Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting 25-26 November 2010 / CERN.

Slides:



Advertisements
Similar presentations
Neutrino Town Meeting CERN – May 14-16, 2012 SPL R&D and Potential Applications R. Garoby for the SPL team* O. Brunner, S. Calatroni, O. Capatina, E. Ciapala,
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
ESS linac Mats Lindroos, Cristina Oyon and Steve Peggs.
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
Report from WG 3: Cryomodules (design & integration, construction, assembly) V.Parma, CERN, TE-MSC With contributions from O.Capatina, CERN, EN-MME 2nd.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
LAGUNA meeting September , 2010 CAES – CNRS – Aussois - FRANCE Prospective Proton Drivers for neutrino facilities at CERN 8/09/2010 R. Garoby.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
1 PS Days - Evian / MV The SPL : a High-Power Superconducting H – Linac at CERN  Motivations  Applications  Design features  Improvements.
Linac4 Status 1 M. Vretenar sLHC public event
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
WP2 status Gijs de Rijk This project has received funding from the European Community's Seventh Framework Programme (FP7/ )
RF Summary SLHIPP – 1 o. brunner BE-RF. RF sources and beam dynamics: o Magnetrons (Amos Dexter Lancaster Univ. ) o LLRF for the SPL SC cavities (Wolfgang.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Report Working Group “Cavity design and construction” 1 SPL collaboration meeting Vancouver 8-9 May 2009revised by W. Weingarten on 30/4/2009  Status.
Report from WG2 (cavity) and objectives of the meeting W. Weingarten / CERN 3 rd SPL Collaboration Meeting CERN 11 – 13 Nov /Nov/2009 W. Weingarten13rd.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
8-10 January Paris Diderot University High Power Protons Drivers for Beams in Europe R. Garoby [using material from M. Dracos (CNRS), T. Ekelof.
R. Garoby for S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo, R. Bonomi, O. Brunner, S. Calatroni, O. Capatina, J. Chambrillon, F. Gerigk, M. Guinchard,
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Thomas Jefferson National Accelerator Facility Page 1 FNAL September 11, 2009 Design Considerations for CW SRF Linacs Claus H. Rode 12 GeV Project Manager.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
SLHC The SPL at CERN 1.Introduction 2.Description -Stage 1: Linac4 -Stage 2: LP-SPL 3.Possible future stages 4.Goal and status of the SPL study R oa Garoby.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
WP5 Elliptical cavities
SPL R&D at CERN R. Garoby for S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo, R. Bonomi, O. Brunner, S. Calatroni, O. Capatina, J. Chambrillon, F.
Uppsala Commitment to ESS and FREIA Planning
WG-1 Session Cavity Performance Cryomodule Performance
Plans for a Superconducting Proton Linac at CERN
Second SPL Collaboration Meeting, Vancouver May 2009
ESS RF Development at Uppsala University
Superbeams with SPL at CERN
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
HIE-LINAC status report
Plans for new LHC injectors R. Garoby
Progress towards Pulsed Multi-MW CERN Proton Drivers
Nick Walker (DESY) EU GDE Meeting Oxford
SLHC-PP kick-off meeting, CERN 9 April 2008
The SPL-based Proton Driver at CERN
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN

25/11/20102 OUTLINE 1.Updated plans for the SPL R & D 2.Recent progress 3.Near future… R.G. 

CERN Medium Term Plan /11/20103R.G. …… … …

Summary from CERN MTP No construction of LP-SPL and PS2. Termination of studies to allow for the LP-SPL and PS2 to remain as possible fall-back solutions. Continuation of SPL R & D for high beam power in view of potential use in a neutrino facility. Continuation of SPL R & D for high beam power in view of potential use in a neutrino facility. Material budget: 2 MCHF/year Material budget: 2 MCHF/year Upgrade of the existing LHC injectors [e.g. increasing the PSB to PS transfer energy] Consolidation and upgrade of PSB, PS and SPS. 25/11/20104R.G. « LIU » Project Completion in ~2016

Option 1Option 2 Energy (GeV)2.5 or 52.5 and 5 Beam power (MW) 2.25 MW (2.5 GeV) or 4.5 MW (5 GeV) 5 MW (2.5 GeV) and 4 MW (5 GeV) Rep. frequency (Hz)50 Protons/pulse (x )1.12 (2.5 GeV) + 1 (5 GeV) Av. Pulse current (mA) 2040 Pulse duration (ms)0.9 1 (2.5 GeV) (5 GeV) Beam characteristics of the main options 2  beam current  2  nb. of klystrons etc. HP-SPL basic characteristics 30/06/20105R.G.

Objectives of the SPL R & D (in continuity with the work previously done for the LP-SPL) Motivation Preserve potential for some alternative physics programmes (Neutrinos, RIB) Preserve possibility of new injectors at long term Update CERN competences in superconducting RF Description Focused on high beam power R & D only (no work on integration / civil engineering / environmental impact) Main objectives End : ~simultaneously with the PS2 CDR): LP-SPL CDR 2013: High power test of 4 sc cavities in a short horizontal cryostat SPL CDR Beyond 2013: Construction of a full size cryomodule, development of full performance modulator... Study and development in view of a specific project (neutrino facility?): integration, safety, civil engineering environmental impact study... 25/11/20106R.G.

SPL R & D subjects until 2015 (in continuity with the work previously done for the LP-SPL) H - source R & D( to be continued after end of SLHC-PP for the needs of Linac4) Study of the optimum high power RF architecture for a high power SPL Design, construction and test of superconducting RF cavities (704 MHz – 5 cells –  =1) Development of high power RF coupler, HOM damper and adaptation of tuner Upgrade of the SM18 test place [2 K cooling + pulsed RF source at 704 MHz (1 50 Hz )] Pulsed high power RF tests of contiguous cavities in a common cryostat (Design, construction and test a high power klystron modulator: delayed) (Design, construction and test of a prototype cryomodule equipped with 8  =1 cavities: delayed) Treated in sLHC-PP Partly addressed in sLHC-PP Partly addressed in “EuCARD” Partly supported by French “in- kind” contrib. With ESS support for the modulator 25/11/20107R.G.

Planning for cavities and cryomodule Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4 SM18 - 2K Cryogenics V cryo. X SM18 modulator 1 SM MHz High Power RF X High Power RF couplers Superconducting cavities 4 8 Assembled string of 4 cavities X Horiz. test cryostat (4 cav.) X Equipped horiz. test cryostat X High power RF tests in test cryo. X Assembled string of 8 cavities X 8 cavities cryomodule… X Conceptual Design Report XX From industry (ESS) CERN design ~ in-phase with ESS design update 25/11/20108R.G. + 2 years CDR & future plans ?

CoordinatorExternal partners RF hardware (low level & high power) E. CiapalaCockcroft Institute, ESS + (FNAL, SNS, JLAB, ANL) Cavities (structures & auxiliary equipment) W. WeingartenCEA-Saclay, CNRS-Orsay, TRIUMF, Stony Brook + RHUL + (JLAB, SNS) Cryomodule (cryostat & cryogenics)V. ParmaCEA-Saclay, CNRS-Orsay, Stony Brook + (FNAL) Beam dynamics (beam parameters)A. LombardiCEA-Saclay, TRIUMF, Soltan Institute, ESS Architecture (layout & geometry, extraction, transfer) F. Gerigk Surface treatment and vacuumS. Calatroni Mechanical design and construction O. Capatina Working Groups Study leader: R. Garoby Organization (Reminder…)  SPL documentation in EDMS [ ] SPL documentation  SPL meetings in Indico [ ] SPL meetingshttp://indico.cern.ch/categoryDisplay.py?categId=1893 SPL Collaboration 25/11/20109R.G.

SPL Work Packages inside CERN 25/11/201010R.G. Integrated planning in preparation Separate budget codes at the beginning of 2011 Cryomodule (V. Parma) Cavities (W. Weingarten/O. Capatina) RF couplers (E. Montesinos) RF for SM18 (O. Brunner) Diagnostics and infrastructure in SM18 (W. Weingarten) Cryogenics in SM18 (L. Tavian) General (R. Garoby)

Related R & D (Proposals) 1.Nb coating of Cu cavities, using the HIPIMS (High Power Impulse Magnetron Sputtering) technology – In collaboration with Sheffield Hallam University (UK). – Supported in the context of the construction of LHC spare cavities. – Potentially very attractive technology for the SPL (raw material cost, mechanical stiffness). – First results on low beta 704 MHz cavity: end R & D on H - ion source – CERN internal activity – Continuation of the work done for the Linac4 H - source and the SPL R & D supported within the SLHC-PP (until March 2011) – Focused on the immediate needs of Linac4 (2015) 3.Proposals submitted to the EC (today!) – “CRISP” : WP jointly with ESS and XFEL concerning the test of sc cavities – “LAGUNA-LBNO” DS: WP about proton driver for a neutrino facility at CERN 25/11/201011R.G.

25/11/ OUTLINE 1.Updated plans for the SPL R & D 2.Recent progress 3.Near future… R.G. 

Linac4 Civil Engineering 25/11/201013R.G. Linac4 Building Ready since 22/10/2010

“Mount-Citron”, September 2008 Linac4 Building construction – 2008/ /11/201014R.G.

Construction status 25/11/201015R.G.

Linac4 – schedule 16

Activity since June 2010 Redefinition of the workplan to fit with the MTP Integrated planning in preparation +Work within WGs [e.g. video-conferences of WG2 (~1/ month), technical discussions, contributions to conferences and workshops, visits, etc.](~1/ month) +Workshop on specification of prototype cryomodule: – 19 October 2010: +Collaboration Meeting: – End November 2010: 5th SPL Collaboration Meeting5th SPL Collaboration Meeting +Coordination (~2 meetings/month) (~2 meetings/month) +Collaborations: -Departure of TRIUMF -Letter of agreement with FNAL -Interest of TAC (Turkey) 25/11/201017R.G.

25/11/ OUTLINE 1.Updated plans for the SPL R & D 2.Recent progress 3.Near future… R.G. 

Near future -Extension of the study to a full proton driver for a neutrino factory -Optimization & cost estimate of full proton driver (contribution to the IDS-NF) … concerning the SPL itself (non-exhaustive list): -Construction of cavities in industry -Start of upgrade of cryogenics and overall infrastructure in SM18 -Specification & order of klystron modulator from industry (ESS) -Cryomodule design review (early 2011) + beginning of construction (IN2P3) -Specification & construction of tuners and He tanks (CEA) -LP-SPL CDR (jointly with PS2) (Beginning of 2011) -Construction & test of High power RF couplers + Review (March 2011) -Test of single cell sc cavity -Joint ESS-SPL meeting (June 2011) 25/11/201019R.G.