is not aligned. How could this happen?? EDM process??? (2) Alignment base is not aligned. (3) (1)&(2) mixed.

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 10 2 mrad, we think this is not fake (coming from the System) but real difference from each magnet. Quadruple phase (median plane) for 2nd batch 50 A magnets 水平 Alignment base is not parallel to the magnet plane. Variation too large

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 11 The magnet core has to be designed from the start to use these plates in the way KEK tends to use them BUT :cannot add such a plate in the necessarily precise way after the magnet has been designed and made. The core pieces have to be toleranced to accommodate the base. How these alignment bases might fit on the FD quads.

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 12 How were these FD quads aligned in FFTB: with special apparatus Invar tooling plates, so do not change size with temperature variation. Aiming for < 30 micron errors.

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 13 An FFTB quad in FFTB with its alignment apparatus Invar tooling plate

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 14 Problem because of the difference between KEK’s and SLAC’s alignment techniques 2 sets of SLAC magnets will be fiducialized using SLAC style tooling ball and alignment process, then will be magnetically measured at SLAC– I think KEK does not have the equipment to measure them at KEK. HOW to align them in the ATF2 beamline?

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 15 Brand new ATF2 FF dipole- just completed at IHEP, with 2 alignment bases

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 16 From Glen White: Static Error Parameters Assume movers on all FF and FD quadrupoles and sextupoles. Cavity BPMs fixed to all FF Quads + Sexts. Also assume IP BPM with 5nm RMS resolution. Model for SM measurement: mean spot size from 90 consecutive pulses +/- RMS error. Quad, Sext x/y transverse alignment 200 um Quad, Sext roll alignment (including QF1 & QD0) 300 urad Initial BPM-magnet field center alignment 30 um dB/B for Quad, Sexts1e-3 syst. + 1e-4 random Mover resolution (x & y)50 nm BPM resolutions100 nm Power supply resolution14 - bit Shintake Monitor Resolution 2nm

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 17 Tuning Results- from Glen White CaseMedian Spot Size / nm Initial EXT Tuned Lattice36.2 FFS Errors + GM ‘A’37.6 GM ‘A’ (Turn off EXT Sexts)38.6 ATF GM (EXT Sexts on) (no BEND errors)38.2 As Above but: 600 urad magnet roll errors40.9 As Above but: 150 urad magnet roll errors37.8 As Above but: add 1mr RMS BEND roll errors 37.9 ‘Nominal case’

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 18 Conclusion from Glen’s simulations Can ignore the tolerances in fig 3.6 in proposal and use his much looser tolerances – still tight but do-able with SLAC’s alignment techniques. But what about when they have to be put into ATF2 beamline at KEK? How/can will KEK use our fiducialization data.

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 19 FF sextupoles have SLAC tooling balls – how to align them at ATF2? Sockets to hold SLAC tooling balls. This sextupole has 6 sockets.

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 20 Same problem with the small sextupoles to be used in FD. Sockets to hold SLAC tooling balls

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 21 Another problem– fitting in the MONALISA apparatus on top of QD0! Place a very flat and precise thickness shim in each split plane to “explode” the quad and enlarge the bore diameter. Shim will be low carbon steel, ground to ” flatness

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 22 Info from David Urner re putting MONALISA on top of QD0 We will have to stabilize QD0. The stabilization will connect QD0 to the Shintake monitor table. Indeed we will not be ready by next January. More likely by January We can of course bring a dummy system earlier if that would help. We would indeed need the LCWS hoses moved so that we can extend our platform. Alignment transfer: I agree that this needs some thought. I could imagine two different approaches: 1. Assuming you would use two alignment plates. They look fairly sturdy, so we could mount our base-plate on it and transfer the alignment using external theodolites. (Although I'm not sure that they have those available at KEK, we would have to inquire.) 2. What about putting a rectangular tube on top of the magnet. When we are ready we would slide our interferometer setup inside that tube. And you could mount the ATF2 alignment base-plates on top of it?

ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 23 Space on poletip end is limited by the G10 clamps which exist on BOTH ends of the final doublet quads Urner et al want to mount a retro-reflector on a QD0 poletip end, I suppose on the upstream end? BUT HOW TO FIT IN WITH BPM and its adapter which cover up the poletips ? At the “terminal end” the maximum space between the G10 piece and the tip of the pole is 0.6” At the non-terminal end this space is 1”. BUT THIS SPACE WILL HAVE SMALL STEEL BUTTONS TO REDUCE 12-pole component. THESE INTERFERENCES HAVE TO BE RESOLVED!