European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles.

Slides:



Advertisements
Similar presentations
European Organization for Nuclear Research LHC GCS Recipes Geraldine Thomas 11 December 2009.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
SOFTWARE TESTING. Software Testing Principles Types of software tests Test planning Test Development Test Execution and Reporting Test tools and Methods.
1 OBJECTIVES To generate a web-based system enables to assemble model configurations. to submit these configurations on different.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
FUNDAÇÃO PARA A CIÊNCIA E TECNOLOGIA FCT Trainee Program Follow Up João Rodrigo Alvelos Ferreira | Started March 2013 October 2014 TE-VSC-ICM.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
UNICOS Objects (CPC) 11/02/14 UNICOS, CERN1 CERN, EN/ICE, UNICOS Team.
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Introduction to Software Testing
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Software Testing Test Design and Implementation. Agenda Test Design Test Implementation Test Design Sources Automated Testing 2.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA UNICOS: UN IFIED I NDUSTRIAL CO NTROL S YSTEM CPC (C ONTINUOUS P ROCESS C ONTROL ) SCADA 1 Marco Boccioli -
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Automatic Generation Tools UNICOS Application Builder Overview 11/02/2014 Ivan Prieto Barreiro - EN-ICE1.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
European Organization for Nuclear Research LHC Gas Control System Applications G.Thomas, J.Ortola Vidal, J.Rochez EN-ICE Workshop 23 April 2009.
 Mathias Dutour / UAB Dev. team  UNICOS regular meeting  29 January 2009.
11/03/2003LHC GCS - JCOP ER1 LHC GCS Renaud Barillère – CERN IT-CO.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
UNICOS-PVSS evolution Hervé Milcent (EN-ICE-SCD) 06/09/2010.
FAIR Accelerator Controls Strategy
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
MARCO UNICOS based control system CERN Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]
1 JCOP-UNICOS. 2 Purpose of this meeting Requested by IT/CO To present you the UNICOS requirements on the hierarchy classifications Not to discuss the.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
“The LHC GCS Framework” Geraldine Thomas CERN, IT-CO A complete PLC and PVSS automatic code Generation.
UNICOS Roadmap 2015 Enrique Blanco On behalf of the UNICOS team EN-ICE 1 March 2015 CERN March 27, 2015 GSI - CERN Collaboration.
60kW Thermosiphon control system
Atlas Gas Systems - CPC6 Upgrade and Re-Commissioning Infrastructure Meeting – 8th January 2014 Steve Pavis PH-DT-DI/Gas.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
JCOP - 17 October 2001NA60_GAZ - E. Mazel J. Rochez1 A Project for the GAS control System At NA60.
Thermo-siphon Control Design Lukasz Zwalinski – PH/DT Alexandre Moraux – PH/DT
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
Tunnel Cryogenics Instrumentation & Controls for the LHC Enrique Blanco AB/CO IS.
Chiller + Brine + Water control system UNICOS CPC Lukasz Zwalinski – PH/DT.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
UAB Requirements for 2016 Ivan Prieto Barreiro 18/04/2016 UAB Requirements for
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
Alice TOF Production Readiness Review Gas Control Systems.
- My application works like a dream…does it. -No prob, MOON is here. F
UNICOS Application Builder Architecture
L25 - PlantPAx Process Application Development Lab I
Gas system Commissioning procedures and status
CV PVSS project architecture
Gas System Commissioning
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 4: SCADA UCPC 6 UNICOS-Continuous Process Control Check.
Maintaining software solutions
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
PLCs integration into the ICS
PSS0 Configuration Management,
Presentation transcript:

European Organization for Nuclear Research LHC Gas Control System Applications Generation to Deployment phases Strategy/Principles

European Organization for Nuclear Research Dev. Phases/interactions with customer Deployment Commissioning URD EN-ICE Capture of the functional requirements of the systems for the process & supervision layers Agreement on the needs between provider & customer EN-ICE Validation of the application in the lab Design Code implementation Tests (logic, IO signals, etc…) Packaging App. Generation (Release) EN-ICE Installation of the new application in-situ Loading of PLC application Setup of PVSS application Load of recipes Pass the system to Gas experts PH-DT1 Tests of application before production Hardware connection tests Functional tests Final tuning of thresholds & set points Training of Gas team members Gas Expert (PH-DT1) Provider (EN-ICE)

European Organization for Nuclear Research GCS tools for application generation

European Organization for Nuclear Research Generation – building (in the lab) steps/strategy Generation of all application configuration files for PVSS and PLC (OLProc and XML Generator) PVSS –Building and Configuration of the application Installation of PVSS components (unicos & gcs) Configuration of components (anomalies, recipes, dip) Configuration of application specific to Exp (PVSS Project setup, SMS, LDAP, ORACLE, etc…) Extract production configuration files and combine with generated ones (users, recipes, dip..)

European Organization for Nuclear Research Tests –packaging (in the lab) PLC tests (with a PVSS version) Software logic tests (unit tests) Connection I/O tests (PLC wago with ioscanning, etc..) PVSS integration tests (once app. Has been built) Tests without PLC connection Check components have been configured correctly Link to panels from WT, faceplates (Diag), etc No purple objects, etc…. Tests with PLC connection Mainly address config tests (with recipes/ check for cyan objects, etc…) Packaging of the PVSS application

European Organization for Nuclear Research Deployment (in-situ) DS setup (according to EXP infras.) OWS setup (if valid Installation of PVSS project Connection to PLCs Dowload of recipes.

European Organization for Nuclear Research GCS maintenance and upgrades Types of upgrades New version of PVSS-UNICOS FW versions New system/modules to integrate Bug fixes Methodology Any new request is first analyzed in URD before implemented Validation of application in lab Tools Configuration source code management tools (CVS, savannah)

European Organization for Nuclear Research Generation Rules to configure synoptics

European Organization for Nuclear Research Generation Rules to configure navigation buttons

European Organization for Nuclear Research Output file of XML Generator (for navigation buttons)

European Organization for Nuclear Research GCS scope 4 Experiments ~23 std gas systems to build Commonalities Standard devices Valves, flow meters, mass flow controllers, etc… Limited number of exotic devices (Webmas, ELMB ) Modular architecture Mixer, Distribution, Pump, Analysis, Purifier, etc… Diversity Optional modules Options in modules

European Organization for Nuclear Research GCS diversity

European Organization for Nuclear Research ICALEPCS FR2.3-6O 13 Gas system layout Purifier Mixer Recovery Pump Primary Gas Supply Analysis USA 15 UX cavern Analysis Distribution Gas building Functional modules Other Modules CO2 Absorber, CO2 Envelope, Exhaust Humidifier

European Organization for Nuclear Research ICALEPCS FR2.3-6O 14 Gas modules’ diversity Gas x 0 T T PT Optional devices Architecture variation PT

European Organization for Nuclear Research GCS objectives -> Provide homogeneous end-user applications What we provide Build turnkey control application Supervision layer Synoptic views and navigation, alarm handling, recipes Process Control layer I/O, FSM ???, interlock, common logic Define and setup the control infrastructure in Exp What we don’t provide Setup of hardware equipments and instrumentation

European Organization for Nuclear Research GCS strategies/principles Strategy Gas systems’ architecture based on a generic model Use industrial technologies SCADA, PLC, fieldbuses Use of UNICOS FW and code generators tools Principles Model-oriented design for both Supervision & Process control Automatic generation of input files for the supervision and process layers Tools to automate the PVSS code production ???

European Organization for Nuclear Research GCS operational support Types of support cases Bad configuration parameters (archive, deadband, stop of plc, …) Exp Infrastructure problems (remote access, dip data, etc..) Support level First Line (PH-DT1 gas piquet) Second line support based on best effort (EN-ICE) Tools Remedy for any problems or requests Savannah for bug & patch tracking

European Organization for Nuclear Research GCS maintenance and upgrades Types of upgrades New version of PVSS-UNICOS FW versions New system/modules to integrate Bug fixes Methodology Any new request is first analyzed in URD before implemented Validation of application in lab Tools Configuration source code management tools (CVS, savannah)

European Organization for Nuclear Research Pros and Cons Pros Based on existing software control libraries (UNICOS Fw) Keep homogeneity across systems Open architecture –extensibility/flexibility Autonomy of users during commissioning and operation Cons No control on equipment setup and configuration Synchronization between PH-DT1 and EN-ICE for tests Libraries dependencies Any modification requires an upgrade of many documents.