SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.

Slides:



Advertisements
Similar presentations
Status of the ATLAS MM project
Advertisements

1 Prototyping Megaton-Scale  Detectors Jason Trevor DOE Review July 25, 2007 Developing a New Lower-Cost Scintillator Design.
Simulation of a Magnetised Scintillating Detector for the Neutrino Factory Malcolm Ellis & Alan Bross Fermilab International Scoping Study Meeting KEK,
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
T1008 status W.Baldini for the Ferrara and Padova SuperB-IFR Group.
US ILC Muon Detector and Particle ID R&D DOE/NSF ILC Detector R&D Review Argonne National Laboratory June 19, 2007 Paul E. Karchin Wayne State University.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Cost for Large Liquid Scintillator Detector Ken Heller University of Minnesota Active Detector – Liquid Scintillator Target Material - Water Read Out –
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
Liquid scintillator for an off-axis neutrino detector? (The Minnesota group) We are actively investigating a liquid scintillator option for the off-axis.
J.S. Suh The Second Korean ILC Workshop Plastic Scintillator Detector for ILC Jun-Suhk Suh KNU/CHEP.
SID muon detector R&D G. Pauletta University of Udine and INFN Trieste/Udine LCTW09, Orsay 3 Nov 20091G. Pauletta.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Status report on MURAY telescope R&D
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
Agenda for LC Muon Detector Studies Mtg Black Hole Tues. Aug. 5 12:30 – 14:00 Parts for the prototype planes. 15 min.Gene Fisk MAPMT FE electronics/cal.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
The NA62 rare kaon decay experiment Photon Veto System Vito Palladino for NA62 Coll.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
Start and Vertex Detector W. Boeglin, A.Klein Current Design: 3300 scintillating fibers 1mm diameter 3 double layers (1 axial, 2 stereo) cylindrical geometry.
Lei Xia ANL – HEP. Physics prototype: proof of principle Linearity CALICE SiW ECAL.
V. Korbel, DESY1 Progress Report on the TESLA Tile HCAL Option To be filled soon.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
LC Muon Detector Development Overview Hardware R&D Goals Hardware Configuration Design Issues Procurement, Engineering, Manpower Additional Development.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
Strip-scintillator/Si avalanche photo-diode Muon System Fermilab Test beam + Inst INFN Udine APDs Notre Dame Scint /WLS Baseline: Resistive Plate Chambers.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Super-IFR Detector R&D summary Wander Baldini Ferrara, Padova, Roma1 INFN and University on behalf of the superB-IFR group: Ferrara, Padova, Roma1 INFN.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
IFR Status Report W. Baldini, on behalf of the Ferrara SuperB-Group XIV SuperB General Meeting, Frascati Sept.27 – Oct
Concepts Beyond the Neutrino Factory Baseline Design Detector R&D Alan Bross, Malcolm Ellis, Steve Geer, Olga Mena, Silvia Pascoli.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Scintillator-based Muon System G. Fisk, A. Para, P. Rubinov - Fermilab, D. Cauz, A. Driutta, G. Pauletta - IRST/INFN-Udine, R. Van Kooten, P. Smith - Indiana.
N. Anfimov a, V. Anosov a, I. Chirikov-Zorin a, D. Fedoseev a, O. Gavrishchuk a, N. Khovanskiy a, Z. Krumshtein a, R. Leitner b, G. Meshcheryakov a, A.Nagaytsev.
Magnetized Iron Neutrino Detector MIND Technology & Engineering.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Straw man layout for ATLAS ID for SLHC
Si Sensors for Additional Tracker
IFR Detector R&D status
Roberto Calabrese Ferrara University and INFN
SiD R&D Plan and Opportunities for New Collaborators
H.E. Fisk, A. Meyhoefer, A. Para, E. Ramberg, P. M. Rubinov Fermilab
Detailed Baseline Design - Muons
Experimental Method: 2 independent detectors on both sides of IP
EURONu Collaboration Board,
Technical Design for the Mu3e Detector
IFR Status Summary W. Baldini on behalf of the IFR Group
Muon Strip-scintillator + WLS + Pixelated Photon Det. Testing
IFR detector mechanics
ILC Detector Activities in Korea
Tail-Catcher/Muon Tracker Prototype
GEM-based Digital Hadron Calorimetry for SiD
Vishnu V. Zutshi For the NICADD team.
GEM-based Digital Hadron Calorimetry for SiD
Experimental Method: 2 independent detectors on both sides of IP
General Introduction to IFR
LC Muon Detector Development Overview
Presentation transcript:

SiD Muon Detector Progress

Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots. We assume slots are ~32mm and Fe is about 200mm, with 10 slots instrumented.

Detailed Baseline Design Barrel (z) strip-scintillator 5.5 m long. (r,  ) strips perpendicular to (z) strips. Large planar modules ~ 5.54m X 3.8m ~ 21m mm diameter WLS fiber in extruded hole? Si avalanche photo-diodes-pixelated photon det. Significant testing of long strips, but no construction of modules. Production tooling needs to be designed, built and used on proto- types. Common electronics: KPiX.

ComponentNo.UnitMaterialsMConting.LaborLConting.Total Muon Tracker1 ea8,299,9003,038,9652,854,857925,49515,119,222 Muon System ED&I1 ea02,039,930698,6282,738,562 Mechanical Engineer4 man yr0140,00049,000756,000 Mechanical Designer4 man yr091,52032,032494,208 Alignment Engineer1 man yr0102,32020,464122,784 Mechanical Tech10 man yr0101,15335,4041,365,570 Muon System Mechanical & Det1 ea8,299,9003,038,965814,927226,86812,380,660 Muon Sys Tooling & Accessories1 lot1,000,000500,000001,500,000 Muon Module (= 1 m 2 )4300 ea1, ,445,244 Level 1 Concentrator Prod160 ea1, ,380 Level 2 Concentrator Prod16 ea4,6001, ,036 Muon Tracker Electronics1 ea100,00020,000987,318246,8301,354,148 Preliminary Engineering0 ea500,000100,000455,906113,977 R&D1 ea500,000100,000227,95356,988884,941 Design & Prototype1 ea00227,95356,988284,941 Final Engineering1 ea100,00020,000987,318246,8301,354,148 Production Engineering1 ea00227,95356,988284,941 Installation & Comissioning1 ea100,00020,000759,365189,8411,069,206 Production Costs0 ea00000 Level 1 Concentrator, Muon0 ea1, Level 2 Concentrator, Muon0 ea4,6001, SiD Muon Strip-Scintillator Detector Cost Estimate

Module concept (w/o RO) 6 Detector module detail with dimensions Sandwich of Al skin (3 layers) Glue (4 layers) Scint (2 layers) X y Thickness is 3.38 cm

WLS fiber & photo-detectors Minimal efforts for SiD, but active efforts for mu2e cosmic ray veto. d Addressing – cost, – “value engineering” – QA – Radiation hardness – Coupling, assembly Fiber cost based on current quotes for mu2e: 18k ch 7

Channel counting, etc. 8 Detector totals Number of modules 160 ea Number of strips ea Total area of strips 8603 sq m Total area of modules 4301 sq m Length of WLS m Number of SiPMs ea Front ends (32 ch) 1590 ea L1 concentrators 160 ea L2 concentrators 16 ea

Strip dimensional stability 9

Conceptual design for SiPM to fiber coupling 10 Flycut after fiber guide bar is attached to the extrusion Works for either single sided or double sided readout

WLS fiber & photodetectors No active efforts for SiD, but active efforts for mu2e cosmic ray veto Addressing – cost, – “value engineering” – QA – Radiation hardness – Coupling, assembly Cost based on current quotes for mu2e (18k ch) 11

Electronics Should not be driven by muon tracker – Large signals – No discharges – KPIX should work fine Issue is channels are physically spread out – Reduce number of channels used for each chip 12

Assembly Thinking about module assembly in some detail – 17 steps (so far) – Measuring strips – Aligning the strips and holes – Doing a dry layup – Installing the fibers – Gluing everything together 13

WLS Fiber and Strip Scintillator Cost 5 km WLS fiber 1.2 mm dia. for $16,400. $3.28/m km WLS fiber 1.2 mm dia. for $252,720. $5.73/m /3.28 = m 9/15/2003 cost $5.20/m; 3000m 9/2012 cost $26,000 or $8.667/m Strip Scintillator $8.667/$5.20/ =1.665

Strip scintillator 9/15/2003 2,727m from Itasca Plastics at a cost of $5.20/m 9/2012 3,000m $26,000 or $8.667/m

Costing 16

Channel counting, etc. 17 Detector totals Number of modules 160 ea Number of strips ea Total area of strips 8603 sq m Total area of modules 4301 sq m Length of WLS m Number of SiPMs ea Front ends (32 ch) 1590 ea L1 concentrators 160 ea L2 concentrators 16 ea

ComponentNo.UnitMaterialsMConting.LaborLConting.Total Muon Tracker1 ea8,299,9003,038,9652,854,857925,49515,119,222 Muon System ED&I1 ea02,039,930698,6282,738,562 Mechanical Engineer4 man yr0140,00049,000756,000 Mechanical Designer4 man yr091,52032,032494,208 Alignment Engineer1 man yr0102,32020,464122,784 Mechanical Tech10 man yr0101,15335,4041,365,570 Muon System Mechanical & Det1 ea8,299,9003,038,965814,927226,86812,380,660 Muon Sys Tooling & Accessories1 lot1,000,000500,000001,500,000 Muon Module (= 1 m 2 )4300 ea1, ,445,244 Level 1 Concentrator Prod160 ea1, ,380 Level 2 Concentrator Prod16 ea4,6001, ,036 Muon Tracker Electronics1 ea100,00020,000987,318246,8301,354,148 Preliminary Engineering0 ea500,000100,000455,906113,977 R&D1 ea500,000100,000227,95356,988884,941 Design & Prototype1 ea00227,95356,988284,941 Final Engineering1 ea100,00020,000987,318246,8301,354,148 Production Engineering1 ea00227,95356,988284,941 Installation & Comissioning1 ea100,00020,000759,365189,8411,069,206 Production Costs0 ea00000 Level 1 Concentrator, Muon0 ea1, Level 2 Concentrator, Muon0 ea4,6001, SiD Muon Strip-Scintillator Detector Cost Estimate

Thanks to Organizers and colleagues! Colleagues who have spent long hours at the Test Beam! And long hours thinking about our problems and their solutions Contributors to this talk: Henry Band Marty Breidenbach Gene Fisk Dave Hedin Kurt Krempetz Giovanni Pauletta Paul Rubinov

WBSComponentNo.UnitMaterialsMConting.LaborLConting.Total 1.1.6Muon Tracker1 ea8,299,9003,038,9652,854,857925,49515,119, Muon System ED&I1 ea02,039,930698,6282,738, Mechanical Engineer4 man yr0140,00049,000756, Mechanical Designer4 man yr091,52032,032494, Alignment Engineer1 man yr0102,32020,464122, Mechanical Tech10 man yr0101,15335,4041,365, Muon System Mechanical & Det1 ea8,299,9003,038,965814,927226,86812,380, Muon Syst Misc Tooling & Acces1 lot1,000,000500,000001,500, Muon Module Module = 1 m^24300 ea1, ,445, Level 1 Concentrator Prod160 ea1, , Level 2 Concentrator Prod16 ea4,6001, , Muon Tracker Electronics1 ea100,00020,000987,318246,8301,354, Preliminary Engineering0 ea500,000100,000455,906113, R&D1 ea500,000100,000227,95356,988884, Design & Prototype1 ea00227,95356,988284, Final Engineering1 ea100,00020,000987,318246,8301,354, Production Engineering1 ea00227,95356,988284, Installation & Comissioning1 ea100,00020,000759,365189,8411,069, Production Costs0 ea Level 1 Concentrator, Muon0 ea1, Level 2 Concentrator, Muon0 ea4,6001,